Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.3 Cr
EMD Value
₹5.7 L
Closing Date
2 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shifting / re-routing of exiting 220 kV D/C Apta-PG Ckt-I & II between loc. No 608 & 611 infringing rail route of Panvel - Karjat Suburban corridor (Rly CH No 3400 - 3550 KM) at proposed Chikhale station.
MRVC-W-143~MRVC
MRVC-W-143
Open
Works - General
9 Months
Palghar, Maharashtra
₹0
₹5.7 L
2 Feb 2026
26 Dec 2025
19 Jan 2026
A-Schedule A - Supply
Fabrication, Galvanising, Supply at sites tore of towers (Viz,2°,15°,30°,60°) normal, its extensions with set of stubs, Superstructure, templates, step bolts, U-bolts, D'Shackles, Chain links etc, complete as per approved design & drawings.
Supply of insulator hard wares & conductor accessories for 0.4 ACSR equ. High Performance Conductor 1204130.0
Accessories for 0.4 ACSR equ. High Performance Conductor
Accessories for OPGW
B-Schedule B - Erection Testing & Commissioning
Check survey to carry out the checks as per approved profiles with Digital Theodalite 10 / total station / GPS etc. and location marking by fixing three pegs in alignment for suspension tower and by fixing five pegs in bisection for angle tower including bush cutting along the centre line of alignment and repeg marking if necessary etc.complete in all respect.Check survey including revision of profiles if required.
Concreting of foundation : Providing and casting in-situ cement concrete of trap 13 metal of size 20 to 40 mm as applicable, including cost of cement, sand, metal and water, frame work, finishing, compacting, coping and curing for 21 days complete as per drawing and direction of Engr. in-charge in the following grades -
Stub setting: Stub setting in all type of soils with the help of templete/PROp including transportation if required to the desired location, fixing the stubs in position as per the alignment, fixing and leveling the templete and the stub as directed.
Earthing of towers: Earthing of towers with counter poise earthing (with supply of 16 earthing material)including excavation of pits/trenches, laying of earth wire & fitting plates to tower legs including aupply of all material(viz G.I. wire, lugs,nuts & bolts etc.) as per drawing back filling complete in all respect as per direction of Engineer incharge.
Tower Erection: Complete erection of DC/MC towers (including special towers) with its extensions for 220 kV Lines (as per requirenment) with fixing of Bolts & Nuts, Tightening, 17 punching and fitting including attachments (like step bolts, ladders, platforms, "U" bolts, Shackles, hangers, strain plates etc.) and including tack tack welding and application of Zinc rich primer and two coats of enamei paints on welded portion (excluding stubs), including transpotation of material from site store to work site.
Electric tack welding (half round welding) to GI Nuts & Bolts of tower from thread 18 ends (Two spots to be welded to eachNut & Bolts nea rthread end)andpaintingtheweldedportionwithtwocoatsofZincrichpaint upto 220 KV DC. Two sections of each tower.(Per Tower)
Conductor Stringing : Stringing of three phases of two circuit (six conductors), on D/C, M /C towers with 0.4 ACSR Zebra conductor including transportation of Conductor and required 19 material from site stores to site locations, laying, paving, jointing, rough sagging, final sagging, clipping, fixing of tower accessories, hoisting of insulators, jumpering, etc. on D/C or M/C towers complete in all respect including tree cutting if required as per the direction of Engineer-in- charge.Stringing 3Ø 0.4 ACSR equi. HPC
Stringing of 48 Core optical Fiber ground Wire(OPGW)along with all hardware & Acessories etc.
Destringing of 0.4 ACSR/AAC Zebra Conductor on 220 kV D/C on D/C line fo rcrossing of EHV Power Lines,Railway,National Highway and River/Creek Crossing
Dismantling of 132 KV / 220KV / 400KV / horizontal tower including transportation to store as per direction
Soil Investigation: Detail soil investigation at site locations (i.e. 2 nos. location at this site)& submission of reports thereof.
Demobilisation & mobilisation of T&P, labours to site location to attend planned work in 'outage' from respective Dn (Applicable for min. 15 labours) per occasion
Erection of ERS Tower
Dismantling of ERS Tower
Stringing Conductor on ERS tower
Dismantling of Conductor From ERS Tower Per Track
Transport of Materials above 100 km
Loading and unloading of Materials by Crane
Insurance of Import Material
MSETCL Supervision & Guidance for ERS
C-Schedule C - Safety, Health & Environment
Payment for ensuring implementation and monitoring of all provisions in Safety, Health and Environmental Manual (SHE Manual) of MRVC during execution of works through entire contract period including deployment of required SHE organization as mentioned in SHE manual with required qualification, arranging training to all workers and staff engaged for work, regular health check up of labours, arranging SHE meetings, SHE Inspection, SHE audit, SHE communication i.e. posters/signage/VIDEO/Audio, SHE housekeeping, Safety training, provision of protective wears, labour welfare measures, Environmental management, traffic management of vehicles for construction activities, etc. complete as detailed in SHE manual.Notes: - 1. Rate for this item is to be 34 quoted as percentage of total cost of OHE Work , Payment against this item will be made at quoted percentage of value of work done & billed in each Interim payment Certificate/on account Bill. 2. Separate SHE organization/team shall be deployed. 3. Penalty will be imposed for failure or violations in implementation of SHE manual provisions as mentioned in Part V of SHE Manual. 4. Persistent failure or violation of SHE manual provision may attract termination of contract. 5. Only payment for Ambient Air quality monitoring, Noise Level Monitoring, Analysis of Drinking water and Analysis of soil sample will be paid separately under relevant items. 6. Payment will be released with each on account bill as per percentage quoted by the contractor for this item after recovering penalties imposed for violation of provision of manual, if any. 7. During non progress of work no payment will be made under this item.
D-Schedule D - Site Services
Hiring of 1 nos. fully furnished Porta Cabin with furniture, AC, computer & internet.
Providing 1 AC vehicles (Innova/Ertiga/Scorpio) of 2022 or latest model. This rate includes Driver salary, Cost of petrol/ Diesel, vehicle maintenance, taxes etc.
E-GST @ 18% n total cost
GST @ 18% on total value
Item Breakup - A-Schedule A - Supply
a) Danger Board
b) Number Plate
c) Phase plates (Set of RYB)
d) Circuit Plate
Anti - Climbing devices with Barbed wire. Total 29870.00 Item- 4 Insulators : S No. Item Description of Item Unit Qty Rate Amount No
a) 245kV 70kN Polymer Long Rod Insulator
b) 245kV 120kN Polymer Long Rod Insulator Total 658500.00 Supply of insulator hard wares & conductor accessories for 0.4 ACSR equ. High Performance Item- 5 Conductor S No. Item Description of Item Unit Qty Rate Amount No
d) DTN Total 5660256.00 Item- 7 Accessories for 0.4 ACSR equ. High Performance Conductor S No. Item Description of Item Unit Qty Rate Amount No
a) Mid Span Comp. Joints
b) Repair Sleeves
d) Vibration Dampers Total 1157994.00 Item- 9 Accessories for OPGW S No. Item Description of Item Unit Qty Rate Amount No
OPGW Tension Assy Set ASSEMBLY SET OF OPGW
48C OPGW Joint Box
OPGW Vibration Damper Vibration Damper for Each OPGW Wire HVDC
OPGW Down lead Clamp Total 101303.00
Item Breakup - B-Schedule B - Erection Testing & Commissioning
Soft rock/ Hard Murum
Dry fissured Rock/WFR considered here
Hard rock by chiseling MRVC-HQ-ELECTRICAL/MRVCL
B.C. Soil Total 2049390.00 Concreting of foundation : Providing and casting in-situ cement concrete of trap metal of size 20 to 40 mm as applicable, including cost of cement, sand, metal and water, frame work, finishing, Item- 13 compacting, coping and curing for 21 days complete as per drawing and direction of Engr. in- charge in the following grades - S No. Item Description of Item Unit Qty Rate Amount No
c)M-25 Total 12317764.00 Stub setting: Stub setting in all type of soils with the help of templete/PROp including transportation Item- 15 if required to the desired location, fixing the stubs in position as per the alignment, fixing and leveling the templete and the stub as directed. S No. Item Description of Item Unit Qty Rate Amount No
NDX + 6 Mtr (60 Deg) of unit Per Loc
NDX + 9 Mtr (60 Deg)unit Per Loc
NDX + 33 Mtr (60 Deg)of unit Per Loc Total 58070.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CHIKLES-SCC-COMPRESS.pdf
ATTACHMENT
ChikleITB_1.pdf
ATTACHMENT
ChikleBDSEQC.pdf
ATTACHMENT
ChickleBOQ.pdf
ATTACHMENT
ChickleWRQ.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .