Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
1 Sept 2026, 11:00 am
General Manager (E)
417, Pantheon road, Egmore, Chennai - 600 008
ONLINE TENDER FOR FIXING RATES FOR REAGENTS WITH PROVISION OF FULLY AUTOMATED INTEGRATED CHEMISTRY ANALYZER UNDER REAGENT RENTAL MODE AND FIXING RATE CONTRACT FOR SUPPLY AND INSTALLATION OF FULLY AUTOMATED INDEPENDENT INTEGRATED CHEMSITRY ANALYZER
2026_TNMSC_651248_2
E1466/ANL/RC/TNMSC/ENGG/2026
Open Tender
Medical Equipments/Waste
Supply
60 days
Egmore
Please refer Tender documents.
18 documents required · 18 mandatory
₹0
₹1.3 L
Yes
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
1 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Fixing rates for reagents with provision of Fully Automated Integrated Chemistry Analyzer
Note :
1. The bidder should give the break up rate for period of 5 years in the reference sheet 1.
2. The total rate calculated for the period of 5 years without GST in the column 'M' row no. 34 of the reference sheet 1 will be automatically indicated in the Column M of this row
3.The total rate calculated for the period of 5 years with GST in the Column 'N' row no. 34 of the reference sheet 1 should be indicated in the Column AB of this row | 1 | Nos | - | - |
| 1.02 | Fully Automated Independent Integrated Chemistry Analyzer and Immunoassay with Comprehensive Lab infor System (LIS) software for clinical chemistry Lab as per specification
Note :
1. The bidder should give the break up rate for period of 5 years in the reference sheet 2.
2. The total rate calculated for equipment and reagents for the period of 5 years without GST in the column 'M' row no. 93 of the reference sheet 2 will be automatically indicated in the Column M of this row
3.The total rate calculated for the period of 5 years with GST in the Column 'N' row no. 93 of the reference sheet 2 should be indicated in the Column AB of this row | 1 | Nos | - | - |
| 1.03 | Dry Chemistry based Integrated System as per specification
Note :
1. The bidder should give the break up rate for period of 5 years in the reference sheet 2.
2. The total rate calculated for equipment and reagents for the period of 5 years without GST in the column 'M' row no. 148 of the reference sheet 3 will be automatically indicated in the Column M of this row
3.The total rate calculated for the period of 5 years with GST in the Column 'N' row no. 148 of the reference sheet 3 should be indicated in the Column AB of this row | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.97 MB
E1466_R.pdf
Tender Documents • 1.68 MB
BOQ_837017.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].