| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹8.0 L Quoted ₹9.5 L | L1 | Accepted-AOC Award of Work |
| Sl No | Description | Qty | Unit | petchimuthu L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil for foundation. | 38 | M3 | 160 ₹6,080 Lowest |
| 2.00 | Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete | 4 | M3 | 1,600 ₹6,400 Lowest |
| 3.00 | PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete. | 4 | M3 | 6,600 ₹26,400 Lowest |
| 4.00 | RCC 1:1.5:3 using 12 to 20mm metal without formwork using for coloumn Raft concreting work including cost of all labour, lead, lift, etc., complete. | 10 | M3 | 8,200 ₹82,000 Lowest |
| 5.00 | RCC 1:1.5:3 using 12 to 20mm metal with formwork using for coloumn concreting work including cost of all labour, lead, lift, etc., complete. | 5 | M3 | 30,000 ₹1,50,000 Lowest |
| 6.00 | RCC 1:1.5:3 using 12 to 20mm metal with formwork using for beam concreting work including cost of all labour, lead, lift, etc., complete. | 11 | M3 | 15,000 ₹1,65,000 Lowest |
| 7.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete | 1,280 | Kg | 100 ₹1,28,000 Lowest |
| 8.00 | PCC 1:2:4 using 20 mm metal without formwork using for foundation concreting work including cost of all labour, lead, lift etc., complete | 12 | M3 | 7,700 ₹92,400 Lowest |
| 9.00 | PCC 1:2:4 using 20 mm metal with formwork using for foundation concreting work including cost of all labour, lead, lift etc., complete | 8 | M3 | 11,500 ₹92,000 Lowest |
| 10.00 | Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete | 89 | M2 | 360 ₹32,040 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
11 Feb 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Construction of RCC Pillars and cross beams for fencing wall at Nallandipuram 110 KV SS
2026_EB_651841_1
SE/GCC/Madurai F. Specn. No.066/2025-26
Limited
Civil Works
Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
22 May 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
11 Feb 2026
5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil for foundation. | 38 | M3 | - | - |
| 2 | Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete | 4 | M3 | - | - |
| 3 | PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete. | 4 | M3 | - | - |
| 4 | RCC 1:1.5:3 using 12 to 20mm metal without formwork using for coloumn Raft concreting work including cost of all labour, lead, lift, etc., complete. | 10 | M3 | - | - |
| 5 | RCC 1:1.5:3 using 12 to 20mm metal with formwork using for coloumn concreting work including cost of all labour, lead, lift, etc., complete. | 5 | M3 | - | - |
| 6 | RCC 1:1.5:3 using 12 to 20mm metal with formwork using for beam concreting work including cost of all labour, lead, lift, etc., complete. | 11 | M3 | - | - |
| 7 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete | 1,280 | Kg | - | - |
| 8 | PCC 1:2:4 using 20 mm metal without formwork using for foundation concreting work including cost of all labour, lead, lift etc., complete | 12 | M3 | - | - |
| 9 | PCC 1:2:4 using 20 mm metal with formwork using for foundation concreting work including cost of all labour, lead, lift etc., complete | 8 | M3 | - | - |
| 10 | Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete | 89 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_781621.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].