EE EnM WnS South II
Apollo B.P.S., Sarita Vihar (Near Apollo Hospital) New Delhi 110076
Replacement of Old Existing Pump Set with allied works at Pocket A-8 Kalkaji Extension BPS under Tughlakabad Constituency.
2021_DJB_207024_10
NIT No. 20 EE EnM WnS South II (2021-22)
Open Tender
Miscellaneous Works
Works
60 days
EE EnM WnS South II
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
25 Aug 2021
13 Aug 2021
19 Aug 2021
13 Aug 2021
19 Aug 2021
13 Aug 2021
Replacement of old existing pump set no.3 with allied works at BPS are as below:- Supply of items - Supply of horizontal split casing centrifugal pump with CI impeller, CI body, S.S. Shaft & S.S. Sleeve, Suction & delivery size 125 x 100 mm suitable for head 42 mtr., discharge : 180 m3 /hr along with suitable base frame and Coupling. Make of Pump : - Wilo Matter & Platt/kirloskar/DJB Approved
Supply of CI Double Flanged manually operated Non rising Sluice Valve of size 100 mm dia PN 1.0 Make – Kirloskar/IVC/DJB approved
Supply of CI Double Flanged manually operated Non rising Sluice Valve of size 150 mm dia PN 1.0. Make – Kirloskar/IVC/DJB approved
Supply of CI Double Flanged swing type NRV of size 100 mm dia PN 1.0 Make – Kirloskar/IVC/DJB approved
Supply of rubber gasket of size 150 mm dia of thickness 6 mm
Supply of rubber gasket of size 100 mm dia of thickness 6 mm
Supply of good quality of nut bolt and washer
Job Work - Disconnecting the electric connections of pump set. Dismantling of old pump set after disconnecting from suction and delivery pipeline, decoupling with motor i/c taking out old pump and motor from existing system etc., closing of suction & delivery line with the help of suitable size dead flange.
Dismantling and taking out M S Base frame from RCC foundation after cutting of nut bolts, Breaking the Damaged RCC foundation of the old pump set by the help of concrete breaker and labour. Also taking out malba from the pump house by manual labour & dumping the same as per directions.
Making a RCC foundation of new Pump Set of size 6’x4’x3’ of material Ratio 1:1:5:3 cement concrete of new Pump set with foundation/rag bolts as per site requirement.
Installation/fixing of new pump set along with new base frame on RCC foundation, making electrical connections of motor.
Making suction & delivery connections with pump set with the help of suitable size MS Gap piece, flange, reducer, nut bolts, rubber packing etc by using Gas cutter, welding set, manual labour etc
Installation charges of new pumps and refitting the pump set as per original position with proper alignment and also making of all electrical connections, fitting all new valves, bends etc. in original position with the help of all labour like Fitter, Welder Cutter ,Helper ,Beldar, Electrician, and Supervisor etc. and material like Welding machine ,Cutter Set ,Oxygen Cylinder, Nut Bolt ,Packing Sheet ,welding rods and T&P etc. and i/c cartage
Testing & commissioning of complete pump set with all the required arrangement
Painting of the pipe line installed at BPS including all equipments like motor , Valves and NRV etc.
Raj Engineering Co.
JAI DURGA ENGINEERS AND CONTRACORS
Shakti Trading Co.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .