Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹2.7 LAccepted-AOC | ₹2.7 L | 2 | Accepted-AOC lowest amount quotted |
| 2 | 1₹2.7 LRejected-AOC KANIYANUR PANCHAYAT | ₹2.7 L | 1 | Rejected-AOC highest amount quotted |
| Sl No | Description | Qty | Unit | OM SAKTHI AGENCIES L1 | SPR TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert Near PUE School At Sittanthangal H/O Sittanthangal Panchayat in Thimiri Panchayat Union | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 48.11 | Cum | 263.78 ₹12,690 | 265 ₹12,749 |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.37 | Cum | 5,490.7 ₹29,485 | 5,492 ₹29,492 |
| 1.03 | Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc., | 52.71 | Sqm | 547 ₹28,832 | 550 ₹28,991 |
| 1.04 | Above GL | 13.42 | Sqm | 1,095 ₹14,695 | 1,095 ₹14,695 |
| 1.05 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc complete | 13.62 | Cum | 5,800 ₹78,996 | 5,800 ₹78,996 |
| 1.06 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc complete | 2.19 | Cum | 6,900 ₹15,111 | 6,902 ₹15,115 |
| 1.07 | RCC 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 3.62 | Cum | 9,409.4 ₹34,062 | 9,410 ₹34,064 |
| 1.08 | Supplying Fabrication of steel for works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 165 | Kg | 91.99 ₹15,178 | 93 ₹15,345 |
| 1.09 | Provision for Name board | 1 | Each | 1,000 ₹1,000 | 1,500 ₹1,500 |
Tender Value
₹2.8 L
EMD Value
₹2,750
Closing Date
4 Dec 2025, 3:00 pmClosed
Block developement officer
Block developement office
Construction of Culvert Near PUE School At Sittanthangal H/O Sittanthangal Panchayat in Thimiri Panchayat Union
2025_RDTN_628170_1
A2/2396/2023
Open Tender
Civil Works
180 days
Block developement office
Construction of Culvert Near PUE School At Sittanthangal H/O Sittanthangal Panchayat in Thimiri Panchayat Union
2 documents required · 2 mandatory
₹0
₹2,750
Block developement office
28 Feb 2026
2 Dec 2025
4 Dec 2025
2 Dec 2025
4 Dec 2025
2 Dec 2025
2 Dec 2025
Construction of Culvert Near PUE School At Sittanthangal H/O Sittanthangal Panchayat in Thimiri Panchayat Union
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS. STAIRCASE WAIST and landing slabs, landing beams, canopy etc.,
Above GL
Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc complete
RCC 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying Fabrication of steel for works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Provision for Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
Chittanthangalculvert.pdf
Tender Documents • 0.25 MB
BOQ_751036.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid