| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.6 LAccepted-AOC | ₹45.6 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹46.2 LRejected-AOC NO 60 PILLAYAR KOVIL STREET THONDANTHULAS VILLAGE POST KATPADI TALUK VELLORE DISTRICT 632202 | VELLORE | VELLORE | TAMIL NADU | 632202 | ₹46.2 L | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | K.Suresh L2 | S.BABU L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Strengthening of the Two Roads in Kaniyambadi Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27 | |||||
| 2.00Strengthening the Road From Central Jail Amirthi Road to Vadakku Kottamedu in Sholavaram Panchayat Km 0/0 - 0/940, Kaniyambadi Block R-48 | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 676.8 | sqm | 6.44 ₹4,358.59 | 6.36 ₹4,304.45 |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete | 939.06 | sqm | 23.65 ₹22,208.77 | 23.36 ₹21,936.44 |
| 5.00 | Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 148.05 | cum | 149.06 ₹22,068.33 | 147.19 ₹21,791.48 |
| 6.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 253.8 | cum | 142.21 ₹36,092.90 | 140.42 ₹35,638.60 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 423 | cum | 2,462.84 ₹10.4 L | 2,431.94 ₹10.3 L |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 2,820 | sqm | 87.57 ₹2.5 L | 86.47 ₹2.4 L |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 2,820 | sqm | 20.48 ₹57,753.60 | 20.23 ₹57,048.60 |
| 10.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 70 | cum | 11,617.01 ₹8.1 L | 11,471.3 ₹8.0 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Mar 2026, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA VELLORE
THE PROJECT DIRECTOR DRDA VELLORE
Vellore District Strengthening of the Two Roads in Kaniyambadi Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27
2026_RDTN_662208_1
A7/6191/2024
Open Tender
Civil Works
180 days
DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹50,000
VELLORE DRDA
23 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
23 Feb 2026
Vellore District Strengthening of the Two Roads in Kaniyambadi Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27
Strengthening the Road From Central Jail Amirthi Road to Vadakku Kottamedu in Sholavaram Panchayat Km 0/0 - 0/940, Kaniyambadi Block R-48
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Metal Crash Barriers
Providing and fixing sign board
Provision for H.M. stone
Strengthening the Road From Chinna Palampakkam to BG Road in Palampakkam Panchayat Km 0/0 - 0/520, Kaniyambadi Block R-102
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Metal Crash Barriers
Providing and fixing sign board
Provision for H.M. stone
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.74 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_794988.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid