Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.0 CrAccepted-AOC CHANDRAKONA ROAD P O SATBANKURA DIST PASCHIM MEDINIPUR PIN 721253 | CHANDRAKONA | PASCHIM MEDINIPUR | WEST BENGAL | 721253 | 1 | Accepted-AOC L-1 bidder | |
| 2 | 2₹50.1 Cr+₹3.3 L (0.07%)Rejected-Finance CHANDRAKONA ROAD P O SATBANKURA DIST PASCHIM MEDINIPUR PIN 721253 | MEDINIPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721253 | 2 | Rejected-Finance L-2 | |
| 3 | Rejected-Technical NEAR DRM BUILDING P O ALIPURDUAR JN DIST ALIPURDUAR PIN 736123 WEST BENGAL | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736123 | - | Rejected-Technical Non-Responsive | |
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive | |
| 5 | Rejected-Technical 648 A BLOCK O NEW ALIPORE KOLKATA 700 053 | KOLKATA | KOLKATA | WEST BENGAL | 700053 | - | Rejected-Technical Non-Responsive |
Tender Value
₹63.6 Cr
EMD Value
₹65.8 L
Closing Date
15 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, NHC-III
O/o the SE, NHC-III, Matigara, Near Balason Bridge, Pin-734010
Performance Based Maintenance Contract -PBMC- work from km 718.000 to km 768.945 of NH-31 -new NH-17 - under NH Division No.X in the district of Alipurduar, West Bengal during the year 2023-24.
2024_MoRTH_792841_1
WBPW_Rd/SE/NHC3/PBMC20/2023-24
Open Tender
Civil Works - Highways
Percentage
730 days
Birpara - Pundibari
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Refer to RFP
₹65.8 L
O/o the SE, NHC-III, Matigara, Near Balason Bridge
18 Sept 2024
30 Jan 2024
23 Apr 2024
30 Jan 2024
15 Apr 2024
11 Mar 2024
28 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Item | |||||
| 1.01 | Cost of Initial Rectification (IR) [To be completed within 6 months from the date of notice to proceed] | 1 | Lum Sum | 1,57,19,169 | ₹1,57,19,169 |
| 1.02 | Cost of Periodic Maintanance (PM) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24 months from the date of notice to proceed] | 1 | Lum Sum | 46,59,12,621 | ₹46,59,12,621 |
| 1.03 | Cost of Routine Maintanance (RM) [for Total 60 months] | 1 | Lum Sum | 15,41,95,232 | ₹15,41,95,232 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_833298.xls
BOQ • 0.23 MB
138329918.pdf
Tender Documents • 2.56 MB
138329920.html
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .