Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹91.4 LAdmitted-Finance | +15.00% | ₹91.4 L | L1 | Admitted-Finance |
| 2 | L2₹94.6 L+₹3.3 L (3.57%)Admitted-Finance 4TH FLOOR OLYMPUS 179 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 | MUMBAI | MAHARASHTRA | 400001 | +19.11% | ₹94.6 L+₹3.3 L (3.57%) | L2 | Admitted-Finance |
Tender Value
₹79.5 L
EMD Value
₹1.6 L
Closing Date
10 Aug 2026, 2:00 pmClosed
XEn WDSC Nohar
XEn WDSC Nohar
Construction of 30KL Tanka with artificial catchment at Arable land(41 nos) in MJSA 2.2 GP- Khuiyan P.S.- Nohar - Package 4
2026_WDSC_579359_1
Construction of 30KL Tanka with artificial catchment at Arable land(41 nos) in MJSA 2.2 GP- Khuiyan
Open Tender
Construction Works
Percentage
Nohar
As in SBD
2 documents required · 2 mandatory
₹1,000
As in SBD
₹1.6 L
Yes
26 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation for foundation trenches upto 1.5 mt depth including ramming the bottom, finishing & dressing of sides, filling the gape with soil & disposal of surplus soil upto 50 mt. lead (In ordinary soil / loose soil). | - | - | - | - |
| 2 | 0.00-1.50 mtr | 862.34 | cum | 143.92 | ₹1,24,107.97 |
| 3 | 1.50-3.00 mtr | 700.8 | cum | 166.72 | ₹1,16,837.38 |
| 4 | 3.00-4.50 mtr | 345.73 | cum | 189.52 | ₹65,522.75 |
| 5 | P/L cement concrete for foundation in 1:5:10 ( 1 cement : 5 bajri : 10 stone ballast) including curing, compaction etc complete(cum)(RDPR BSR item 9A) | 70.08 | cum | 3,629.72 | ₹2,54,370.78 |
| 6 | Ist class brick masonary for foundation & plinth in 1:6 (1 cement : 6 bajri) filling the joints, curing etc complete.(Cum)(RDPR BSR item 20A) | 800 | cum | 4,075.31 | ₹32,60,248 |
| 7 | P/L C/C in1:1.5:3 ratio in R.C.C. work for slab,lintel,beam,chhajja etc. compation &curing complete using 12mm size of stone ballast excluding cost of centering & shuttetring(Cum) (RDPR BSR item 13B) | 23.63 | cum | 6,103.97 | ₹1,44,236.81 |
| 8 | P/L reinforcement for R.C.C. work as per specification(RDPR BSR item 61) | 2,363.16 | Kg | 86.18 | ₹2,03,657.13 |
| 9 | Centering & Shuttering for R.C.C. work upto 4.5m height including laying & removing complete(RDPR BSR item 93B) | 132.17 | sqm | 270.38 | ₹35,736.12 |
| 10 | P/L stone patties roof as per jodhpur practice, including filling the gape with stone chips in 1:4 cm, as per specification (sqm.) Span 0-1.5(RDPR BSR item 45B) | 458.9 | sqm | 1,810.6 | ₹8,30,884.34 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
sbd1.pdf
Tender Documents • 15.99 MB
BOQ_1029549.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .