Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,720
Closing Date
10 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2022_RDPR_167987_7
3rd Time e-NIT No. 14 REW UDH 22-23 Date 27/4/2022
Open Tender
Civil Works
Percentage
60 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN REW UDHAMPUR
₹5,720
Yes
11 May 2022
30 Apr 2022
11 May 2022
30 Apr 2022
10 May 2022
30 Apr 2022
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 100 % all kind soil Including all leads, lift and carriage comp
Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc (not exceeding 1.5 mtr in depth) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan depth upto 1.5 Mtr including disposal of excavated earth upto 1 mtr from urring edge, dispoded earth is to be levelled and neatly dressed. 100 % all kind soil Including all leads, lift and carriage complete.
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) Including all leads, lift and carriage complete.
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 20mm nominal size) Including all leads, lift and carriage complete.
Dumping / filling of stones including cost of stones. In horizontal on level. Including all leads, lift and carriage complete. Including all leads, lift and carriage complete.
Providing and laying stone soling in horizontal Including all leads, lift and carriage complete.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .