Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC BAIS CONSTRUCTION L1 |
| 2 | L2₹4.0 Cr+₹27.9 L (7.49%)Rejected-Finance ALAMPUR DISTRICT BHIND M P | ₹4.0 Cr+₹27.9 L (7.49%) | L2 | Rejected-Finance L2 |
Tender Value
₹4.2 Cr
EMD Value
₹4.2 L
Closing Date
26 Nov 2019, 5:30 pmClosed
Chief Engineer
Chief Engineer Rani Avanti Bai Lodhi Sagar Project Bargi Hills, Jabalpur (M.P.)
Construction of High Level Bridges on Halon river near Gadi on Gadi Motinala road and Kashmiri Nala near Gadi on Sijhora Gadi road on Turn Key basis including construction of approach roads. This includes work of urvey,necessary investigation,
2019_NVDA_61405_1
37 /CE/2019-20
Open Tender
Civil Works - Bridges
Turn-key
365 days
Jabalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Payable To
₹4.2 L
18 Mar 2020
4 Nov 2019
2 Dec 2019
4 Nov 2019
26 Nov 2019
4 Nov 2019
Amount
Construction of High Level Bridges on Halon river near Gadi on Gadi Motinala road and Kashmiri Nala near Gadi on Sijhora Gadi road on Turn Key basis including construction of approach roads. This includes work of survey, necessary investigation, Design, Drawing, estimation, obtaining necessary permission from competent authority, construction of necessary diversion arrangement, excavation of foundation including dewatering, construction of sub structures, superstructures including all arrangement of centering, shuttering, Shifting of LT/HT electric lines, telephone lines, water supply lines and any other facility in way of works and all other miscellaneous related work complete as directed by Engineer in Charge.
Construction of High Level Bridges on Halon river near Gadi on Gadi Motinala road and Kashmiri Nala near Gadi on Sijhora Gadi road on Turn Key basis including construction of approach roads. This includes work of survey, necessary investigation, Design, Drawing, estimation, obtaining necessary permission from competent authority, construction of necessary diversion arrangement, excavation of foundation including dewatering, construction of sub structures, superstructures including all arrangement of centering, shuttering, Shifting of LT/HT electric lines, telephone lines, water supply lines and any other facility in way of works and all other miscellaneous related work complete as directed by Engineer in Charge.
SHARDA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .