Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-Finance | ₹7.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.3 LAccepted-Finance | ₹7.3 L | L2 | Accepted-Finance L2 |
| 3 | L3₹7.5 LAccepted-Finance | ₹7.5 L | L3 | Accepted-Finance L3 |
| 4 | L4₹8.4 LAccepted-Finance | ₹8.4 L | L4 | Accepted-Finance L4 |
| 5 | L5₹8.5 LAccepted-Finance | ₹8.5 L | L5 | Accepted-Finance L5 |
Tender Value
₹10.4 L
EMD Value
₹20,840
Closing Date
30 Mar 2026, 6:00 pmClosed
Executive Enigneer
pwd division udhampur
Construction of 01 ACR at Primary School Garhi (Under SAMAGRA) (3rd Call)
2026_PWDJK_306619_8
e-NIT No. 174 of 2025-26 Dated 23-03-2026
Open Tender
Civil Works
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Division Udhampur
₹20,840
28 Apr 2026
23 Mar 2026
31 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | |||||
| 1.1 | All kinds of soil @80% | - | Cum | - | - |
| 1.2 | Ordinary rock @20% | - | Cum | - | - |
| 2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring andshuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | |||||
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring andshuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20% plums | |||||
| 4Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
| 4.1 | Foundations, footings, bases of columns etc. for mass concrete | - | Sqm | - | - |
| 4.2 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | - | Sqm | - | - |
| 4.3 | Suspended floors, roofs, landing, balconies and access platforms. | - | Sqm | - | - |
| 4.4 | Edges of slabs and breaks in floors and walls Under 20 cm wide | - | Rmt. | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_995507.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid