Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹9.9 L+₹3,963.61 (0.40%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Sanjay Contractor L2 | DEEPA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001. Construction of Kitchen Shed at Veppanapalli Girls High School H/o. Veppanapalli. Estimate Amount: Rs. 10.01 lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 23.99 | Cum | 247.26 ₹5,931.77 | 246.27 ₹5,908.02 Lowest |
| 3.00 | Supplying and filling of conveyed earth with a lead of 5Km for basement filling | 10.92 | Cum | 112.57 ₹1,229.26 | 112.12 ₹1,224.35 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 7.09 | Cum | 4,933.2 ₹34,976.39 | 4,913.52 ₹34,836.86 Lowest |
| 5.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction | 26.58 | Cum | 5,890.58 ₹1,56,571.62 | 5,867.09 ₹1,55,947.25 Lowest |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | |||||
| 7.00 | Grade Beam | 52.35 | Sqm | 518.05 ₹27,119.92 | 515.98 ₹27,011.55 Lowest |
| 8.00 | Lintel | 68.52 | Sqm | 1,036.1 ₹70,993.57 | 1,031.97 ₹70,710.58 Lowest |
| 9.00 | Sunshade | 6.89 | Sqm | 1,036.1 ₹7,138.73 | 1,031.97 ₹7,110.27 Lowest |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.3 | MT | 90,153.15 ₹1,17,199.1 | 89,793.62 ₹1,16,731.71 Lowest |
Tender Value
₹10.0 L
EMD Value
₹11,000
Closing Date
3 Jul 2025, 3:00 pmClosed
The Block Development Officer, Veppanapalli
The Block Development Officer, Veppanapalli
Krishnagiri District, Veppanapalli Block, PTMGR 2024-2025, Construction of Kitchen shed at Veppanapalli Girls High School H/o. Veppanapalli. Package No 2025 2026 PTMGR 18
2025_RDTN_576131_1
ROC_NO_7887_2024_X1_13_02_2025
Open Tender
Civil Works
Item Rate
90 days
Veppanapalli
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,000
The Block Development Office, Veppanapalli
28 Oct 2025
30 Jun 2025
3 Jul 2025
30 Jun 2025
3 Jul 2025
30 Jun 2025
2 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .