| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.6 LAccepted-AOC MYOREPUR ANPARA ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | L-1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹23.9 L+₹1.6 L (7.02%)Rejected-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹25.4 L+₹3.0 L (13.6%)Rejected-Finance | L3 | Rejected-Finance L3 BIDDER | |
| 4 | Rejected-Technical C 51 SUDERSHANPURA INDUSTRIAL AREA BAIS GODAM JAIPUR JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | - | Rejected-Technical Not qualified as PQC |
Tender Value
₹18.5 L
EMD Value
₹37,000
Closing Date
15 Jun 2020, 5:00 pmClosed
SE O and MC V
office of SE O and MC V ATPS Anpara
Maintenance of Lighting system Electrical hoist Cable laying and Maintenance of Suspended Magnets installed in CHP 3x210MW ATPS Anpara
2020_RVUNL_473273_1
07/CHD-II/ATPS/2020-21
Open Tender
Electrical Works
Fixed-rate
365 days
ATPS Anapara
Maintenance of Lighting system Electrical hoist Cable laying and Maintenance of Suspended Magnets installed in CHP 3x210MW ATPS Anpara
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO ATPS
₹37,000
Yes
17 Jul 2020
21 May 2020
17 Jun 2020
21 May 2020
15 Jun 2020
21 May 2020
21 May 2020 - 13 Jun 2020
Amount
Part-A
Routine maintenance and attending breakdown of lighting / welding system of coal handling plant of 3x210 MW units for proper lighting and welding supply including checking and minor maintenance of associated equipment.
Operation of hoist on clock wise.
Part-B RATE SCHEDULE (a) LIGHTING & WEILDING SOCKET
Installation and commissioning of 125A/ 100A/ 63A, 415V double break, heavy duty fuse witch unit 63A, 415 V, 3 phase welding socket and plug combined unit
Shifting/ new installation of 250W / 400 W, HPMV/ HPSV fittings.
Shifting / new installation of 80 W/ 125 W HPMV / HPSV light fittings
Repairing of damaged 70 W to 400 W HPMV / HPSV light fittings
RATE SCHEDULE (b) HOIST
Repositioning of entangled steel wire rope, replacement of steel wire rope
Attending fault in the control panel of overhead system including replacement of defective components.
Maintenance of hoist which includes replacement of motors, bearings, cleaning of panels, control circuit, cleaning of monorail & other accessories.
Doing steel wire rope of single/double drum hoists in single rope by removing hook pulley for positioning of conveyor belt and for other works.
Repositioning of steel wire rope with hook pulley in single/double drum hoist after positioning of conveyor belt and other works.
Bringing down the hoist unit from mono-rail of the respective floor for attending the breakdown , complete overhauling and repositioning
Bringing down the hoist unit from mono-rail of the respective floor for attending the breakdown , complete overhauling and repositioning
Shifting of hook pulley from hoist to another / replacement by new hook pulley.
Railing/Travelling hoist Motor Breakdown maintenance(along with Motor alignment)
RATE SCHEDULE (c)ELECTRICAL WIRING & POWER CABLE
Providing & Installation of 7” x 4” sun mica top wooden board
Providing & Installation of 15A, 240V Anchor make switch socket combined unit with sun mica top wooden board.
Providing & Installation of 15A, 240V Anchor make fuse type switch with sun mica top wooden board.
Providing & Installation of 15A, 240V flush type anchor/ standard quality make switch with three pin socket with sun mica top wooden board.
Installation of Junction box off size
CABLE LAYING / SALVAGING upto 10mm2
CABLE LAYING / SALVAGING Power XLPE Aluminum Cable Above 10 mm2 upto 50 mm2
CABLE LAYING / SALVAGING Power XLPE Aluminum Cable Above 50 mm2 upto 240 mm2
CABLE LAYING / SALVAGING of Power XLPE Aluminum Cable Above 240 mm2 upto 300 mm2
TERMINATION & CABLE GLANDING upto 10mm2
TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable above 10 mm2 upto 50 mm2
TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable Above 50 mm2 upto 240 mm2
TERMINATION & CABLE GLANDING of Power XLPE Aluminum Cable Above 240 mm2 upto 300 mm2
STRAIGHT THROUGH JOINT OF CABLE upto 10 mm2
STRAIGHT THROUGH JOINT OF CABLE above 50 mm2 to 240 mm2
STRAIGHT THROUGH JOINT OF CABLE 240 mm2 to 300 mm2
RATE SCHEDULE (d) SUSPENDED MAGNET
Attending the fault in the control panel of Oil cooled Suspended Magnets and motors of traveling trolley including replacement of defective components.
Maintenance of Suspended Magnets which include cleaning of control panel, Transformers, Complete cleaning of S/M, Monorail, Checking and maintaining of oil level, maintenance of silica Jel etc.
Maintenance of motorized trolley, Chain pully which includes replacement of motors, bearings and other associated works
Centrifuging of oil of Suspended magnets
RATE SCHEDULE (e) PF , TT & LDBs.
Maintenance/ overhauling of PF & TT slip ring assembly,electrical control pannel and other associated work.
Fortnightly checking of electrical control pannel of PF&TT, slip ring assembly , multi core flexible cable of slip ring assembly,DE/DS system and other control cable of pannel.
Repairing of LDBs./Junction box locating at different places of CHP including fixing of doors,weilding of hinges of doors, repairing/replacement of door lock system,replacement of aluminium/copper burnt bus bar,re lugging and termination of cable
M/S SHYAM ERECTORS
M/S DURGA ELECTRIC
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .