Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC WORK IS AWARDED BEING L1 BIDDER |
| 2 | L2₹2.3 Cr+₹13.1 L (6.03%)Rejected-Finance PLOT NO 4541 8062 INDRAHARI NAGAR TURANG DIST ANGUL ODISHA 759122 | DHENKANAL | ODISHA | 759122 | ₹2.3 Cr+₹13.1 L (6.03%) | L2 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 3 | L3₹2.6 Cr+₹42.2 L (19.4%)Rejected-Finance ANGUL ODISHA 759132 INDIA UDYAM OD 01 0005071 | ANUGUL | ODISHA | 759132 | ₹2.6 Cr+₹42.2 L (19.4%) | L3 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 4 | L4₹2.8 Cr+₹65.0 L (29.9%)Rejected-Finance | ₹2.8 Cr+₹65.0 L (29.9%) | L4 | Rejected-Finance REJECTED NOT BEING L1 BIDDER |
| 5 | Rejected-Technical ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | - | - | Rejected-Technical REJECTED DUE TO NON SUBMISSION OF CONFIRMATORY DOCUMENT. |
Tender Value
₹2.6 Cr
EMD Value
₹3.3 L
Closing Date
7 Mar 2024, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Concreting of coal transportation road from traffic chhak no.02 towards mines of Bhubaneswari OCP under Jagannath Area. (Retender/2nd call)
2024_MCL_301948_1
MCL/GM(JA)/SO(C)/e- Tender/23-24/147 Dtd-19/02/24
Open Tender
Civil Works - Roads
Item Rate
2005 days
Bhubaneswari OCP
AS PER NIT
5 documents required · 5 mandatory
₹3.3 L
17 Apr 2024
20 Feb 2024
9 Mar 2024
21 Feb 2024
7 Mar 2024
21 Feb 2024
21 Feb 2024 - 29 Feb 2024
Amount
Preparation and consolidation of subgrade with road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with power roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth upto 50 metres.
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications)
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- I Material
Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. for grading- III Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
BIBHUTI BHUSAN DHAR
M/S.PRADHAN CONSTRUCTION
SUSIL NATH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .