| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC | ₹20.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹20.4 LRejected-Finance | ₹20.4 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | GOBALAKRISHNAN P L1 | K.SELVARAJ L2 |
|---|---|---|---|---|---|
| 1.00Name of Work:Construction of Drainage From Vellanaipatti Main Road Chinnadurai Maligai Kadai to Poonusamy House at Vellanaipatti H/O Vellanaipatti Panchayat . SS Kulam union in Coimbatore District under Village Panchayat General Fund 2025-2026 Package No.TN 01-SSKM-01 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification . | 325.6 | Cum | 263 ₹85,632.80 | 270 ₹87,912 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 32.56 | Cum | 5,561 ₹1.8 L | 5,600 ₹1.8 L |
| 4.00 | Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete. | 641.6 | Sqm | 547.5 ₹3.5 L | 550 ₹3.5 L |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum. | 142.56 | Cum | 6,316 ₹9.0 L | 6,400 ₹9.1 L |
| 6.00 | Plastering with C.M 1:5 mix,to 20mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete | 140.8 | Sqm | 573 ₹80,678.40 | 600 ₹84,480 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.2 | MT | 91,924 ₹18,384.80 | 91,950 ₹18,390 |
| 8.00 | Cement Concrete 1:1.5:3 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete. | 2.34 | Cum | 9,301 ₹21,764.34 | 9,310 ₹21,785.40 |
| 9.00 | Removing the existing drainage structure | 126.72 | Cum | 520 ₹65,894.40 | 550 ₹69,696 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,06,919 ₹3.1 L | 3,11,375 ₹3.1 L |
Tender Value
₹20.4 L
EMD Value
₹20,500
Closing Date
12 Jan 2026, 3:00 pmClosed
The Special Officer Vellanaipatti Panchayat
The Special Officer Vellanaipatti Panchayat
Construction of Drainage From Vellanaipatti Main Road Chinnadurai Maligai Kadai to Poonusamy House at Vellanaipatti H/O Vellanaipatti Panchayat
2026_RDTN_639614_1
03/2025-2
Open Tender
Civil Works
180 days
Vellanaipatti
Construction of Drainage From Vellanaipatti Main Road Chinnadurai Maligai Kadai to Poonusamy House at Vellanaipatti H/O Vellanaipatti Panchayat
4 documents required · 4 mandatory
₹0
₹20,500
Yes
24 Jan 2026
6 Jan 2026
12 Jan 2026
6 Jan 2026
12 Jan 2026
6 Jan 2026
Amount
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification .
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting steel centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS sheets or susitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x 3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaced at 90cm centre to centre and supported by casurina props of 10cm to13cm dia spaced at 75cm centre to centre complying with standard specifications etc. complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum.
Plastering with C.M 1:5 mix,to 20mm thick including cost and conveyence of all materials to site and all other labour charges etc., complete
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1.5:3 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Removing the existing drainage structure
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.SELVARAJ (BID ID -1559486)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_765743.xls
BOQ • 0.31 MB
pricebid.pdf
Tender Documents • 0.91 MB
tech.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid