| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹41.6 L+₹38,711.05 (0.94%)Admitted-Finance NO 6 A ANNASANDRAPALYA NEAR BIG MASJID BUILDING HAL VIMANAPURA POST BANGALORE 560017 | BENGALURU URBAN | KARNATAKA | 560017 | L2 | Admitted-Finance | |
| 3 | L3₹42.0 L+₹75,363.65 (1.83%)Admitted-Finance NO 237 7TH MAIN 3 D STAGE PILLANA GARDEN BANGALORE 560045 | BENGALURU URBAN | KARNATAKA | 560045 | L3 | Admitted-Finance | |
| 4 | L4₹43.4 L+₹2.2 L (5.36%)Admitted-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L4 | Admitted-Finance | |
| 5 | L5₹43.5 L+₹2.3 L (5.65%)Admitted-Finance NO 631 2 1ST FLOOR HAL ROAD VIBHUTIPURA NEAR JAMIAL MOSQUE BANGALORE 560 017 | BENGALURU URBAN | KARNATAKA | 560017 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ShaikPyarejanandsons L2 | RK Builders L3 | M.A.R. Construction and Co L6 | B AND H CONSTRUCTIONS L7 | M.Z.BUILDERS L5 | VACON INFRASTRUCTURES L1 | VP DEVELOPERS AND CONTRACTOR L4 | M Mohan Babu L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation n.exc 30 cm deep and averaging 15 cm deep and getting out in Soft/loose soil complete all as specified and directed | 53 | Sqm | 80 ₹4,240 | 150 ₹7,950 | 95 ₹5,035 | 99 ₹5,247 | 560 ₹29,680 | 55 ₹2,915 | 50 ₹2,650 Lowest | 150 ₹7,950 |
| 2.00 | Excavation in trenches in any type of soil n.exc 1.5m wide and n.exc 1.5m depth in foundations etc for manholes, sewage line, laying electric cables and and getting out complete all as specifed and directed. | 129.55 | Cum | 450 ₹58,297.5 | 600 ₹77,730 | 485 ₹62,831.75 | 490 ₹63,479.5 | 500 ₹64,775 | 400 ₹51,820 Lowest | 400 ₹51,820 Lowest | 650 ₹84,207.5 |
| 3.00 | Excavation over areas n.exc. 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc., and and getting out in hard /dense soil complete all as specified and directed. | 111.66 | Cum | 500 ₹55,830 | 600 ₹66,996 | 500 ₹55,830 | 504 ₹56,276.64 | 450 ₹50,247 Lowest | 500 ₹55,830 | 500 ₹55,830 | 520 ₹58,063.2 |
| 4.00 | Excavation over areas exc. 1.5 mtr but n.exc. 3.00 mtr in in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc., and getting out in hard /dense soil complete all as specified and directed. | 65.95 | Cum | 550 ₹36,272.5 | 700 ₹46,165 | 555 ₹36,602.25 | 555 ₹36,602.25 | 450 ₹29,677.5 Lowest | 600 ₹39,570 | 620 ₹40,889 | 570 ₹37,591.5 |
| 5.00 | Excavation in post holes each n. exc. 0.50Cum, getting out in soft/loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers n. exc. 25cm, watering and removing surplus soil to a distance n. exc. 50m and making good surface. | 4 | Each | 500 ₹2,000 | 450 ₹1,800 Lowest | 725 ₹2,900 | 709 ₹2,836 | 600 ₹2,400 | 800 ₹3,200 | 500 ₹2,000 | 750 ₹3,000 |
| 6.00 | M&L for PCC 1:4:8 type D2 (40mm graded stone aggregate) as in foundation filling and mass concrete complete all as specifed and directed. | 11 | Cum | 4,000 ₹44,000 | 5,500 ₹60,500 | 4,500 ₹49,500 | 4,500 ₹49,500 | 4,000 ₹44,000 | 6,000 ₹66,000 | 3,980 ₹43,780 Lowest | 4,450 ₹48,950 |
| 7.00 | M&L for PCC 1:3:6 type C2 using 40mm graded stone aggregate as in fdn filling and mass concrete complete all as specified and directed. | 1 | Cum | 4,500 ₹4,500 | 6,000 ₹6,000 | 4,700 ₹4,700 | 4,500 ₹4,500 | 3,500 ₹3,500 Lowest | 6,000 ₹6,000 | 3,980 ₹3,980 | 4,500 ₹4,500 |
| 8.00 | M&L for hardcore of broken stone or boulders of gauge n.exc 63mm, deposited spread, and levelled in layers n.exc 15cm thick, watered and rammed to a true surface complete all as specified and directed. | 6 | Cum | 2,000 ₹12,000 | 2,200 ₹13,200 | 2,100 ₹12,600 | 1,909 ₹11,454 Lowest | 2,000 ₹12,000 | 2,000 ₹12,000 | 2,300 ₹13,800 | 2,000 ₹12,000 |
| 9.00 | M&L for 75 mm thick PCC type D2 1:4:8 (40 mm graded stone aggr) in sub base or sub floor etc complete all as specified and directed. | 21 | Sqm | 310 ₹6,510 | 380 ₹7,980 | 350 ₹7,350 | 340 ₹7,140 | 280 ₹5,880 | 200 ₹4,200 Lowest | 300 ₹6,300 | 350 ₹7,350 |
| 10.00 | M&L PCC 1:3:6 type C2 75 mm thick (using 40mm graded aggregate) as in Plinth protection finshed the concrete surface even and smooth W/O using extra cement complete. | 22 | Sqm | 350 ₹7,700 | 420 ₹9,240 | 400 ₹8,800 | 370 ₹8,140 | 310 ₹6,820 | 400 ₹8,800 | 300 ₹6,600 Lowest | 380 ₹8,360 |
Tender Value
₹38.6 L
EMD Value
₹77,500
Closing Date
31 Aug 2026, 6:00 pmClosed
GE (Central) Bangalore
GE (CENTRAL) BANGALORE AGRAM POST BANGALORE KARNATAKA-560007
SPL REP TO BLDG NO P-27 (SQUASH COURT) SPL REP TO COMPOUND WALL NEAR ET BLOCK (01 TO 05) OF AOM AREA PROVN OF TOILET BLOCK AT NANJANGUD AND PROVN OF ARTIFICIAL RECHARGE FOR RWH WITH MICRO BOREWELL AT ASC CENTRE (NORTH) UNDER GE (CENTRAL) BANGALORE
2026_MES_776813_2
8632E
Open Tender
Civil Works - Others
Item Rate
180 days
ASC CENTRE AND COLLEGE BANGALORE
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CENTRAL BANGALORE
₹77,500
Yes
4 Sept 2026
14 Aug 2026
3 Sept 2026
14 Aug 2026
31 Aug 2026
25 Aug 2026
17 Aug 2026 - 25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation n.exc 30 cm deep and averaging 15 cm deep and getting out in Soft/loose soil complete all as specified and directed | 53 | Sqm | 100 | ₹5,300 |
| 2 | Excavation in trenches in any type of soil n.exc 1.5m wide and n.exc 1.5m depth in foundations etc for manholes, sewage line, laying electric cables and and getting out complete all as specifed and directed. | 129.55 | Cum | 100 | ₹12,955 |
| 3 | Excavation over areas n.exc. 1.5 mtr in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc., and and getting out in hard /dense soil complete all as specified and directed. | 111.66 | Cum | 10 | ₹1,116.6 |
| 4 | Excavation over areas exc. 1.5 mtr but n.exc. 3.00 mtr in in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc., and getting out in hard /dense soil complete all as specified and directed. | 65.95 | Cum | 10 | ₹659.5 |
| 5 | Excavation in post holes each n. exc. 0.50Cum, getting out in soft/loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers n. exc. 25cm, watering and removing surplus soil to a distance n. exc. 50m and making good surface. | 4 | Each | 10 | ₹40 |
| 6 | M&L for PCC 1:4:8 type D2 (40mm graded stone aggregate) as in foundation filling and mass concrete complete all as specifed and directed. | 11 | Cum | 10 | ₹110 |
| 7 | M&L for PCC 1:3:6 type C2 using 40mm graded stone aggregate as in fdn filling and mass concrete complete all as specified and directed. | 1 | Cum | 10 | ₹10 |
| 8 | M&L for hardcore of broken stone or boulders of gauge n.exc 63mm, deposited spread, and levelled in layers n.exc 15cm thick, watered and rammed to a true surface complete all as specified and directed. | 6 | Cum | 10 | ₹60 |
| 9 | M&L for 75 mm thick PCC type D2 1:4:8 (40 mm graded stone aggr) in sub base or sub floor etc complete all as specified and directed. | 21 | Sqm | 10 | ₹210 |
| 10 | M&L PCC 1:3:6 type C2 75 mm thick (using 40mm graded aggregate) as in Plinth protection finshed the concrete surface even and smooth W/O using extra cement complete. | 22 | Sqm | 100 | ₹2,200 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_879203.xls
BOQ • 0.95 MB
Tender8632.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .