| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹12.9 L (9.79%)Admitted-Finance | ₹1.5 Cr+₹12.9 L (9.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹16.6 L (12.6%)Admitted-Finance | ₹1.5 Cr+₹16.6 L (12.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NEW JEHLUM CONSTRUCTION CO. L2 | Triple s Associates L3 | M/s JAI LAXMI ROAD BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply including digging, carrying by lorry, filling River Bed Material mixed with coarse sand and round nallah shingle 75mm as per lines, cross sections, grade and camber, including watering & consolidation in layers with 8-10 Ton Power Roller Complete ( Finished work including material and labour) | 960 | Cum | 1,200 ₹11,52,000 | 500 ₹4,80,000 Lowest | 800 ₹7,68,000 |
| 2.00 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 810 | Cum | 1,300 ₹10,53,000 | 2,000 ₹16,20,000 | 1,200 ₹9,72,000 Lowest |
| 3.00 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. Including cost of priming coat/tack and filling patches /pot holes with BUSG/BM in required level and grade, roling with road roller 8 to 10 tonee capacity to achieve the required compaction and density.. | 155 | Cum | 8,200 ₹12,71,000 Lowest | 9,000 ₹13,95,000 | 8,500 ₹13,17,500 |
| 4.00 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity all complete including tack coat and all leads lifts and carriage Complete. | 35,000 | Sqm | 315 ₹1,10,25,000 | 325 ₹1,13,75,000 | 290 ₹1,01,50,000 Lowest |
Tender Value
₹1.1 Cr
Closing Date
22 May 2021, 4:00 pmClosed
Er. Balbir Singh
XEN Div-III Jammu
BOQ
2021_PWDJK_123615_1
Short e-NIT No.CD-III/04 of2021-22 Date 01-05-2021
Open Tender
Civil Works
Item Rate
30 days
Marh
NIT
3 documents required · 3 mandatory
₹6,000
Yes
xEN PWD Const Div. No.III
Exempted
26 May 2021
3 May 2021
22 May 2021
3 May 2021
22 May 2021
3 May 2021
Amount
Supply including digging, carrying by lorry, filling River Bed Material mixed with coarse sand and round nallah shingle 75mm as per lines, cross sections, grade and camber, including watering & consolidation in layers with 8-10 Ton Power Roller Complete ( Finished work including material and labour)
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. Including cost of priming coat/tack and filling patches /pot holes with BUSG/BM in required level and grade, roling with road roller 8 to 10 tonee capacity to achieve the required compaction and density..
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity all complete including tack coat and all leads lifts and carriage Complete.
NEW JEHLUM CONSTRUCTION CO.
Triple s Associates
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_240479.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .