Tender Value
₹62 L
EMD Value
₹62,000
Closing Date
14 Jul 2023, 3:00 pmClosed
commissioner, cumbum municipality
commissioner, cumbum municipality
Improvement Cement Concrete Road at Kombai Main East 5th Cross Road-122001R005, Thathappankulam 18th street 1st Cross-122011R187, Egaluthu Road 1st Cross-122027R490, and BT Road at Thathappan Kulam 13th Lane 4th Cross Street-122011R155, Ambethkar S
2023_MAWS_335668_1
1477/2023/E1
Open Tender
Civil Works - Roads
Item Rate
120 days
cumbum municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹62,000
Yes
cumbum municipality
19 Jul 2023
5 Jul 2023
14 Jul 2023
5 Jul 2023
14 Jul 2023
5 Jul 2023
7 Jul 2023
Amount
Providing centering for sides and soffits of R.C.C.works such as lintels, slab with beams plain surface etc., complete including shuttering upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification. (for Drain & Culvert)
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below metal with 45.27 kgs bituminous 60/70 and 5.03kg of plastic waste (Total 50.30kg) bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Provision For GST 18%
R SABEER ALI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .