Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC 37 PUNJABI COLONY NEAR RAILWAY CROOSING ARYA SAMAJ ROAD MATHURA U P | MATHURA | MATHURA | UTTAR PRADESH | 281001 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹8.8 L+₹37,306 (4.41%)Rejected-AOC | L2 | Rejected-AOC Other than L1 | |
| 3 | L3₹14.0 L+₹5.5 L (64.9%)Rejected-AOC 114 SHASTRI NAGAR MEERUT | MEERUT | UTTAR PRADESH | 245206 | L3 | Rejected-AOC Other than L1 |
Tender Value
Refer Docs
EMD Value
₹34,000
Closing Date
13 Mar 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Shri TKM Rambhal, EE
GE (West) Mathura
Repair/maint of swimming pool and allied works under GE (W) Mathura.
2021_MES_420705_1
8300/995/E8
Open Tender
Civil Works
Item Rate
219 days
Mathura Cantt
As per tender documents
9 documents required · 9 mandatory
₹500
GE (West) Mathura
₹34,000
Yes
26 Mar 2021
11 Feb 2021
15 Mar 2021
25 Feb 2021
13 Mar 2021
28 Feb 2021
60 days
Amount
M&L for cleaning tiles of side wall & bottom surface of swimming pool approximately 700 Sqm area with the help of soft nylon brushes & chemical without damaging any tiles laid in swimming pool including cleaning of joints between the tiles and refilling white cement/ apex solution between joints and removing dirty materials away 50 Mtr distance from the swimming pool and dewatering of waste/ dirty water from the swimming pool complete all as specified and directed. (Note:- Cleaning will be carried out as and when required during the operation of plant)
Outsourcing of services related to swimming pool plants for all days including Sunday & holiday in two shifts with the help of one FGM of 8 Hrs shift, (i.e. each shift consist of 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs). The contractor will be responsible for daily cleaning of plant room, chloronome room, filters, motors, pumps, starters, LT panel, DG set, pipe line, sluice valves & surrounding area required for safety and smooth running of the installation Operator will maintain the record of running of plants/ DG set on described printed log sheet approved by the Engineer-in-Charge to be supplied by the contractor. The contractor will also be responsible for routine general maintenance of water circulating pumps, plant, alum/soda ash dosing system, gland leakage of pumps & sluice valves, tightening of electric loose connections and other minor repair/ rectification of all machine and equipments as and when required to ensure serviceability of plant comprising of the following complete all as specified and directed :- (i) Water circulating mono block pump three phase 10 HP-02 Nos. (ii) Pressure filter of capacity 27500 Gallons/ hr--01 Nos (iii) Air blower pump with 5 HP motor -- 01 No (iv) Sluice valve 80mm to 200mm---10 Nos (v) DG set 40 KVA.--- 01 No (vi) LT panel with starters.--- 01 No (vii) Soda ash dosing system -- 01 No (viii) Alum dosing system. --01 No (ix) Suction sweeper ---- 01 No (x) Chlornome plant --01 No Notes for Item No. 2.00 (a) Operator should be an ITI holder in respective trade having experience in operation. (b) Contractor will arrange proper uniform to operator with company tag and name plate of operator also provide life insurance for the operator. (c) Contractor will make well arrangement of office such as chair, table and table cloth. (d) Contractor will provide printed log sheet of VT pumps & DG set. (e) Contractor will ensure that all required tools are available on site. (f) Contractor will ensure daily cleaning of pumps, motor, starter, panel, DG set, Radial well, approch bridge and surrounding area. (g) Contractor will maintain notice board and reflect all safety chart. (h) Contractor will ensure that all duty person have security pass when enter in restricted area. (j) Contractor will responsible to improve the environment of installation as directed by Engineer-in-Charge. (k) Contractor will provide mobile phone to communication with staff. (l) Contractor will ensure first aid kit and safety instructions on site. (m) Contractor will ensure that all the operators employed by him should be well aware of standing orders and fire fighting instructions. (n) Cost of note (b) to (m) shall be deemed to be included in quoted rates. (o) Contractors shall adhered to payment of fair minimum wages as Govt circular issued from time to time including payment of contribution towards ESI & EPF in any case irrespective of quoted rate.
Notes for Item No. 2.00 (a) Operator should be an ITI holder in respective trade having experience in operation. (b) Contractor will arrange proper uniform to operator with company tag and name plate of operator also provide life insurance for the operator. (c) Contractor will make well arrangement of office such as chair, table and table cloth. (d) Contractor will provide printed log sheet of plants & DG set. (e) Contractor will ensure that all required tools are available on site. (f) Contractor will ensure daily cleaning of pumps, motor, starter, panel, DG set and surrounding area. (g) Contractor will maintain notice board and reflect all safety chart. (h) Contractor will ensure that all duty person have security pass when enter in restricted area. (j) Contractor will responsible to improve the environment of installation as directed by Engineer-in-Charge. (k) Contractor will provide mobile phone to communication with staff. (l) Contractor will ensure first aid kit and safety instructions on site. (m) Contractor will ensure that all the operators employed by him should be well aware of standing orders and fire fighting instructions. (n) Cost of note (b) to (m) shall be deemed to be included in quoted rates. (o) Contractors shall adhered to payment of fair minimum wages as Govt circular issued from time to time including payment of contribution towards ESI & EPF in any case irrespective of quoted rate.
Labour and T&P to maintain water quality of swimming pool, 2.25 lakh gallons capacity by mixing alum, soda ash, copper sulphate, chlorine granular disinfectant of best quality as required to maintain the quality of water such as clarity, PH value 7 to 8, residual chlorine of 0.8 to 1 PPM. The contractor will be responsible for daily removing unwanted materials and cleaning of swimming pool & fungus from floor & side walls with the help of suction sweeper and nylone brush all as directed. the contractor will also be responsible to improve the environment of installation, daily cleaning and removing grass from the surrounding area of swimming pool and installation complete all as specified and directed. (Note for item No. 3 only) (i) Alum, soda ash, copper sulphate, chlorine granular disinfectant will measured & paid separatly.(ii) If the quality of water as mentioned above is not maintained by the contractor a panel recovery shall be made for the same as decided by GE.
Supply only white alum crystal grade-I of best quality complete all as specified and directed.
Supply only soda ash of best quality complete all as specified and directed.
Supply only copper sulphate in crystals of best quality complete all as specified and directed.
Supply only CD-999 calcium based high strength chlorine granular disinfectants for water treatment in packing of 45/50Kg plastic drums complete all as specified and directed.
S&F in repair PVC hose pipe heavy duty 50mm dia suitable for suction sweeper complete all as specified and directed.
S&F in repair of nylon rope 25mm dia complete all as specified and directed.
S&F in repair nylon brushes of suction sweeper of existing size and as per sample 3 feet long complete all as specified and directed.
S&F in repair PVC float valve heavy duty of 200mm dia suitable for to hold PVC hose pipe in water including fixing arrangement complete all as specified and directed.
M&L for in replacement of gland packing to stop leakage of water from pumps/sluice valves complete all as specified and directed.
Labour and T&P to attend electric complaints by skilled electrician of non functional control panel, starter, motor, MCCB, identifying & rectify the electric fault, tightening the electric loose connections, cable connections to make the plant functional complete all as specified and directed.
M&L for dewatering of complete balancing tank, removing all the dust particle, sand etc, cleaning complete inner portion of the tank including minor repair and painting of complete inner portion with water proof paint complete all as specified and directed.
S&F in repair of suction sweeper stainless steel body with nylon brushes of existing size and as per sample 3 feet long complete all as specified and directed.
Dismantling of compressor with air blower capacity 5HP electric motor from swimming pool transporting to civil workshop for repairing, dismantling of blower & motor re-assembling after complete repairing and carrying back to swimming pool & connecting with existing system and testing on load complete all as specified and directed. (Note: rewinding if required shall be measured and paid separately)
M&L for rewinding of air blower motor of capacity 5HP, three phase 415 volts, 50Hz AC with super enameled copper winding wire of existing size and gauge including insulating material, heating drying, assembling and testing complete all as specified and directed.
M&L for repairing of air blower of capacity 5HP, including replacement of ball bearing both DE & NDE sides, lubricating oil, assembling and testing on load complete all as specified and directed.
S&F in replacement of cable flat type with copper conductor of size 16 Sqmm 3 core complete all as specified and directed.
Dismantling of treated water mono block pump with 10.0 HP electric motor from swimming pool transporting to civil workshop for repairing, dismantling of motor re-assembling after complete repairing and carrying back to swimming pool & connecting with existing system and testing on load complete all as specified and directed. (Note: rewinding if required shall be measured and paid separately)
M&L for rewinding of treated water mono block pump motor of capacity 10.0 HP, three phase 415 volts, 50Hz AC with super enameled copper winding wire of existing size and gauge including insulating material, heating drying, assembling and testing complete all as specified and directed.
M&L for repairing of treated water mono block pump of capacity 10.0 HP, including replacement of bronze impeller, ball bearing, greasing assembling and testing complete all as specified and directed.
S&F in repair sluice valve 100 mm dia bore cast iron both end flanged with CI wheel high tensile brass spindle including fixing arrangement class PN-1.0 suitable for 100 mm bore MS pipe with all fittings such as rubber gasket sheet, washer, nut & bolt etc; complete all as specified and directed.
S&F in repair sluice valve 150 mm dia bore cast iron both end flanged with CI wheel high tensile brass spindle including fixing arrangement class PN-1.0 suitable for 150 mm bore MS pipe with all fittings such as rubber gasket sheet, washer, nut & bolt etc; complete all as specified and directed.
S&F in repair contactor ML-1.5 three phase 415 volt 50 HZ AC complete with 1 NO +1NC complete all as specified and as directed.
S&F in repair over load protection three phase 415 volt 50 HZ AC of rating 0-20 Amps complete all as specified and directed.
S&F in repair single phase preventor 415 volts 50 HZ complete with electronic circuit complete all as specified and directed.
S&F in repair for contactor ML-2 three phase 415 volts 50 HZ AC complete with 1NO +1NC complete all as sepcified and as directed.
S&F in repair MCCB 3 Pole 63 Amps, 415 volts, 25 KA rupturing capacity with adjustable thermal & magnatic setting complete all as specified and directed.
S&F in repair star delta timer suitable size for automatic starter complete all as specified and directed Note (Applicable to Item No. 01 to 33) : Contractor has to submit photographic record of work carried out at RAR and Final Bill stage including each make of material as approved by GE and being used at site. Also photographs showing measurement of hidden items incl measurement by measuring tape and showing presence of JE to be submitted alongwith each payment. JE/AGE will help contractor for taking photographs. Contractor shall be responsible for getting photos clicked and documented by JE/AGE. In case of missing photographs of any activity, the payment will not be made and the onus will be in part of builders. Cost to this effect shall be deemed to be included in the rates quoted by the tenderer.
RAJ CONSTRUCTIONS
Jain Traders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .