| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹310.5 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹324.0 Cr+₹13.5 Cr (4.35%)Admitted-Finance PLOT NO B1 INFOCITY 122004 | REWARI | REWARI | HARYANA | 122004 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AYYAPPA INFRA PROJECTS PVT.LTD L1 | Subhash Infraengineers Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.01 | Rehabilitation and upgradation of existing 45 MGD STP at Kondli, Delhi based on Conventional Activated Sludge process to achieve treated effluent parameters BOD/TSS ≤ 10 ppm/10 ppm along with Operation & maintenance for Construction period, 2 year Defect Liability Period & 10 years thereafter (Note** The contractor is required to fill Column B as per his estimate. Column C shall be worked out by DJB which shall be proportionately reduced as described below-:
Total Quoted Cost (Capital + O&M) = K
Total Quoted price by bidder for Capital work as per Details at A1=L
Capital cost to be paid by DJB during Construction period (M) = 67.5 Cr
Multiplication factor for each item = M/L=67.5/L
Minimum 41.17% of K shall be O&M cost for 12 years (N) for which breakup is mentioned at Page 20,21.
K= L+N
Remaining Capital cost i.e. (L-67.5)/12 shall be paid as equal installments during 12 years O&M.)
** Price Schedule- A1, A2 and A3 will be submitted/uploaded along with financial bid separately after filling Item wise rate | 1 | Job | 1,82,50,00,000 ₹1,82,50,00,000 Lowest | 1,87,92,00,500 ₹1,87,92,00,500 |
| 1.02 | Cost of interim O&M | 12 | Months | 14,40,00,000 ₹14,40,00,000 | 10,20,00,000 ₹10,20,00,000 Lowest |
| 1.03 | Cost of O&M during trial run | 3 | Months | 3,60,00,000 ₹3,60,00,000 | 2,85,00,000 ₹2,85,00,000 Lowest |
| 1.04 | Cost of Comprehensive O&M during DLP period | 2 | Years | 17,00,00,000 ₹17,00,00,000 Lowest | 20,00,00,000 ₹20,00,00,000 |
| 1.05 | Cost of Comprehensive O&M for next 10 years | 10 | Years | 93,00,00,000 ₹93,00,00,000 Lowest | 1,03,05,00,000 ₹1,03,05,00,000 |
| 1.06 | Guarantee Energy Consumption for 45 MGD Sewage Treatment Plant at Kondli Ph-IV for Treatment Purpose. (Note : - Bidder is required to quote the Guaranteed Energy Consumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*12X(Power Unit Rate)( 365*12*8.0)
Note: This value shall only be consider for evaluation purpose and shall not be including in the awarded cost | 1 | KWH/MGD | 1,038.24 ₹1,038.24 Lowest | 1,176.25 ₹1,176.25 |
Tender Value
Refer Docs
EMD Value
₹2.2 Cr
Closing Date
25 Apr 2022, 3:15 pmClosed
EE
SEWAGE TREATMENT PLANT KONDLI
Rehabilitation and upgradation of existing 45 MGD STP at Kondli, Delhi based on Conventional Activated Sludge process to achieve treated effluent parameters BOD/TSS ppm/10 ppm along with 12 yrs Operation and maintenance
2022_DJB_217343_1
PRESS NIT No.22 EE(SDW)-IV 2021-22
Open Tender
Composite Works
Lump-sum
4770 days
SEWAGE TREATMENT PLANT KONDLI
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
DJBEMD A/c No-50448339804 THROUGH SUBPAISA GATEWAY
₹2.2 Cr
OFFICE OF CE SDW NW
29 Apr 2022
24 Feb 2022
25 Apr 2022
24 Feb 2022
25 Apr 2022
24 Feb 2022
24 Feb 2022 - 4 Apr 2022
4 Mar 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Rehabilitation and upgradation of existing 45 MGD STP at Kondli, Delhi based on Conventional Activated Sludge process to achieve treated effluent parameters BOD/TSS ≤ 10 ppm/10 ppm along with Operation & maintenance for Construction period, 2 year Defect Liability Period & 10 years thereafter (Note** The contractor is required to fill Column B as per his estimate. Column C shall be worked out by DJB which shall be proportionately reduced as described below-:
Total Quoted Cost (Capital + O&M) = K
Total Quoted price by bidder for Capital work as per Details at A1=L
Capital cost to be paid by DJB during Construction period (M) = 67.5 Cr
Multiplication factor for each item = M/L=67.5/L
Minimum 41.17% of K shall be O&M cost for 12 years (N) for which breakup is mentioned at Page 20,21.
K= L+N
Remaining Capital cost i.e. (L-67.5)/12 shall be paid as equal installments during 12 years O&M.)
** Price Schedule- A1, A2 and A3 will be submitted/uploaded along with financial bid separately after filling Item wise rate | 1 | Job | - | - |
| 1.02 | Cost of interim O&M | 12 | Months | - | - |
| 1.03 | Cost of O&M during trial run | 3 | Months | - | - |
| 1.04 | Cost of Comprehensive O&M during DLP period | 2 | Years | - | - |
| 1.05 | Cost of Comprehensive O&M for next 10 years | 10 | Years | - | - |
| 1.06 | Guarantee Energy Consumption for 45 MGD Sewage Treatment Plant at Kondli Ph-IV for Treatment Purpose. (Note : - Bidder is required to quote the Guaranteed Energy Consumption in kwh/MGD).The value shown is quantity is computed as :-(Flow (MGD) In the STP)X365*12X(Power Unit Rate)( 365*12*8.0)
Note: This value shall only be consider for evaluation purpose and shall not be including in the awarded cost | 1 | KWH/MGD | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_279630.xls
BOQ Document • 0.28 MB
93131316.pdf
Tender Document • 0.15 MB
Volume01.pdf
Tender Document • 12.38 MB
volume02.pdf
Tender Document • 4.39 MB
Volume03A.pdf
Tender Document • 29.75 MB
Volume03B.pdf
Tender Document • 31.42 MB
Volume04.pdf
Tender Document • 1.20 MB
93131322.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .