Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹15.0 L+₹42,744.30 (2.94%)Rejected-Finance | L2 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 3 | L3₹15.2 L+₹67,306.80 (4.63%)Rejected-Finance | L3 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 4 | L4₹15.3 L+₹75,407.20 (5.18%)Rejected-Finance | L4 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 5 | L5₹15.6 L+₹1.1 L (7.38%)Rejected-Finance | L5 | Rejected-Finance HIGHER THEN L1 BIDDER |
| Sl No | Description | Qty | Unit | Darjeeling Enterprises L5 | SANJAY KAUSHIK L6 | JALAPAHAR HARDWARE L7 | TSHERING WANGYAL BHUTIA L1 | BHASKAR PRADHAN L4 | REEMA TAMANG AND SONS L9 | BIMAL BHATTRAI L8 | THUKKEPA & PANGDOK L2 | RAI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavatingin trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/ dense soil including forming bottom surface to required level or slope, complete all as specified and directed. | 6.6 | Cum | 390 ₹2,574 | 410 ₹2,706 | 440 ₹2,904 | 360 ₹2,376 Lowest | 370 ₹2,442 | 420 ₹2,772 | 380 ₹2,508 | 400 ₹2,640 | 430 ₹2,838 |
| 2.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25cm in soft/loose soil all as specified and directed. | 1.9 | Cum | 323 ₹613.7 | 335 ₹636.5 | 337 ₹640.3 | 320 ₹608 Lowest | 340 ₹646 | 330 ₹627 | 325 ₹617.5 | 332 ₹630.8 | 327 ₹621.3 |
| 3.00 | Removal of surplus excavated soils to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.50m above the starting point, complete all as specified and directed. | 4.7 | Cum | 345 ₹1,621.5 | 360 ₹1,692 | 365 ₹1,715.5 | 340 ₹1,598 Lowest | 370 ₹1,739 | 380 ₹1,786 | 350 ₹1,645 | 375 ₹1,762.5 | 355 ₹1,668.5 |
| 4.00 | Excavation in post holes in soft/loose soil or similar holes each n exc 0.5 cum getting out returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm and remaning surplus soil removing to a distance n exc 50cm and making good surface, complete all as specified and directed. | 17 | Each | 65 ₹1,105 | 58 ₹986 | 50 ₹850 | 45 ₹765 Lowest | 48 ₹816 | 55 ₹935 | 62 ₹1,054 | 60 ₹1,020 | 53 ₹901 |
| 5.00 | M&L for plain cement concrete (1:3:6), type C2 (using 40mm graded crushed stone aggregate) as in foundation filling and mass concrete, complete all as specified and as directed. | 2.19 | Cum | 10,300 ₹22,557 | 10,000 ₹21,900 | 10,500 ₹22,995 | 9,800 ₹21,462 Lowest | 9,900 ₹21,681 | 10,400 ₹22,776 | 10,100 ₹22,119 | 10,200 ₹22,338 | 10,600 ₹23,214 |
| 6.00 | M&L for plain cement concrete (1:4:8), type D2 (using 40 mm graded stone aggregates) as in foundation, filling and mass concrete, complete all as specified and directed. | 0.97 | Cum | 9,000 ₹8,730 | 10,400 ₹10,088 | 9,400 ₹9,118 | 8,800 ₹8,536 Lowest | 9,800 ₹9,506 | 9,600 ₹9,312 | 10,200 ₹9,894 | 10,000 ₹9,700 | 9,200 ₹8,924 |
| 7.00 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description and in any position not specifically provided for, complete all as specified and as directed. | 2.61 | Cum | 2,300 ₹6,003 | 2,600 ₹6,786 | 2,000 ₹5,220 | 1,800 ₹4,698 Lowest | 1,900 ₹4,959 | 2,100 ₹5,481 | 2,400 ₹6,264 | 2,200 ₹5,742 | 2,500 ₹6,525 |
| 8.00 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 12.6 | Cum | 2,100 ₹26,460 | 2,300 ₹28,980 | 1,800 ₹22,680 | 1,600 ₹20,160 Lowest | 1,700 ₹21,420 | 2,000 ₹25,200 | 2,400 ₹30,240 | 1,600 ₹20,160 Lowest | 1,900 ₹23,940 |
| 9.00 | M&L for brick work with sub class 'B' bricks , using old size bricks, straight or curved on plan exc 6 m mean radius built in cement mortar (1:6), complete all as specified and directed. | 25 | Cum | 11,830 ₹2,95,750 | 13,100 ₹3,27,500 | 12,440 ₹3,11,000 | 11,800 ₹2,95,000 Lowest | 11,950 ₹2,98,750 | 13,440 ₹3,36,000 | 13,500 ₹3,37,500 | 11,820 ₹2,95,500 | 11,870 ₹2,96,750 |
| 10.00 | M&L for hardcore using broken stone or boulders of gauge n exc. 63mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and directed. | 11.5 | Cum | 3,050 ₹35,075 | 2,850 ₹32,775 | 3,000 ₹34,500 | 2,800 ₹32,200 Lowest | 3,200 ₹36,800 | 3,000 ₹34,500 | 3,150 ₹36,225 | 3,100 ₹35,650 | 2,950 ₹33,925 |
Tender Value
₹13.6 L
EMD Value
₹27,200
Closing Date
11 Oct 2025, 6:00 pmClosed
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
PROVN OF SHED OVER STATIC WATER TANK (SUMP) NEAR SMBK-3, PARKING SHED AND FOL SHED FOR BDE MT AT JALAPAHAR UNDER AGE (I) DARJEELING
2025_MES_731454_1
CWE/136-WE/39 OF 2025-26
Open Tender
Civil Works
Item Rate
240 days
DARJEELING
Class E, Category a(i)
8 documents required · 8 mandatory
₹500
Yes
AGE (I) Darjeeling
₹27,200
Yes
15 Nov 2025
18 Sept 2025
13 Oct 2025
18 Sept 2025
11 Oct 2025
3 Oct 2025
18 Sept 2025 - 26 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .