Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹19.3 L+₹1,821.19 (0.09%)Accepted-AOC | ₹19.3 L+₹1,821.19 (0.09%) | L2 | Accepted-AOC WO |
| 2 | L1₹19.3 LRejected-Finance | ₹19.3 L | L1 | Rejected-Finance NA |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 5 | Rejected-Technical ODISHA OD | KHORDHA | ODISHA | 751001 | - | - | Rejected-Technical L3 |
Tender Value
₹26.0 L
EMD Value
₹26,017
Closing Date
22 Mar 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
CONSTRUCTION OF MAHANAL DRAIN WITH COVER SLAB FROM CHAITANYA NAYAK RES TO SANATAN NAYAK RES AT NILIABAG NEW COLONY IN WARD NO. 29
2026_ORULB_127140_6
BM_14_2025_26
Open Tender
Civil Works - Others
Percentage
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹26,017
Yes
18 Jul 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
22 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling & removing Cement Concrete including stacking the useful materials for reuse and removing the debris within 50m. Lead | 40.24 | Cum | 858.6 | ₹34,550.06 |
| 2 | Earth Work in excavation of foundation in all kinds of soil within 50met. Initial lead and 1.5met. Initial lift including rough dressing and levelling the bed including all labour T&P etc. complete as directed by the Engineer - in Charge. | 181.62 | Cum | 299.53 | ₹54,400.64 |
| 3 | Conveyance of the excavated earth by mechanical means within 5 km lead. | 155.3 | Cum | 276.01 | ₹42,864.91 |
| 4 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 27.21 | Cum | 1,399.33 | ₹38,075.77 |
| 5 | Cement concrete (1:3:6) using 4cm size hard granite hand broken metal with all cost conveyance,royalty,taxes etc all complete. | 27.21 | Cum | 6,440.2 | ₹1,75,237.84 |
| 6 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. | 153.2 | Cum | 6,677.8 | ₹10,23,038.96 |
| 7 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete. | 111.83 | Qntl | 9,359.67 | ₹10,46,691.9 |
| 8 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. | 746.7 | sqm | 248.67 | ₹1,85,681.89 |
| 9 | Provision for Display board and photography | 1 | No | 1,153 | ₹1,153 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_584705.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .