| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-AOC | ₹2.2 Cr | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.2 Cr+₹6,018 (0.03%)Rejected-AOC | ₹2.2 Cr+₹6,018 (0.03%) | 2 | Rejected-AOC Accepted |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Hard copy not submitted |
Tender Value
₹2.2 Cr
EMD Value
₹4.5 L
Closing Date
5 Feb 2024, 2:00 pmClosed
C.E. PWD (Roads), Guwahati-3
O/o the C.E. PWD (Roads), Guwahati-3
Improvement of (i) Balance portion of Rupkonwar path at Natun Chasal (ii) Anamika Path and (iii) Ankur Path under Mukhya Mantrir Paki Path Nirman Aachani for the year 2023-24.
2024_PWD_35616_3
CE/CW/40/23-24/1_MMPPNA_CITY
Open Tender
Civil Works – Roads
Item Rate
90 days
Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,500
₹4.5 L
Yes
O/o the C.E. PWD (Roads), Guwahati-3
10 Apr 2024
20 Jan 2024
5 Feb 2024
20 Jan 2024
5 Feb 2024
21 Jan 2024
20 Jan 2024 - 5 Feb 2024
29 Jan 2024
Amount
(i) Balance portion of Rupkonwar path at Natun Chasal Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 (Manual method should be adopted where machines can not be deployed due to site condition)
By Mix in Place Method (Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.. (ii) For Grading-II materials
Water Bound Macadam-II(Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -II as per Technical Specification Clause 405 (A) By manual Means
Water Bound Macadam-III(Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -III as per Technical Specification Clause 405 (A) By manual Means
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage Including Edge block/ Edge restraints
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(b) Rubble Stone Masonry in Cement Mortar
(Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(i) Marshy soil (A) Manual Means (Depth upto 3m)(Without de-watering)
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A With crushed Stone
Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with Heavy Duty 100 mm Dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards draining face complete as per drawing, Technical Specification Section 2700 and as directed by Engineer.
Back filling Providing back filling with granular material behind abutment, wing wall and return wall complete as per drawing, Technical Specification Section 300, IRC: 78 and as directed by Engineer.I) Granular Material
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. E. RCC Gr. M20 (a) height upto 5.00 m,case-1 Using concrete mixer
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 (ii) 60 cm Equilateral Traingle
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 (ii) 60 cm Circular
(ii) Anamika Path Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1
By Mix in Place Method (Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.. (ii) For Grading-II materials
Water Bound Macadam-III(Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -III as per Technical Specification Clause 405 (A) By manual Means
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage Excluding Edge block/ Edge restraints
Earthwork in exavation for foundation of structure as per drawings and technical specification clause 307 including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material (
Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with Heavy Duty 100 mm Dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards draining face complete as per drawing, Technical Specification Section 2700 and as directed by Engineer.
Back filling Providing back filling with granular material behind abutment, wing wall and return wall complete as per drawing, Technical Specification Section 300, IRC: 78 and as directed by Engineer.I) Granular Material
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 I Coursed rubble masonry (1st sort) In 1:3 cement mortar
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. E. RCC Gr. M20 (a) height upto 5.00 m,case-1 Using concrete mixer
Maintenance Work 1st year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
2nd year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
3rd year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
4th year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
(iii) Ankur Path under Mukhya Mantrir Paki Path Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1
By Mix in Place Method (Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.. (ii) For Grading-II materials
Water Bound Macadam-II(Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -II as per Technical Specification Clause 405 (A) By manual Means
Water Bound Macadam-III(Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading -III as per Technical Specification Clause 405 (A) By manual Means
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause
Bituminous Concrete: Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to .6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) I With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) A With 60/70 or VG-30 grade bitumen (i) for Grading I (19 mm nominal size)
(Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A With crushed Stone
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with Heavy Duty 100 mm Dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards draining face complete as per drawing, Technical Specification Section 2700 and as directed by Engineer.
Back filling Providing back filling with granular material behind abutment, wing wall and return wall complete as per drawing, Technical Specification Section 300, IRC: 78 and as directed by Engineer.I) Granular Material
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. E. RCC Gr. M20 (a) height upto 5.00 m,case-1 Using concrete mixer
Maintenance Work 1st year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
2nd year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
3rd year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
4th year Routine Maintenance(Rate to be quoted at Column 13 by bidder should be same as mentioned at column 6)
M/s Manisha Construction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .