Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹25.8 L+₹3.0 L (13.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹25.8 L+₹3.0 L (13.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹25.9 L+₹3.1 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹36.5 L+₹13.8 L (60.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.5 L
EMD Value
₹77,080
Closing Date
18 Mar 2026, 4:00 pmClosed
Executive Engineer RnB Handwara
Executive Engineer RnB Handwara
CONSTRUCTION OF PILE SHORING ALONG THE BOUNDARY WALL OF PROPOSED OXYGEN PLANT AT GMC HANDWARA (Balance Work)
2026_PWDJK_305514_1
NIT NO 72 OF 2025-26
Open Tender
Civil Works
Percentage
20 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Handwara
₹77,080
Yes
23 Mar 2026
7 Mar 2026
19 Mar 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of Shoring System | - | - | - | - |
| 2 | Row / Linear Piling at Spaces Boring, Providing and installing cast-in-situ reinforced cement concrete piles of specified grade concrete mix, diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embeded in the pile cap etc. all complete. (Length of pile for payment Shall be measured from top of shoe to the bottom of pile cap)
21.1.3 500 mm dia piles in M25 mix | 540 | RM | 3,572.4 | ₹19,29,096 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete as Reinforcement in Piles. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 15,621.56 | Kgs | 123.2 | ₹19,24,576.19 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_992288.xls
BOQ • 0.22 MB
finalextensionnoticeNITno72.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .