Tender Value
₹37.8 L
EMD Value
₹75,700
Closing Date
16 Feb 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
Above/Below/Par
GENERAL
34 conditions · 6 needing a document upload
Mandate form should be uploaded as per attached format in document tab.
GST : Tenderer has to fulfill GST Compliance as per Govt. norms
Tenderer may upload GST registration number and certificate
Tenderers will examine the various provisions of the CentralGoodsandServices Tax Act 2017(CGST) Integrated Goods and Service Tax Act. 2017 (UGST)/respective states Goods and Services Tax Act(SGST)also, as notified by/central/Sate Govt& as amended from time to time and applicable taxes before bidding Tenderer swill ensure that full benefit of Input Tax Credit(ITC)likely to be availed by them is duly considered while quoting rates
PAN Card: Tenderers are required to upload their Permanent Account Number (PAN) card
Contact details of tenderer: The Contractor shall submit their complete official address, e-mail address, telephone no., mobile no. and fax no. so that necessary communication can be made by the Railways as and when required
Employment/Partnership etc. of Retired Railway Employees: Detailed vide para 16 of Annexure-I of GCC 2022
Employment/Partnership etc. of Retired Railway Employees: (a) Should a tenderer i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender THEN the tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender. b) In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer . c) Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of partners(s)/shareholder(s) or member(s) of the family of partner(s)/ shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. If information as required as per 16.a), b), c) above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of contract. Format for declaration in this regard is attached with the tender document.
Mention status of firm: Individual Firm / Proprietorship Firm / Partnership Firm /Private Ltd. Firm / Public Ltd. Firm OR Government Undertaking.
Performance Guarantee: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work. (b) The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value:- (i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii) Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x) National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days. (d) The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value. (e) The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. (f) Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed. (g) The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i) Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii) Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii) The Contract being determined or rescinded under clause 62 of these conditions.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Refund of Security Deposit: Security Deposit mentioned in sub clause (1) above shall be returned to the Contractor along with or after, the following: (a) Final Payment of the Contract as per clause 51.(1) and (b) Execution of Final Supplementary Agreement or Certification by Engineer that Railway has No Claim on Contractor and (c) Maintenance Certificate issued, on expiry of the maintenance period as per clause 50.(1), in case applicable. 16. (2) (ii) Forfeiture of Security Deposit: Whenever the contract is rescinded as a whole under clause 62 (1) of these conditions, the Security Deposit already with railways under the contract shall b e forfeited. However, in case the contract is rescinded in part or parts under clause 62 (1) of these conditions, the Security Deposit shall not be forfeited. 16.(3) No interest shall be payable upon the Bid Security and Security Deposit or amounts payable to the Contractor under the Contract, but Government Securities deposited in terms of SubClause 16.(4) (b) of this clause will be payable with interest accrued thereon
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Shramikkalyan portal:- (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54,55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment inthis portal. These details shallbe available in public domain. The registration /updation in Portal shall be done as under: (a)Contractor shall apply for one time registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LoAs)issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoAs)/ Contract Agreements on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d)After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating ofeach wage payment to them on shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii)While processing payment of any'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till____Month,____Year
Guarantee/Warrantee: The installation will be handed over to the Department after necessary testing and commissioning. The installation will be guaranteed against any defective design/ workman-ship. Similarly, the materials supplied by the contractor will be guaranteed against any manufacturing defect, inferior quality. The complete luminaire/LED bulb shall have replacement guarantee for satisfactory performance and manufacturing defects for a period of 60 months from the date of commissioning or 72 months from the date of supply whichever is earlier. For switch gear components and panels, warrantee should be 1year after date of installation , For all other items, the warrantee period will be for a period of 12 months from the date of handing over to the Department. Installation/ equipment or components thereof shall be rectified/repaired to the satisfaction of the Engineer-in-charge
Please read all the documents before submission of Tender.
Any other reputed make/ brand other than as mentioned in the explanatory note may be included during the execution of the works on an urgent basis/as per direction when needed with approval of competent authority.
Electrical Work for Connectivity of WCD Line with Hospital siding Line No 2, 5 & 6 at SRC Yard.
ELECT-CHG-25-26-HSDNG-38
ELECT-CHG-25-26-HSDNG-38
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹75,700
16 Feb 2026
22 Jan 2026
2 Feb 2026
113 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 26,86,044.88 | ||
| — | 30.00 | — | — | ||
| Supply of 4M HDG(Hot Dip Galvanized) Octagonal Pole with single arm brackets and 01 quantity LED street light 45watt, IP67 and IK 07 with isi mark, top dia 70mm,bottom dia 130mm,sheet thickness 3mm,base plate dimensions(L X B X T)-200x200x12mmwith foundation bolts and single arm 1000mm long special brackets. The door opening of the pole should be reinforced, water proofed & with locking arrangement & arrangement of in build junction box with DP MCBs 16 A-1 No , to be placed on a din channel of Pole and supply and fixing of Terminal connector, connection of terminals with lugs, earthing at the suitable location of the pole. LED light should be as per HQ spec. | — | — | — | 2,63,024.1 | |
| — | 30.00 | — | — | ||
| Erection, Fixing and Commisioning of 4M HDG(Hot Dip Galvanized) Octagonal Pole ,top dia 70mm,bottom dia 130mm,sheet thickness 3mm,base plate dimensions(L X B X T)- 200mmX200mm X12mm or higher with foundation bolts and single/double arm, 1000mm long special brackets, junction box and with concretting the foundation / plith including sand, ballast, cement & metalic tuisted rod etc.of size 750mmx750mm at bottom and 500mmX500mm at top or as per site rquirement with height 1500mm in the ratio 1:3:6 ( the rate shall be inclusive of all materials ) with necessary cable arrangement for lighting fixture with single arm brackets and fitting of Light with pole including transportation of pole to site location. | — | — | — | 1,26,293.7 | |
| — | 4.00 | — | — | ||
| "Supply of Earthing arrangement with supply of Hot Dip Galvanized (HDG) earth cone and all other requisite materials as per CEE/GRC's Drg. No.CEE/G/A3/P-150, Alt.1 including sump box with salt and charcoal, metalic cover etc. as per site supervisor's instruction. Cost includes supply of all materials mentioned in the Drawing including 02 mtrs 25x5mm GI strip for connection from earth electrod pipe to light pole /Rail pole etc. Make: Any IS standard Indian make. | — | — | — | 14,700.52 | |
| — | 4.00 | — | — | ||
| Erection of Earthing arrangement with erection of Hot Dip Galvanized (HDG) earth cone and all other requisite materials as per CEE/GRC's Drg. No.CEE/G/A3/P-150, Alt.1 including sump box with salt and charcoal, metalic cover etc. as per site supervisor's instruction. Cost includes erection of all materials mentioned in the Drawing including 02 mtrs 25x5mm GI strip for connection from earth electrode pipe to light pole /Rail pole etc. | — | — | — | 3,526.12 | |
| — | 100.00 | — | — | ||
| Laying of cable / cables across the road, track, drain etc through RCC/GI pipe confirming to IS standard of size 100mm or 150mm (or any suitable size as per field requirement based on the actual size of the cable) as per relevant specification and as per standard drawing with necessary termination, connections and testing .Cost also includes collection of cable/cables from Railway store if required.GI pipe will be supplied by contractor. | — | — | — | 26,441 | |
| — | 100.00 | — | — | ||
| Laying of cable/ cables on wall / structure through PVC casing pipe of size 4inches or 3inches with accessories or as per site requirement with suitable clamp / saddle/ fixtures etc with necessary termination, connection and testing as per standard drawing.Cost also includes collection of cable/cables from Railway store if required. | — | — | — | 5,345 | |
| — | 300.00 | — | — | ||
| Laying of cable / cables in under ground along the road through cable trench etc . as per standard drawing including necessary termination , connection and testing.Trenching and laying of U/G cables in any kind of soil trench of size minimum 0.40 mtr wide and 1 mtr deep covered with necessary bricks for protection of the cables including filling of space between brick and cable/cables with sand and refilling the trench with excavated soil, leveling up, and restoring the surface duly rammed. | — | — | — | 33,441 | |
| — | 1400.00 | — | — | ||
| Supply of Cable ducting system 2 m each,press fit, Size (in mm) / Approximate Cross section of the cable trunking and ducting system (in Sq.mm) as per Table 2 of IS:14927 (Part 1):2001 100x50/4473, conforming to IS 14927 Part 1:2001 and part 2:2001 latest | — | — | — | 7,11,858 | |
| — | 1400.00 | — | — | ||
| Erection and commissioning of Cable duct with masaory works by Excavating trenches of required width for pipes, cables, etc,exceeding 80 mm dia but not exceeding 300 mm dia in platform/ concrete places as and where required. | — | — | — | 35,588 | |
| — | 280.00 | — | — | ||
| Laying, Supply at site, testing, drawl & commissioning of HT cable. The price shall cover all requisite materials, digging of cable trench in any kind of soil, supply and spreadings and for cable commissioning, supply and laying of bricks (Class- A) along the road as per site requirement & CEE/GRC's drg. No. CEE/G/A-3/P-134.Price shall also cover for filling up the trench with soil after completion of work including cable marker for proper tracing of cable.Cost also includes collection of cable/cables from Railway store and supply of PVC sleeve/Pipe (or any suitable size as per field requirement based on the actual size of the cable) | — | — | — | 46,205.6 | |
| — | 20.00 | — | — | ||
| Laying,Supply at site,testing,drawl & commissioning of HT cable.The price shall cover all requisite for fixing of cables in wall/pole with necessary clamping not more than 50cm apart. For fixing cables on wall, PVC sleeve/Pipe should be used as per site requirement & CEE/GRC's drg. No. CEE/G/A-3/P-134 including cable marker for proper tracing of cable.Cost also includes collection of cable/cables from Railway store. | — | — | — | 1,085.6 | |
| — | 2.00 | — | — | ||
| Supply and Testing of OEM TTA Distribution panel, consisting of Incoming- MCCB 4P 250 A Qty -01, Outgoing -i) MCCB 4P 100 A Qty -02, ii) MCCB 4P 63 A Qty - 01, iii) MCB 2P 40 A Qty - 04, iv) MCB 2P 32 A Qty- 02 with suitable TPN 250 A copper busbar, indication lights, suitable spreder link, contactor with all modern facilites required for scada, volt meter, amp meter energy meter time switches etc. Panel should be as per IEC 61439 or latest. | — | — | — | 4,66,000 | |
| — | 2.00 | — | — | ||
| Erection, Installation and commissioning of TTA make Distribution panel . including civil job. | — | — | — | 69,027.4 | |
| — | 2.00 | — | — | ||
| Supply of Timer Panel for Street LightCircuit Floor/Panel/Tower/Wallmounted consisting of 3 Phase, MaxLoad: 6-18KW, auto/manual switch,Digital Timer(Astronomical/24 HourTimer), Contactor Rating (A): 65A TP(with 2 NO and 2 NC) or suitable, MCBRating: 63A TPN as incoming, 16/20ASP 10kA MCB-03 Nos as outgoing withpad lock. | — | — | — | 27,485.7 | |
| — | 2.00 | — | — | ||
| — | — | — | 2,054.94 | ||
| and Commissioning of consisting of 3 Phase, HourTimer), Contactor Rating incoming, 16/20ASP 10kA | : - Fixng Floor/Panel/Tower/Wallmounted TPN as job. | — | Street 2 NC) lock. | ||
| — | 2.00 | — | — | ||
| Supply of Computer for - (Intel Core i5 All in One PC with 23.8 Inch Display/ Windows 11 Professionalmore than 8 GB , expandanble upto 32 GB , SSD 500 GB or more) . | — | — | — | 1,07,101.7 | |
| — | 40.00 | — | — | ||
| "Supply of 200 W LED Flood light energy efficient enviornment friendly with driver including wiring of light as per HQ specification. | — | — | — | 1,82,915.2 | |
| — | 8.00 | — | — | ||
| — | — | — | 47,457.6 | ||
| — | 8.00 | — | — | ||
| — | — | — | 1,558.8 | ||
| — | 4.00 | — | — | ||
| "Supply, Installation Testing and commissioning of integrated 30 Watt LED & Li-ion battery based Solar Street Light including Pole height of 6 m Battery included in the luminaire enclosure, with water proof (IP65 or better) and corrosion resistant, Power output of PV Module 75 Wp at 16.4 ±0.2 Volt at STC Battery capacity 12.8 V (nominal), 30 Ah at STC (1 day autonomy) , Nominal bore size of tube / Thickness of tube65 mm / 4.5mm." | — | — | — | 94,915.24 | |
| — | — | — | 4,09,735.66 | ||
| on the sub-total | GST @ 18% | — | — | ||
| — | — | — | 10,98,303.29 | ||
| — | 40.00 | — | — | ||
| Supply of 20W or higher wattage LED tube light with Batten ( integrated electronic driver).As per CEGE approved Specification for LED tube light-high power,2100 Lumen output,220V, 50Hz AC with constant current driver with short circuit and overload protection etc. | — | — | — | 13,525.6 | |
| — | 40.00 | — | — | ||
| Fixing and Commisioning of 20W or higher wattage LED tube light with Batten | — | — | — | 1,623.6 | |
| — | 10.00 | — | — | ||
| "Supply of sensor based street light LED 45 watt or higher wattage street light as per Specification No. CEE/S/185/ LED/12/21/Rev-0,2021 dated 22/12/2021 | — | — | — | 59,322 | |
| — | 10.00 | — | — | ||
| Fixing and commissioning of LED 45 watt or higher wattage street light including wiring of light from loop box with proper termination by Pin Type Terminal End Lugs including fixing to the arm by mean of stainless steel screws and stainless steel fastener as per site requirenment, to complete the job. | — | — | — | 1,948.5 | |
| — | 8.00 | — | — | ||
| "Supply of 3 modular plate and metal/pvc box with 6A/16A twin socket Shutter type and 16 or 20A switch. All item will be modular type and separate (as per PCEE specification no.CEE/P/56/301 /MAINTENANCE, Dtd. 17/11/2022.) | — | — | — | 3,084.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
explanatory note
ATTACHMENT
GCC 2022
ATTACHMENT
GCC-2022Correctionslip1.pdf
ATTACHMENT
AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
JPOforconcealedwiring.pdf
ATTACHMENT
JPOfordiggnigwork.pdf
ATTACHMENT
LEDSpecificationScan_compressed.pdf LED Specification
ATTACHMENT
Specification.pdf
ATTACHMENT
GeneralConditions.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
LEDSpecificationScan_compressed.pdf
ATTACHMENT
ExplanatorynotemodWCDjan26-1-7.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .