Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PALAIYUR SIRUMALAI DINDIGUL 624003 | DINDIGUL | TAMIL NADU | 624003 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹9,000
Closing Date
8 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development Officer (VP) DGL
Block development Officer (VP) DGL
AGAMT II 2024-25 Siruamalai Panchayat Thenmalai Burial Ground
2024_RDTN_438046_1
3657-6/2023/A10 AGAMT II Sirumalai Burial Ground
Open Tender
Civil Works
Works
270 days
AGAMT II 2024-25 Siruamalai Panchayat Thenmalai Bu
AGAMT II 2024-25 Siruamalai Panchayat Thenmalai Burial Ground
4 documents required · 4 mandatory
₹0
₹9,000
Panchayat Union Office Dindigul
9 Mar 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
8 Mar 2024
4 Mar 2024
7 Mar 2024
Amount
Part 1 : Improvements to the Burial Ground with Waiting shed, Compound wall, CC Pavement and Water Supply at Thenmalai H/O Sirumalai Estimate Amount Rs.8.70 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm thick well rammed,watered and compacted including cost & conveyance of sand and all labour charges etc., complete as per std. Specifications.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifictions and as directed. Rate for 10cum.
Brick work in cm 1: 5 mix using country bricks of standard size including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and erection of centering for sides and soffits for all RCC works including cost and conveyance of all materials to site and all labour charges etc complete
Supplying fabricating and placing in position of steel rod including cost and conveyance of steel rod and binding wire and al labour charges for cutting bending and placing in positon of steel rod etc complete
RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifictions and as directed. Rate for 10cum.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Plastering in cm 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete.
Providing Granolithic pattern floor finish with c.c 1:2:4 mix using 20mm ISS metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Distembering two coats with best quality of distember and the colour approved by the departmental officers including cost & conveyance of all materials to site and all labour charges etc., complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat including through scrapping clean removal of dirt etc. complete and including necessary plaster of paris, putty wherever required.
Jally work using ready made ornamental RCC Jally including cost & vonveyance of all materials to site and all labour charges etc., complete
Construcion of Compound Wall
Earthwork excavationand Depositing on bank with initial lead of 10m and initial lift of 2m in Hard stiff clay, stiff black cotton,Hard red earth shales, Murram, Gravel, Stoney earth mixed with small size boulders As Per SS20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for Cover Slab with cost and conveyance of all materials and all labour charges etc., complete complying with stanadrd specification.
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat including through scrapping clean removal of dirt etc. complete and including necessary plaster of paris, putty wherever required.
Provision for Live Fencing Arrangement
Provision for CC Pavement
Earthwork excavation for foundation in all clauses of soils except hard rock requiring blating with initial lead and lift etc completed for as per SS20B.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum.
Supplying and erection of centering for sides and soffits for all RCC works including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metalincluding cost & conveyance of all materials to site and all labour charges etc., as directed by the departmental officers complete complying with std. Specifications .
Provision for EPL and Sintex tank
1000 lit HDPE Tank
Labour charges for Construction of HDPE Tank Pedestal arrangement including cost of masory materials and labour charges
63mm PVC pipe 4kg/sqm
63mm PVC Elbow
63 x 20 mm Saddle Piece
63mm PVC Tee
32mm dia PVC pipe
32mm dia PVC Coupler
32mm dia PVC Elbow
32mm dia PVC Tee
32mm PVC Gatevalve
25mm PVC Tap
50mm GM Gatevalve
Earthwork excavation hard stiff clay and hard rock earth and pipe laying joining and refilling the trench with excavation soils
a) For Water line
Name Board Painting and lettering the scheme details with approved colour and quality of paint on the exterior surface etc. complete and as directed by the departmental Officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
UMAIYAL CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .