Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-AOC 19 62 1ST FLOOR WEST MOTI BAGH SARAI ROHILLA NEW DELHI 110035 | NEW DELHI | NEW DELHI | DELHI | 110035 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹38.9 L+₹40,419 (1.05%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹45.1 L+₹6.7 L (17.3%)Rejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L3 | Rejected-Finance Being L3 | |
| 4 | Rejected-Technical 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | - | Rejected-Technical Requisite documents not uploaded |
Tender Value
₹44.8 L
EMD Value
₹89,500
Closing Date
26 Nov 2022, 6:00 pmClosed
CWE (AF) Gurgaon
HQ CWE (AF) Gurgaon, Old Palam Road, Delhi Cantt-10
REPAIR COMPREHENSIVE MAINT OF VRV AC AB GROUP CASSETTE AC PRECISION AIR CONDITIONING, HI-WALL SPLIT AC UPS AND OTHER ALLIED WORKS AT IMAC STN GURGAON UNDER GE (AF) GURGAON
2022_MES_552196_2
CWE/GGN/GT-142/2022-23
Open Tender
Electrical and Maintenance Works
Works
333 days
AF Stn Gurgaon
As per NIT
7 documents required · 7 mandatory
₹500
GE (AF) Gurgaon
₹89,500
Yes
4 Jan 2023
4 Nov 2022
28 Nov 2022
4 Nov 2022
26 Nov 2022
12 Nov 2022
4 Nov 2022 - 11 Nov 2022
Amount
Comprehensive, preventive and periodical maintenance of VRV AC A&B Group (Make: VOLTAS, Model: VDV-450(16) W/DRNI C) of capacity (total outoodoor of capacity -96 HP or total Indoor capacity- 97.5 TR, (indoor unit -2TR-12 Nos, 03 TR-7 Nos, 04 TR-7 Nos, 1.5 TR-8 Nos, 2.5 TR-5 Nos) by Inspecting the plant system and carry out quarterly inspection as a part of preventive maintenance with relevant PM checklists, Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant,Checking the system for any leaks and rectification of leaks found, Taking set of readings and evaluating to ensure satisfactory performance of the plant, Checking the Refrigeration control system for operation and adjusting the settings, Checking the functioning of compressors and its accessories, Cleaning the IDU evaporator ODU condenser coils once a year, Lubricating the bearings of motors, & fans when found necessary, Quarterly inspection of belts adjusting the tension and replacing the worn out belt as and when found required, Replenishment of refrigeration gas as a result of fare wear and tear, Overhauling the components of the equipment at site or in service station as and when required, Checking of the microprocessors PCBs and sensors of IDU/ODU units for its proper functioning and repair replacement of the same if found necessary, Attending to complain breakdown calls whenever required, Carrying out external cleaning (chemical or with water of condensor coils of outdoor unit,Reporting the healthiness of the plant and suggesting improvements if any, all as directed and specified by Engr-in-charge.
Note : (i) The tenderer shall have to replace the U/s material with OEM material only. The cost of replaced major spare parts will be paid and measured seperatly. Old material will be contractor property and credit included in the rate quoted. (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000/ per hour to be imposed and amount of penality will be deducted from RAR. (iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically ,so contractor to specify the telephone no who will receive the complaint round the clock. After attending the complaint contractor will obtain the signature from rep of User/AGE/GE every day as a token of complaint attended. (vi) The Schedule 'A' consists of Comprehensive, preventive and periodical maintenance of VRV AC A&B Group (Make: VOLTAS, of indoor capacity 97.5 TR, outdoor capacity (96 HP) installed at IMAC station Under GE (AF) Gurgaon.
(vii) The work under above item Ser No 1.0 to 1.01 shall be carried out through authorized dealer/ repairer of M/s VOLTAS LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge. Comprehensive and preventive maintenance shall be carried out by contractor through trained Engineer of M/s Voltas Ltd only. The MOU will be signed by both the parties (i.e) contractor and OEM on a non judicial stamped paper of Rs 100/- duly notarized. All the Bidders shall upload a letter of 'Intent of MOU' through OEM ie M/s Voltas Ltd in Cover-1 reagrding the willingness of MoU to be done between Bidder & OEM post acceptance of the Tender. The letter of declaration will be as per format at Ser Page No 142(R) of Tender Documents. Failing to which Bidders shall be rejected for bid opening of Cover-II. The successful L1 Bidder shall submit MOU as per format within 07 days from date of issue of Work Order No 1, failing which late charges @0.5% OF CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW 2249 if MoU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by Department and work may be get executed under other means. Any Condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MoU with L1 bidder.
The following item sr no. 2.01 to 2.14 for replacement not included in the quoted rates by the contractor under comprehensive/preventive/periodical maintenance for VRV AC A&B group under item srl no. 1, shall be measured and paid separately.
S&F in replacement of Fan motor Inverter PCB 8 - 16 HP
S&F in replacement of Electronic Expansion Valve wire
S&F in replacement of Main IPM Service Pack
S&F in replacement of Fan relay control board
S&F in replacement of Lightning Proof Board
S&F in replacement of Magnetic Contactor A26D-30-01
S&F in replacement of DC fan motor ZKSP-560-8-1
S&F in replacement of AC fan YKS-380-4-1
S&F in replacement of Main Control IPM Card
S&F in replacement of inverter PCB
S&F in replacement of Inverter Compressor
S&F in replacement of Fix Compressor
S&F in replacement of Four -way reverse valve
S&F in replacement of Refrigerant R410A
Comprehensive, preventive and periodical maintenance of 3 Nos Precision Air Conditioner of capacity each 23 TR Each (Make: STULZ Chspl INdia, Model No-SEC852A, Microprocessor type C-7000) ,by Inspecting the plant system and carry out preventive maintenance as per the standard practice monthly in contract period, Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant,Checking the system for any leaks and rectification of leaks found,ensure drain is not clogged Taking set of readings and evaluating to ensure satisfactory performance of the plant, Checking the Refrigeration control system for operation and adjusting the settings, Checking the functioning of compressors and its accessories, Cleaning up of units & air filters, check the proper functioning of controllers , Lubricating the bearings of motors, & fans when found necessary,Replenishment of refrigeration gas as a result of fare wear and tear, attend all breakdowncalls with in 2-4 hours, replaced worn out parts with in 24 hours subject to normal working days, Overhauling the components of the equipment at site or in service station as and when required, Checking of the microprocessors PCBs and sensors of IDU/ODU units for its proper functioning and repair replacement of the same if found necessary, Attending to complain breakdown calls whenever required, Reporting the healthiness of the plant and suggesting improvements if any, all as directed and specified by Engr-in-charge.
Note : Following component replacement are deemed to be included in the rate quoted by the contractor under comprehensive maintenance against item Srl No 3.00. (i) Contractor is responsible for repair/replacement of existing make/model of following components:- (ii) Compressor, main controller of PAC Units, switch gear components in the unit, Fan motor (Indoor), Fan motor(outdoor), filter drier, solenoid valve, expansion valve, microprocessors PCBs and sensors of IDU/ODU units, condensor coil, charging of Refrigerant gas at any time/specified qty, sensors, capacitors, all worn out PCB card, indicators, wiring/connectors, Door, sob components belts,coils,including all minor/major spare parts.
Following component and replacement of items against item Srl No 3.00. above item shall be paid and measured separately.
Supply & Fix in replacement of Display Controller for PAC of exiting make & specdification all as specified and directed.
Supply and charging refrigerant R-407 C after nitrogen testing in new sealed cylinder complete all as per site requirement as directed by Engr-in-Charge.
Supply & Fix in replacement of Humidifier Bottle for PAC exiting make & specdification all as specified and directed.
Note for Item No 3.00 & 4.00 (i) The tenderer shall have to replace the U/s material with OEM material only. The cost of replaced major/minor spare parts included in comprehensive maintenance of contract.Old material will be contractor property . (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000 / per hour to be imposed and amount of penality will be deducted from RAR. (iv) The cost of transportation (to and from) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically ,so contractor to specify the telephone no who will receive the complaint round the clock. After attending the complaint contractor will obtain the signature from rep of User/AGE/GE every day as a token of complaint attended. (vi) The Schedule 'A' consists of Comprehensive, preventive and periodical maintenance of 3 Nos Precision Air Conditioner of capacity each 23 TR Each (Make: STULZ Chspl INdia, Model No-SEC852A, Microprocessor type C-7000) installed at IMAC station Under GE (AF) Gurgaon. The work under this contract shall be carried out through authorized dealer/ repairer of M/s STULZ Chspl INdia LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge.
Comprehensive and preventive maintenance The work under above item 3.0 to 4.04 shall be carried out through authorized dealer/ repairer of M/s STULZ Chspl INdia LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge. Comprehensive and preventive maintenance shall be carried out by contractor through trained Engineer of M/s STULZ Chspl INdia LTD only. The MOU will be signed by both the parties (i.e) contractor and OEM on a non judicial stamped paper of Rs 100/- duly notarized. All the Bidders shall upload a letter of 'Intent of MOU' through OEM ie M/s STULZ Chspl INdia LTD in Cover-1 reagrding the willingness of MoU to be done between Bidder & OEM post acceptance of the Tender. The letter of declaration will be as per format at Ser Page No 142(R) of Tender Documents. Failing to which Bidders shall be rejected for bid opening of Cover-II. The successful L1 Bidder shall submit MOU as per format within 07 days from date of issue of Work Order No 1, failing which late charges @0.5% OF CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW 2249 if MoU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by Department and work may be get executed under other means. Any Condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MoU with L1 bidder.
Comprehensive, preventive and periodical maintenance of total 4 Nos UPS of capacity (60 KVA- 02 Nos, Sr No. 201306NR0525, 201306NR0526, 200 KVA- 02 Nos Sr No. 201311NR0591, 201302NR0420) make/model Liebert.NXr/VERTIV Energy Private Limited, by Cleaning up of Unit, Visual Inspection to check any deformation, Checking and Adjustment (If needed) of Power parameters like input. Output, DC voltage & Current, Checking and Adjustment of Control parameters on different PCBs,Tightness of all connection,Functional Checking up of Rectifier section, Functional Checking up of Inverter section, Functional Checking up of Static Switch Section, With user approval, perform operational test of the system including unit transfer and battery discharge, Attending to complain breakdown calls whenever required, UPS failing to transfer to battery mode in the event of incoming power failure, Battery Breaker tripping due to battery failure, Battery Failure, UPS unable to transfer load on to the parallel UPS (Redundancy Failure), UPS tripping on High temperature conditions, Control Card, major components failure such as IGBT’s, SCR’s & Wire wound Components within the UPS, Module Failure, Wire Harness damage, Reporting the healthiness of the plant and suggesting improvements if any, all as directed and specified by Engr-in-charge. Defective parts discovered during maintenance repaired or replaced by new or as new parts. Spares replaced will be either of the same make or equivalent. Old/U/sParts removed shall be property of contractor. Batteries, Switch gears & Wound components is not part of Comprehensive AMC Contract.
Note for item No 5.00 (i) The tenderer shall have to replace the U/s material with OEM material only. The cost of replaced major/minor spare parts included in comprehensive maintenance of contract.Old material will be contractor property . (ii) In case any accident occur of any Indl like Mechanic/Helpers/users during maintenance/operation of above mentioned Airconditioner/unit, contractor is liable to pay compensation to the Indl as decided by the competent authority. Principal Employer will not be responsible for the same. (iii) If complaint is not attended by contractor with in five hour the penality of Rs 1000 / per hour to be imposed and amount of penality will be deducted from RAR. (iv) The cost of transportation (to and fro) for all kind of necessary equipment / T&P shall be arranged/brought by contractor to complete the job at site , stationary for maintenance of record, no extra cost shall be paid to the contractor to this effect. (v) Complaint shall be lodged by telephonically ,so contractor to specify the telephone no who will receive the complaint round the clock. After attending the complaint contractor will obtain the signature from rep of User/AGE/GE every day as a token of complaint attended. (vi) The Schedule 'A' consists of Comprehensive, preventive and periodical maintenance of 4 Nos UPS of capacity (60 KVA- 02 Nos, Sr No. 201306NR0525, 201306NR0526, 200 KVA- 02 Nos Sr No. 201311NR0591, 201302NR0420) make/model Liebert.NXr/VERTIV Energy Private Limited, installed at IMAC station Under GE (AF) Gurgaon. The work under this contract shall be carried out through authorized dealer/ repairer of M/s VERTIV Energy Private Limited only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge.
Comprehensive and preventive maintenance The work under abov eitem Ser No 5.0 to 5.01 shall be carried out through authorized dealer/ repairer of M/s VERTIV Energy Pvt LTD only all as described in schedule 'A' special conditions, particular specification, MES SSR and as directed by GE/Engineer-in-charge. Comprehensive and preventive maintenance shall be carried out by contractor through trained Engineer of M/s Voltas Ltd only. The MOU will be signed by both the parties (i.e) contractor and OEM on a non judicial stamped paper of Rs 100/- duly notarized. All the Bidders shall upload a letter of 'Intent of MOU' through OEM ie M/s VERTIV Energy Pvt LTD in Cover-1 reagrding the willingness of MoU to be done between Bidder & OEM post acceptance of the Tender. The letter of declaration will be as per format at Ser Page No 142(R) of Tender Documents. Failing to which Bidders shall be rejected for bid opening of Cover-II. The successful L1 Bidder shall submit MOU as per format within 07 days from date of issue of Work Order No 1, failing which late charges @0.5% OF CA amount per week from date of acceptance shall be imposed on contractor. The contract shall be liable to be cancelled without any notice under condition 54 of IAFW 2249 if MoU not submitted by L1 bidder within 5 week of acceptance. On occassion to this Performance Security @ 5% shall be forfeited by Department and work may be get executed under other means. Any Condonation of delay will be adjudicated by the Accepting Officer only. No extension will be granted on the part of OEM causing delay in signing the MoU with L1 bidder.
Supply and charging refrigerant R-22 Gas of approved make in new sealed cylinder complete all as specified and as directed.
Supply only AC remote suitable for 2.00 ton split AC complete all as specified and as directed.
Disconnecting and taking down old U/S compressor of capacity 2.0 TR from AC and S&F new compressor unit with charging of refrigerent after dehydration testing and vaccumming as per existing model and site requirement complete all as directed. Make: Voltas, Hitachi
M&L for detecting the cause of leakage in any type/capacity of 2.0 tonne AC and ensuring the complete system leak proof and charging of refrigerant gas with appropriate quantity as directed including testing for smooth functioning complete all as specified and as directed. Notes :- (i) Dismantling of unserviceable compressor and re-installation of serviceable compressor after repairing are deeemed to be included in the quoted rates .
M&L for rewinding of the blower motor 1/6,1/5,&1/8 HP of AC any type /capacity with same gauge super enamelled copper wire complete including taking out old unserviceable winding kit complete all as specified and as directed.
M&L for complete servicing of Split type AC capacity 2.0 ton , cleaning of Indoor / outdoor unit , cooling /condensing coil , reinsulation of refrigerant tubing , replacement of worn out spare parts of AC complete all as specified and as directed. Note: Worn out spare parts shall be measured and paid separately under respective items of the Schedule.
Supply & Fixing starting relay of existing makes and capacity duly ISI marked for split type 2.0 Ton capacity complete all as specified and as directed.
Supply & Fixing starting capacitor of existing make and capacity duly ISI marked for split type 2.0 Ton ( 100-120 Mfd) complete all as specified and as directed.
Ditto- but running capacitor 36-45 Mfd ISI marked for split type AC capacity 2.0 ton
M&L for refrigerant tubing 1/4" for suction /discharge including insulation tubing all as per site requirement and as directed by Engr-in-Charge.
All as per item No 14 but 1/2"
S&F PCB card suitable for existing split type AC 2 Tonne AC of any make/model -Voltas, Hitachi complete all as specified and as directed.
S&F in replacement hand shut valve suction for split 2 Tonne complete all as specified and as directed.
Ditto- but hand shut valve discharge for split AC 2 Tonne complete all as specified and as directed.
S&F in replacemnt of condensor coil complete pipe connection for outdoor unit of split AC 1.5/2.00 ton capacity complete all as per existing make and model complete all as specified and as directed at site by Engineer in charge.
S&F in replacement of cooling coil for split AC 2.0 TR capacity complete all as per existing make and model installed at site/ location complete all as specified and as directed at site by Engineer in charge.
M&L for shifting of split AC 2.00 TR includng dismantiling all accessories, indoor outdoor unit and copper insulation, voltage stabiliser and rienstalling the all acessories at new location as directed the coat of new copper pipe suction and discharge including insulation and electric cable 3 core , 4 Sqmm as per site requirement in included in the quoted rate complete all as specified and as directed at site by Engineer in charge.
S&F of cable PVC insulated unarmored for connection 4 Sqmm 3 core copper conductor duly drawn from indoor to outdoor and indoor unit to power point in PVC Flexible pipes complete all as specified and directed.
Taking down old u/s AC boxes and S&F new sheet metal enclosure with single pole and neutral enclousure with a two pin and earth plug and socket complete with single pole MCB 20-32 Amps complete all as specified and directed.
Net Contract Sum will be after deducting Sch of Credit of Rs 44,742.00
D P ENTERPRISES
national engineering
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .