Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Rate |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
23 Dec 2024, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/SEDC/SALEM
Office of the SE/SEDC/SLM
Works contract for West Division
2024_EB_509616_1
SE/SEDC/WC.027/24-25dt.6.12.24
Open Tender
Electrical and Maintenance Works
Works
365 days
West
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
14 Feb 2025
10 Dec 2024
24 Dec 2024
11 Dec 2024
23 Dec 2024
11 Dec 2024
Amount
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Stay bit 4.5” to 5” depth by using JCB or manual
Hard Rock requires without blasting
Medium rock and debse medium rock reqires blasting
Erection of poles.
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
Erection of stay set complete
Fixing of line materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2 /Tapping Channel Cross arm
LT 3 Phase cross arm
LT single Phase cross arm
HT / LT TI Fitting
Fixing of Aluminium Knob
Fixing of HT Pin Insulators (11/22 KV)
Fixing of HT 11KV stain disc
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Paving and Stringing of conductor
ACSR 7/4.09mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm conductor
Concreting of Poles
Mass concreting including Materials (Cement + River sand/ M.Sand and Blue metals and watering)
Sleeve concreting including cost of Materials and labour 375mm x 375mm x 50mm.
Stay concreting including cost of Materials and labour 375mm x 375mm x 50mm.
Earthing of Pole
Earthing of pole with coil earthing including burying looping and binding.
Replacement of earthing of pole with coil earthing including burying looping and binding
Transport of Poles/Materials/ Conductors and other materials
Transport of Poles/Materials/ Conductors and other materials (excluding loading and unloading charges) below 8 kms (Plains)
Transport of Poles/Materials/ Conductors and other materials (excluding loading and unloading charges) 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transport of Poles road side to pole pit including loading and unloading
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading & Unloading of Poles. & Materials
Loading of poles upto 27"
Loading of Metal (all sizes)
Unloading of poles upto 27"
Unloading of Metal (all sizes)
Loading of materials
Un-Loading of materials
Erection of Transformer
Loading or unloading of Transformer upto 100 KVA
Loading or unloading of Transformer above 100 and upto 200KVA
Loading or unloading of Transformer above 200 KVA
Erection of New Transformer all capacities (with jumpering)
Replacement of failed Transformers all capacities
Loading/ unloading of HT Metering set
Erection of HT Metering set
Replacement of failed metering set
Services Connections.
Releasing of Single phase service wire and refixing.
Releasing of Three phase service wire and refixing.
Erection of street light including fixure fitting
Dismantling of Line Materials
Dismantling of transformer structure set
Dismantling of Single pole transformer structure set
Dismantling of DP Structure with AB switch, Top channel, Cross Bracing, Earthing, Painting, Providing stay and concreting.
Dismantling of pole (9.0m and above).
Dismantling of pole (7.5m and 8.0mtr).
Dismantling of HT pin Insulator
Dismantling of HT/LT TI Fitting
Dismantling of 11 KV Strain Disc
Dismantling of 22 KV Strain Disc
Dismantling of LT 3 Phase X arm
Dismantling of Tapping X arm, HT V Cross arms/ Channel Cross arms / Guarding cross arm
Dismantling of 1 PH X arm
Dismantling of Alu Knob
Dismantling of LT pin Insulator
Dismantling of LT Shackle Insulator
Dismantling of Stay set complete
Dismantling of ACSR 7/3.35mm
Dismantling of ACSR 7/2.59mm & 7/2.11mm ACSR conductor
Re-stringing of ACSR 7/3.35mm
Re-stringing of ACSR 7/2.59mm
Dismantling of street light including fixture fitting
Lathe works
Labour charges for alteration of Back Clamps / Stay Clamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Cutting of channel
Cutting of RSJ poles
T.I.Fitting welding with clamps
Miscellaneous Works.
Releasing of grills from RCC Poles
Releasing of HTS wire from PSC poles
Providing LT bus bar arrangement in DT structure loc.
Erection of New 10' Earth pipe replacing the corroded earth pipe and renewal of earthing including burying looping and binding.
Tree cutting works
Cutting of coconut leaves (per tree)
Clearing of branches of trees
General
Set right the leaning of poles (All size of poles)
Engaging of JCB/ Crane for first 2 Hrs
Engaging of JCB/ Crane For every additional Hrs
Structure Erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
(Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .