| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹20.2 L+₹33,664.80 (1.70%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M.Rajendran L2 | CHITHRAVARSINI AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | earth work Excavation in all soild with initial lead and lift etc., complete for drain | 378 | M3 | 182 ₹68,796 | 181 ₹68,418 Lowest |
| 2.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found | necessary and laid in layers of not more than 15 cm thick _ and compacted, etc., complete complying with standard specification. | 49 | M3 | 6,000 ₹2,94,000 | 5,590 ₹2,73,910 Lowest |
| 3.00 | centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc. | 818 | M2 | 470 ₹3,84,460 Lowest | 489 ₹4,00,002 |
| 4.00 | Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding ) centering, shuttering, and cost of reinforcement grill but | including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 142 | M3 | 6,500 ₹9,23,000 | 6,319 ₹8,97,298 Lowest |
| 5.00 | Plastering with cement mortar 1:S5(one cement and five ) sand) 12mm thick in all floors complying with standard specifications | 215 | M2 | 300 ₹64,500 | 292 ₹62,780 Lowest |
| 6.00 | Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 30 | M2 | 1,090 ₹32,700 | 1,086 ₹32,580 Lowest |
| 7.00 | supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers. | 10 | Qtl | 9,350 ₹93,500 | 9,321 ₹93,210 Lowest |
| 8.00 | Reinforced cement concrete of 1:1.5:3 mix (one cement, one and half of sand and three of aggregate) using Machine crushed hard broken granite stone jelly 20mm for RCC works in all types of foundation footings columns, Floor beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under separate items but including curing Etc. and including fixing fan clamps or hooks, after lying of electrical canduit pipes, junction boxes wherever required complete, complying with standard specificaions as directed by the engineer. | 10 | M3 | 9,390 ₹93,900 | 9,373 ₹93,730 Lowest |
| 9.00 | Supplying and fixing of SFRC man hole cover complete complying with standard specification. | 4 | Nos | 3,250 ₹13,000 | 3,244 ₹12,976 Lowest |
| 10.00 | Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 4 | M3 | 6,990 ₹27,960 | 6,963 ₹27,852 Lowest |
Tender Value
₹23.9 L
EMD Value
₹23,900
Closing Date
13 Oct 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Strom water Drain and Culvert at Vadakku Thottam and Cross Road and Poonthottam Street in Ward No.30 , North Zone
2025_MAWS_612339_5
e48/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per Tender Document
5 documents required · 5 mandatory
₹0
₹23,900
8 Nov 2025
8 Oct 2025
14 Oct 2025
8 Oct 2025
13 Oct 2025
8 Oct 2025
Amount
earth work Excavation in all soild with initial lead and lift etc., complete for drain
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found | necessary and laid in layers of not more than 15 cm thick _ and compacted, etc., complete complying with standard specification.
centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc.
Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding ) centering, shuttering, and cost of reinforcement grill but | including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:S5(one cement and five ) sand) 12mm thick in all floors complying with standard specifications
Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete
supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers.
Reinforced cement concrete of 1:1.5:3 mix (one cement, one and half of sand and three of aggregate) using Machine crushed hard broken granite stone jelly 20mm for RCC works in all types of foundation footings columns, Floor beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under separate items but including curing Etc. and including fixing fan clamps or hooks, after lying of electrical canduit pipes, junction boxes wherever required complete, complying with standard specificaions as directed by the engineer.
Supplying and fixing of SFRC man hole cover complete complying with standard specification.
Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Conveyance of excavated earth from the site 2Km lead including loading and unloading etc completed
M.Rajendran (BID ID -1485868)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .