Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -6.30% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹18,857.82 (6.72%)Admitted-Finance | +0.00% | ₹3.0 L+₹18,857.82 (6.72%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹25,502.96 (9.09%)Admitted-Finance | +2.22% | ₹3.1 L+₹25,502.96 (9.09%) | L3 | Admitted-Finance |
| 4 | L4₹3.1 L+₹28,616 (10.2%)Admitted-Finance | +3.26% | ₹3.1 L+₹28,616 (10.2%) | L4 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
7 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGR. (C ), BR-XIV
516, D. H. ROAD, KOLKATA-700034
MAINT. OF BITUMINOUS ROAD AT THE BYE LANE OF B.C.ROAD NEAR PRE. NO.-270,265A/C,185/4A ETC. INCL. PROTECTION OF ROAD BY CONSTRUCTION OF R.C.C AND BRICKS WALL AT THE BESIDE OF B.C.ROAD NEAR PRE. NO.-185/4A ETC. IN WARD NO.-128.
2026_KMC_1039298_1
KMC/XIV/128/002/26-27/R
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-128
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
15 Sept 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | 197.02 | SQUARE METER | 14.4 | ₹2,837.09 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(b) For each additional Depth of 150mm and part thereof. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | 197.02 | SQUARE METER | 19 | ₹3,743.38 |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume).
(c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4) | 13.8 | CUBIC METER | 1,172.6 | ₹16,184.81 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 0.64 | SQUARE METER | 361 | ₹231.04 |
| 5 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e)) | - | CUBIC METER | 2,596.83 | - |
| 6 | Mending Potholes and depressions by stitching picked jhama bricks with one brick-on-edge laid in herring bone pattern and including necessary cushion of sand below the soling (and in between layers) including cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, finishing the surface to match with adjacent areas complete as per direction.
(b) One brick-on-edge laid in herring bond pattern (thickness 125
mm) ( Ref :PWD(Rds & Brdgs) 2018, It. No. 10.09 (b), P-280) | 179.02 | SQUARE METER | 518 | ₹92,732.36 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) ( Ref :PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3?1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i), Pg-230,Table-I, It-4,) | 197.02 | SQUARE METER | 10.33 | ₹2,035.22 |
| 8 | Transportation and laying 40 mm thick hot asphaltum mixture from
kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture)
a) without paver finisher
i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) | 197.02 | SQUARE METER | 41 | ₹8,077.82 |
| 9 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1 | CUBIC METER PERCENT | 119.27 | ₹119.27 |
| 10 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT
2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 2.73 | CUBIC METER PERCENT | 192.38 | ₹525.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TForm.pdf
Tender Documents • 0.40 MB
BOQ_2552450.xls
BOQ • 0.36 MB
AddlSpc.pdf
Additional Documents • 3.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .