Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
20 Aug 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
PROJECT
3 conditions · 2 needing a document upload
The tenderer should have minimum cumulative turnover from operation in the previous three financial years and the current financial year, at least 150% of the advertised value of the tender. The tenderers shall submit Certificates to this effect which may be an attested Certificate from the concerned department / client or Audited Balance Sheet duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. The contact details of CA/Statutory Auditor along with UDIN No. shall be mandatorily mentioned on copy of certified Balance Sheet/Certificate.
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: i.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender or ii.Two similar works each costing not less than the amount equal to 40% of advertised value of the tender or iii.One similar work each costing not less than the amount equal to 60% of advertised value of the tender
Defination of Similar Work :- Trenching, laying, jointing, splicing, termination, testing and Commissioning of optical fiber cable. OR OFC maintenance works OR Any type of Railway Signaling works etc
7 conditions · 2 needing a document upload
As per the tender document.
As per tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Supply, Installation, Trenching/HDD/Clamping, Laying of Duct, Blowing of OFC through Ducts, Splicing,Testing & Commissioning of OFC laying from Mohanlalganj to AFS Mamura
NR-P-OF-AFSMamura-26-27-3
NR-P-OF-AFSMamura-26-27-3
Open
Works - General
270 Days
Unknown (Unspecified Location)
₹0
₹4.6 L
20 Aug 2026
28 Jul 2026
6 Aug 2026
42 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,82,84,488.06 | ||
| — | 4000.00 | — | — | ||
| Trenching to a depth of 1.2 mtr and appropriate width for pipe/duct/cable and backfilling after laying OFC as per Section-II,Chapter 4-Clause-4.1 to 4.14 (Normal Soil). | — | — | — | 3,77,680 | |
| — | 27000.00 | — | — | ||
| Horizontal Drilling at a approximately depth of 1.65/1.2 m below the formation level of the earth including insertion of DWC/HDPE pipes along with couplings etc. | — | — | — | 1,61,01,990 | |
| — | 34100.00 | — | — | ||
| Laying of OFC/Quad Cable in trench and through HDPE/GI/RCC pipes where ever necessary as per Section-II,Chapter-4,Clause-4.18.1 | — | — | — | 4,65,806 | |
| — | 20000.00 | — | — | ||
| Laying of OH OFC temporarily | — | — | — | 4,72,000 | |
| — | 22.00 | — | — | ||
| Supply, transportation & installation of jointing pit as per drawing with cover and required trenching to ease out cable/duct. (The joint chamber should be of the size of outer dia 1100 mm, Height -600 mm (2 pieces of 300 mm each). The thickness of the wall should be 50 mm and each piece of the chamber should havesuitable groves to fit each other).As per drawing Section- III,DRG.No-RCIL/N.Region/03/2004. | — | — | — | 1,15,664.78 | |
| — | 15.00 | — | — | ||
| Supply & installation of optical fibre splicing(Joint)Enclosure(24 F)for loose tube complete wilt all accessories as per TEC specifications no.TEC/GR/OJC-02/02 Sept 2003 or latest with the following additonal features.As per Section-II,Chapter -5,Clause 5.1 to 5.22 | — | — | — | 1,85,903.1 | |
| — | 1.00 | — | — | ||
| Supply and Installtion of Rack Mounted Fiber Management system 19 " with all installtion material, Splicing, Termination and testing of 2X24(RCIL) fiber of cable with all connectors material as per instruction of site Engineers.(SC/APC type, make of TVSE/Raychem/ R&M/3M/Commscope only) | — | — | — | 29,476.95 | |
| Supply and fixing of cable route markers as per Section-II Chapter-4,clause 4.15,drawing (Drg No.RCIL/N Region/1/2004). | — | 310.00 | — | — | |
| — | 4400.00 | — | — | ||
| — | 22.00 | — | — | ||
| — | 21.00 | — | — | ||
| — | 6.00 | — | — | ||
| Concreting for protection of OFC cable as per Section-II, Chapter-4,clause-4.18.2. | — | — | — | 31,990.8 | |
| — | 10.00 | — | — | ||
| Transportation of Optic Fiber cable andHDPE Duct RailTelStore/Warehouse to the site and unused material from site to RailTel | — | — | — | 1,43,637.6 | |
| — | — | — | from | ||
| — | — | — | the | ||
| — | 10.00 | — | — | ||
| Supply transportation, and laying of Double (DWC)- Pipe/duct in the cable trench. | — | — | — | 1,659.5 | |
| — | 2.00 | Lumpsum | — | ||
| Final testing & commissioning(hopwise as well as end to end ) as perinstruction of officers incharge of site with one set of soft copy of test report and as built route plan in A3 size | — | — | — | 59,045.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TD_AFS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .