Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
5 Oct 2026, 5:30 pm
EXECUTIVE ENGINEER
PANDAVNAGAR SHAHDOL
Strengthening of Bhursi Mantoliya Main Road to Majhauli Road Length 3.00 k.m.
2026_PWDRB_536285_1
NIT NO-09/2026-27/15-09-2026
Open Tender
Civil Works - Roads
Percentage
90 days
SHAHDOL
Please refer Tender documents.
8 documents required · 8 mandatory
₹15,000
₹2.7 L
15 Sept 2026
15 Sept 2026
7 Oct 2026
15 Sept 2026
5 Oct 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead upto 1000 metres
i) Lime /Cement Concrete
A. Lime Concrete, cement concrete grade M-10 and below | 61.18 | Cum | 529 | ₹32,364.22 |
| 2 | (Ix) Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works.
A. Up to 600 mm dia | 15 | Rm | 334 | ₹5,010 |
| 3 | Dismantling of Cement Concrete Pavement
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling Serviceable material at designated locations and disposal of unserviceable materials up to a lead of 1000 meters, | 135 | Cum | 1,296 | ₹1,74,960 |
| 4 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal up to 1000 meters.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting suitable earth to the embankment location and disposing off unsuitable earth with all lifts and lead up to 1000m as per relevant clauses of section-300 of specification. | 5,008.5 | Cum | 79 | ₹3,95,671.5 |
| 5 | Embankment /Sub Grade Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 15,085.8 | Cum | 298 | ₹44,95,568.4 |
| 6 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain or
foundation of structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. | 1,001.7 | Cum | 60 | ₹60,102 |
| 7 | Crusher Run Macadam Sub Base/Base Course Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller as per clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications.
(ii) For 37.5 mm maximum size | 3,381.68 | Cum | 1,198 | ₹40,51,252.64 |
| 8 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications.
A By Sensor Paver | 2,657.81 | Cum | 1,451 | ₹38,56,482.31 |
| 9 | Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting using vibratory roller of 80 to 100 kN static weight to meet requirement as per relevant clause of 400.
(B) Hard Shoulders (CBR value >12) | 4,771.26 | Cum | 398 | ₹18,98,961.48 |
| 10 | Prime Coat Over WMM/WBM
(i) Providing and applying primer coat with catonic bitumen emulsion on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means as per clause 502 of specifications | 10,631.25 | Sqm | 44 | ₹4,67,775 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.03 MB
NITDOCUMENTS.pdf
Tender Documents • 0.64 MB
BOQ_645187.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .