| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC ADMITTED | |
| 2 | L2₹11.5 L+₹2,291.37 (0.20%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
Tender Value
₹11.6 L
EMD Value
₹12,000
Closing Date
20 Dec 2022, 3:00 pmClosed
The Block Development Officer VP
BDO Office Veppanapalli
Krishnagiri Dt Veppanapalli Block Desilting of 2 Kuttais at Seelapalli Village Kodipalli Panchayat Package No VPN-AGAMT-09
2022_RDTN_267369_1
ROC_1706_22_E1_DATE_11_11_22
Open Tender
Civil Works - Others
Item Rate
180 days
Veppanapalli
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
BDO Office Veppanapalli
3 Feb 2023
24 Nov 2022
20 Dec 2022
24 Nov 2022
20 Dec 2022
24 Nov 2022
14 Dec 2022
Amount
1.Desilitng of Kasivu Kuttai and Strenthing of bund, Repair of surplus weir at Seelapalli Village H/O Kodipalli - Rs.5.447/- Lakhs
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Eathwork in all except hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete.
Formation of Fore shore bund by dumping the excess earth excavated soil after bund strengthening etc., complete.
Eathwork in all except hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete.
Provision for Constrcution of Weir
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and erection of centering for sides and soffits including all labour charge
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Plastering with cement mortar 1:4 mix to 20mm thick includingcost and conveyance of all materials to site and all labour charges etc
Provision for Revetment
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and erection of centering for sides and soffits including all labour charge
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
5. Rough stone dry packing for aprons and revetments , including all cost and conveyance of men and materials etc., all complete
Provision for Boundary Stones
Provision for Name Board Charegs
2.Desilitng of Kattu Kuttai (Pudhu Kuttai) and Strenthing of bund, New surplus weir at Seelapalli Village H/O Kodipalli - Rs.6.20/- Lakhs
Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Eathwork in all except hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete.
Eathwork in all except hard rock requirng blasting and conveying earth by deploying earth moving mechinaries and tippers for formation of bund in layer of suitable thickness for formation of bund in layer of suitable thickness bencing of slopes to palacement old earth filling breaking clods watering to OMC and compaction of each layer to 95% proctor density using power/vibrator roller etc complete.
Provision for Constrcution of Weir
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and erection of centering for sides and soffits including all labour charge
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Provision for Revetment
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and erection of centering for sides and soffits including all labour charge
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
5. Rough stone dry packing for aprons and revetments , including all cost and conveyance of men and materials etc., all complete
Provision for Boundary Stones
Provision for Name Board Charegs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MUNIYA GOUNDER MUNIRATHINAM
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .