Tender Value
₹20.8 Cr
EMD Value
₹41.5 L
Closing Date
20 May 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
GATI SHAKT
15 conditions · 4 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (a)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b)(1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b)(3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:
The subcontractor shall have successfully completed at leastone work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work Experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing.
Similar Nature of work- "Any civil engineering work involving construction of major bridges/ minor brridges/ jacketing of bridges/rebuilding old bridges / replacement of bridges by PSC slabs of major/ minor bridges/ bridge work using box pushing technique. Cost component of bridge work in completion certificate shall be at least 35% of tendered value of the proposed work." (As per HQ office letter No.W.187.R.A.SNW date 13.12.2018).
6 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The contractor shall ensure that the average annual contractual turnover (Total Contractual payments) shall be calculated and submitted as per the audited balance sheet in the previous three financial years. In case balance sheet of the previous year is not yet prepared/audited, and for the fourth previous year's audited balance sheet considered for calculating average annual contractual turnover, the contractor shall submit a declaration along with their offer that "The previous year balance sheet is yet to be prepared/audited".
1) During execution of work, agency shall ensure pumping of water if required in LHS area until commissioning of subway, including completion of drainage work. No extra payment shall be made on this account. 2) After completion of box pushing work, wing walls on all 4 sides shall be constructed to the satisfaction of Engineer-In- Charge within one month from the date of completion of box pushing. In case of delay, a penalty for Rs.25,000/- per day shall be imposed. 3) The list of pedestrian subway locations is tentative & may vary at the time of execution of work with the approval of competent authority.
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published.
Please refer Tender Documents for detail Nature and Scope of work and Additional Special Condition of contract.
Please refer Tender Documents of Annexure VI, VI-A & VI-B
Provision of Subway by Prov RCC box (07 Nos) in connection with Provision of Safety Fencing along the Track for Itarsi-Ballarshah and Wardha-Badnera routes under GQ-GD in Nagpur division under Sr.DEN(North)NGP jurisdiction.(Km 750/0- 964/0(Narkher-Itarsi section).
ENGG-GSU-2026-03
ENGG-GSU-2026-03
Open
Works - General
12 Months
Nagpur, Maharashtra
₹0
₹41.5 L
20 May 2026
27 Apr 2026
6 May 2026
43 items across 3 schedules · ₹18,21,13,408.7 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | cum | — | 2860.00 | 5,853.05 | 1,67,39,723 |
| 2 | MT | — | 1145.00 | 121.58 | 1,39,209.1 |
| 3 | MT | — | 1145.00 | 151.88 | 1,73,902.6 |
| 4 | MT | — | 1145.00 | 179.02 | 2,04,977.9 |
| 5 | MT | — | 1145.00 | 203.97 | 2,33,545.65 |
| 6 | MT | — | 1145.00 | 227.31 | 2,60,269.95 |
| 7 | MT | — | 1145.00 | 249.46 | 2,85,631.7 |
| 8 | MT | — | 1145.00 | 270.68 | 3,09,928.6 |
| 9 | MT | — | 1145.00 | 291.17 | 3,33,389.65 |
| 10 | MT | — | 1145.00 | 338.19 | 3,87,227.55 |
| 11 | MT | — | 1145.00 | 412.23 | 4,72,003.35 |
| 12 | MT | — | 1145.00 | 484.68 | 5,54,958.6 |
| 13 | MT | — | 1145.00 | 631.66 | 7,23,250.7 |
| 14 | MT | — | 1145.00 | 843.81 | 9,66,162.45 |
| 15 | MT-Km | — | 22885.00 | 4.41 | 1,00,922.85 |
| Schedule total | ₹2,18,85,103.65 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDER DOCUMENT
ATTACHMENT
ENGG-GSU-2026-03Prov.ofsubwayDENNORTH..pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .