Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance AT OLD B D O OFFICE MAIN ROAD PHUSRO DIST BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | Admitted-Finance |
| 2 | Admitted-Finance 71 BALU BANKER COLONY DHORI BOKARO BOKARO JHARKHAND 825102 | BOKARO | JHARKHAND | 825102 | Admitted-Finance |
| 3 | Admitted-Finance MAIN ROAD PHUSRO DIST BOKARO | PHUSRO | BOKARO | JHARKHAND | Admitted-Finance |
| 4 | Rejected-Technical INDUSTRIAL PLOT NO 11 TUPUDANA AIA TUPUDANA TUPUDANA RANCHI JHARKHAND 834003 | RANCHI | JHARKHAND | 834003 | Rejected-Technical techno commercially not accepted |
Tender Value
₹18.6 L
EMD Value
₹23,200
Closing Date
2 Jan 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EnM), Dhori
Office of the General Manager, Dhori, Po- Dhori, Bokaro, pin-825102
Repair of 04 nos. Induction motor (1) Mechanical repairing of 370KW, 3.3KV, 1490RPM, Marathon make (2) 215KW, 3.3KV, 1485RPM, Marathon make(3)225KW, 3.3KV, 1490RPM, Marathon make(4) 250KW, 3.3KV, 1490RPM, GEC make induction motor attached with 1000GP
2024_CCL_323919_4
GM(D)/SO(EnM)/DA/24-25/54
Open Tender
Electrical and Maintenance Works
Item Wise
25 days
AADOCM
please refer tender documents
2 documents required · 2 mandatory
₹23,200
4 Feb 2025
21 Dec 2024
3 Jan 2025
23 Dec 2024
2 Jan 2025
23 Dec 2024
23 Dec 2024 - 28 Dec 2024
Amount
Part – A (mechanical repairing of 370kw, 3.3kv, 1490 rpm, marathon make induction motor)
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size Both side shafd.
Repairing and setting of Both side terminal box and new making of its cover by iron sheet.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
cost of coil molding charge.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
End cover housing repairing by Cl electrode welding and machining as per bearing size.
Cost of super enamel copper wire
Cost of insulation material
labour cost
Less reussed value (60% of sl.no 1.1)
Part – B (mechanical repairing of 215 kw ,3.3kv, 1485 rpm , Marathon make induction motor)
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size Both side shafd.
Repairing and setting of Both side terminal box and new making of its cover by iron sheet.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
End cover housing repairing by Cl electrode welding and machining as per bearing size.
cost of coil molding charge.
Cost of super enamel copper wire
Cost of insulation material
labour cost
Less reussed value (60% of sl.no 1.24)
Part –C (mechanical repairing of 225kw, 3.3kv,1490 rpm, marathon make inducftion motor)
End cover housing repairing by Cl electrode welding and machining as per bearing size.
M.S sheet cooling fan cover new making & fabrication as per sample and size by M.S Sheet cutting, required bending, framing all joints full welding, side covering cooling net making, fixing welding, hole center making for tightening.
Rotor shaft bearing housing repairing by electrode welding on bearing fitting place or sleeve making as per bearing size Both side shafd.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
cost of coil molding charge.
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
Cost of super enamel copper wire
Cost of insulation material
labour cost
Less reussed value (60% of sl.no 1.38)
Part – D( mechanical repairing of 250kw,3.3kv,1490 rpm, GEC make induction motor)
cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material.
Rotor and rotor shaft alignment checking on lathe machine and rectification & its alignment setting by cut machining and polishing by stone file & complete balance checking
Old and damage both side bearing housing opening by puller and gas heating /cutting after opening of bearing new bearing fitting /setting
Repairing and setting of Both side terminal box and new making of its cover by iron sheet.
Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor.
After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots.
Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge.
Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc.
cost of coil molding charge.
Cost of super enamel copper wire
Cost of insulation material
labour cost
Less reussed value (60% sl.no. of 1.53)
Supervision , incidental & overhead expenses
Total impact of GST for the purpose of CTC
M/S NATIONAL ELECTRICAL WORKS (BID ID -1113743)
M/S SHREE TIRUPATI TRADERS (BID ID -1113568)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .