Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC HATIPOTA ALIPURDUAR 736201 | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736201 | ₹6.9 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹7.5 L+₹62,471.28 (9.07%)Rejected-AOC | ₹7.5 L+₹62,471.28 (9.07%) | L2 | Rejected-AOC L2 BIDDER |
| 3 | L3₹7.6 L+₹74,011.78 (10.7%)Rejected-AOC | ₹7.6 L+₹74,011.78 (10.7%) | L3 | Rejected-AOC L3 BIDDER |
| 4 | L4₹7.6 L+₹74,107.16 (10.8%)Rejected-AOC GAZOLE MALDA | GAZOLE | MALDA | WEST BENGAL | ₹7.6 L+₹74,107.16 (10.8%) | L4 | Rejected-AOC L4 BIDDER |
| 5 | L5₹8.7 L+₹1.8 L (26.8%)Rejected-AOC | ₹8.7 L+₹1.8 L (26.8%) | L5 | Rejected-AOC L5 BIDDER |
Tender Value
₹9.5 L
EMD Value
₹19,075
Closing Date
30 Jun 2026, 5:30 pmClosed
DEPUTY FIELD DIRECTOR
BUXA TIGER RESERVE EAST DIVISION
Maint Forest Rd from JNT to 23rd PJ and JNT to 23rd Sanghai and Bhutiabasti to Chunia WT and Buxaroad to 28th Dima Tower
2026_DOFR_1029044_1
WBFOR/BTRE/eNIT-01/SDS of 2026-27
Open Tender
CIVIL WORKS
Percentage
Jainti and Buxaduar Range
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,075
2 Sept 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MAINTENANCE OF 19 km forest road for Tiger Re-introduction programme UNDER BUXA TIGER RESERVE (EAST) DIVISION A. JNT to 23rd Mile PJ Towe- 7 km B. From JNT to 23rd Sanghai Tower- 7 km C. Bhutiabasti to Chunia WT- 3 km D. Buxaroad beat to 28th Mile Dima-2 km | |||||
| 1.01 | Construction of Sub Base using location materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, making by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guerding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT& H (5th Revision).
For Construction of Sub Base by compacting river bed materials
20% for Rectification | - | cum | 926.72 | - |
| 1.02 | Adding 18% GST | - | LS | 1,42,622 | - |
| 1.03 | Adding 1% Labour Cess | - | LS | 9,349 | - |
| 1.04 | Adding 3% contingency | - | LS | 9,443 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 0.71 MB
BOQ_2527359.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .