Tender Value
₹13.0 L
EMD Value
₹1.3 L
Closing Date
22 Sept 2026, 5:00 pm
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of C.C Road and Drain At Ward No.07 Moh Jatan/ghair Rambagh at H/o Shri Sanjay to H/o Shri Jaypal, H/o Jay Singh to H/o Balram, H/o Shri Kapil to H/o Shri Omprakash and H/o Shri Rajesh to H/o Shri Ghanshyam in N.P.P.Bijn
2026_DOLBU_1181914_6
137/ET-NPPB/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
EO NPP BIJNOR
PLEASE PREFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹766
EO NPP BIJNOR
₹1.3 L
2 Sept 2026
2 Sept 2026
23 Sept 2026
2 Sept 2026
22 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling old existing C.C road.s including supply of all material,labour and T&P etc.required for proper completion of work | 155.7 | Sqm | 70 | ₹10,899 |
| 2 | Dismentling of old and damage drain brick work including supply of all material,labour and T&P etc.required for proper completion of work | 2.42 | Cum | 620 | ₹1,500.4 |
| 3 | Deduction of old and workable brick 40% of item no-3 | 445.28 | nos | 5.8 | ₹2,582.62 |
| 4 | Breaking of old brick bets for 4cm guage brick ballast 60% 0f item no-3 | 1.45 | Cum | 93 | ₹134.85 |
| 5 | Deduction cost of old brick ballast as per item no-4 | 1.45 | nos | 1,150 | ₹1,667.5 |
| 6 | Construction of Subgrade and Earthen Shoulders Construction o subgrade and earthen shoulders with approved material obtained from borrow pits withall lift sandleads, transporting to site,spreading,grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 536.63 | cum | 208 | ₹1,11,618.78 |
| 7 | Concrete in 1:4:8 with cement,fine sand and Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 19.63 | cum | 6,850 | ₹1,34,465.5 |
| 8 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 62.71 | Cum | 5,310 | ₹3,33,016.65 |
| 9 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work. | 144.9 | Sqm | 215 | ₹31,153.5 |
| 10 | P.C.C in 1:2:4 with cement,coarse sand and stone grit of 2cm guage including supply of all material,labour and T&P etc.required for proper completion of work | 5.82 | cum | 7,600 | ₹44,232 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.48 MB
BOQ_2222036.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .