| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.1 LAccepted-AOC | ₹44.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.0 LRejected-Finance | ₹45.0 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Subbaiah L1 | A.Ramasamy L2 |
|---|---|---|---|---|---|
| 1.00Construction of Health Sub Centre at Rajapandi Village & Panchayat in Keelapavoor Panchayat Union | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soi ls and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 165 | /cum | 263 ₹43,395 Lowest | 265 ₹43,725 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15.96 | /cum | 1,827.5 ₹29,166.9 Lowest | 1,830 ₹29,206.8 |
| 4.00 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete | 63.8 | /cum | 168 ₹10,718.4 Lowest | 170 ₹10,846 |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 26.38 | /cum | 5,390 ₹1,42,188.2 Lowest | 5,400 ₹1,42,452 |
| 6.00Brick work in Cement Mortar 1:5 using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-3/4" for foundation and basement including curing, etc., complete complying with standard specification. | |||||
| 7.00 | Upto Basement | 24.41 | /cum | 6,124 ₹1,49,486.84 Lowest | 6,150 ₹1,50,121.5 |
| 8.00 | Above Basement to GF | 47.95 | /cum | 6,215 ₹2,98,009.25 Lowest | 6,250 ₹2,99,687.5 |
| 9.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25 mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid) | |||||
| 10.00 | Below Basement | 126.75 | /Sqm | 547 ₹69,332.25 Lowest | 550 ₹69,712.5 |
Tender Value
₹45 L
EMD Value
₹45,000
Closing Date
5 Feb 2026, 3:00 pmClosed
BDO (B.PT)
BDO (B.PT)
Construction of Health Sub Centre at Rajapandi Village at Panchayat in Keelapavoor Panchayat Union. Under SADP 2025-2026
2026_RDTN_649206_1
Health Sub Centre at Rajapandi
Open Tender
Civil Works
Works
KEELAPAVOOR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹45,000
Yes
8 Jul 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
30 Jan 2026 - 5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Health Sub Centre at Rajapandi Village & Panchayat in Keelapavoor Panchayat Union | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub-soi ls and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 165 | /cum | 263.78 | ₹43,523.7 |
| 3 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15.96 | /cum | 1,827.67 | ₹29,169.61 |
| 4 | Supplying and filling of conveyed Earth by lorry in basement filling including stacking for premeasurement, conveyance loading, and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete | 63.8 | /cum | 168.15 | ₹10,727.97 |
| 5 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 26.38 | /cum | 5,395.9 | ₹1,42,343.84 |
| 6 | Brick work in Cement Mortar 1:5 using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-3/4" for foundation and basement including curing, etc., complete complying with standard specification. | - | - | - | - |
| 7 | Upto Basement | 24.41 | /cum | 6,124.33 | ₹1,49,494.9 |
| 8 | Above Basement to GF | 47.95 | /cum | 6,217.2 | ₹2,98,114.74 |
| 9 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25 mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid) | - | - | - | - |
| 10 | Below Basement | 126.75 | /Sqm | 547.5 | ₹69,395.63 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_778300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_778300.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].