| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 143 SHASTRI NAGAR LAKHIMPUR KHERI | KHERI | UTTAR PRADESH | 261501 | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
12 Dec 2025, 1:00 pmClosed
SE EDC-I
Near Kali Mandir, Mathura Cantt, Mathura
The Work of Construction HT/LT Line and Double Pole and Other Work at Various Places Under Deposit Scheme in the jurisdiction of E.D.D.-Goverdhan, Mathura
2025_DVVNL_1094608_1
65/EDC-I(M)/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dvvnl Agra
₹10,000
29 Dec 2025
28 Nov 2025
12 Dec 2025
28 Nov 2025
12 Dec 2025
28 Nov 2025
Carriage of 11 KV XLPE Cable size 3x70 sq.mm. Cable form Store Center Mathura/Other Sites in District Mathura with Laying as per direction by supervising engineer.
Carriage of Earth Rod from Store Center Mathura/Other Sites in District Mathura to Site of Work and fixing earthing rod and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Carriage and Laying, sagging stringing and binding of ACSR Weasel/Dog/Rabbit/Raccon Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Carriage and Laying, sagging stringing and binding of Arial Bunch Conductor 1x16+1x25/3x50/95/120 sqmm on the erected PCC pole/STP including jumpering and making connections in all respects as per RESPO manual.
The contractor shall provide F clamps, D/P clamps, stay clapms, cross arm clamps, LT clamps, ABC clamps, suspension clamps, piercing connectors, I-hooks, dead end clamps, any other clamps, nut & bolts and shackle insulators without charging any extra cost, in case the same are not available in the stores. Contractor shall also provide/perform any contingent material/work at his own cost, which is not included in the boq/estimates but is required for execution/completion of the work. Further, any fabrication work, if required, shall also be carried out by the contractor at his own cost, for which no additional payment shall be admissible.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
65.rar
Tender Documents • 0.07 MB
BOQ_2012916.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .