| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC COLLEGE ROAD CHABUA PO CHABUA DIST DIBRUGARH ASSAM 786184 | DIBRUGARH | ASSAM | 786184 | L1 | Accepted-AOC accepted | |
| 2 | L2₹7.5 L+₹2.5 L (49.7%)Rejected-Finance | L2 | Rejected-Finance Rate quoted is higher side. | |
| 3 | L3₹7.5 L+₹2.5 L (50.7%)Rejected-Finance | L3 | Rejected-Finance Rate quoted is higher side. | |
| 4 | L4₹7.6 L+₹2.6 L (51.7%)Rejected-Finance | L4 | Rejected-Finance Rate quoted is higher side. |
Tender Value
₹4.3 L
Closing Date
14 Sept 2021, 6:00 pmClosed
GE (AF) CHABUA
GE (AF) CHABUA, POST-CHABUA AIR FIELD, DIST-DIBRUGARH, ASSAM-786102
Repairing/Overhauling to 33/11 KVA Transformer of 2.5 MVA capacity at 14 wing AF Chabua under GE (AF) Chbaua
2021_MES_469004_2
3003/07/E3
Limited
Civil Works
Works
30 days
GE (AF) CHABUA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
4 Oct 2021
6 Sept 2021
16 Sept 2021
6 Sept 2021
14 Sept 2021
7 Sept 2021
Amount
M&L for disconnecting carefully electrical connection from both HT/ LT (primary & secondary) sides of the transformer, keeping them at safe side and taking out the transformer outdoor type of capacity 2.5 MVA, 33 KV/ 11 KV, step down for carrying out complete overhauling which shall comprise of the following:- (a) M&L for lifting, transporting, handling, the transformer to workshop and opening top cover of the transformer by unscrewing nuts, bolts, washers etc. including disconnecting core assembly from 33KV/11KV side bushing and lifting the same gently and taking out from the shell (container/ body) of the transformer. (b) M&L for draining out transformer oil from the above said transformer in the suitable capacity of container /drums and keeping it in safe custody for reuse. (c) M&L for cleaning the transformer body from inside, removing deposited dirt/ sludge/ foreign particles etc. from the bottom/ body of the transformer and drying up the shell from inside before refilling of the transformer oil. (d) M&L for cleaning and washing thoroughly core and windings of the transformer by hosing down with clean dry oil conforming to IS 335/1983, removing deposited dirt/sludge/foreign particles from the windings/ core, thorough inspection of windings, providing insulations to leads and terminals, heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as directed by Engr-in- charge. (e) Lifting and refixing core assembly after rewinding of primary & secondary copper coil inside the transformer shell gently and carefully, connecting primary/ secondary/ Neutral connections to the bushings assembly, fixing of tap change over including tightening of nuts, bolts, washers of the core to reduce humming noise all as directed. (f) Refilling the filtered transformer oil in the shell of transformer and supply and topping up of new transformer oil with di-electric strength not less than 60 KV in to the conservator tank/ body tank of the transformer complete all as directed by the Engineer-in-Charge.
(g) Refixing the top cover including replacement of cork sheet/ gasket 8mm thick, tightening of nuts/ bolts/ washers etc. and replacement of breather with silica gel crystal type all as directed by Engr-in charge (h) Lifting/ shifting to the place from where removed or to any location as directed and re-installing the transformer including connecting primary/ secondary/ neutral connections etc. all as directed by Engr-in-Charge. (j) The inspection of transformer shall involve:- (i) Checking of all clamps, nuts, bolts including core bolts & cover fixing bolts. (ii) Checking all brazings, joints, tap heads and connection joints. (iii) Checking all jumpers, terminations/ connections inside the transformer. (iv) Checking the Buchholtz relay/ conservator MOG if any. (v) Painting of transformer complete with two coats of synthetic enamel paint externally transformer shell complete all as directed by Engr-in-Charge. (vi) Inspection of tap changer, checking the moving and fixed contacts for contact wear and connection to winding. (k) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record. (Qty - 01 Each Job)
M&L for rewinding of power transformer of capacity 2.5 MVA by winding the defective coils ( primary & seconadary) with new 33 KV & 11 KV copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as directed. (Qty - 01 Each Job)
M&L for re-insulating windings of power transformer of capacity 2.5 MVA by strip opening of coils (i.e. Primary/ secondary coils) from core assembly safely, unwinding the coils (i.e. Primary/ secondary coils) complete, removing the old defective insulation paper and replacing with new DPC insulation to the copper conductor, re-varnishing of the windings with super varnish including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 and as directed by Engr-in- charge. (Qty - 01 Each Job)
Note:- (a) Old u/s retrieved material will be the property of the repairer/bidders. The bidders has quoted the job order considering the cost of retrieved material Rs. 78120. Except retrived used transformer oil. The used transformer oil is the property of dept as ref ser No. 1 (b)
Note:- (b) (i) Any damage to insulators/bushes/windings etc. while in the custody of the contractor shall be made good at no extra cost to department. The serviceability of the transformer shall be be checked and confirmed by the contracor before taking in to his custody. (ii) M&L for rewinding/re-insulation of (primary/secondary) coils, bushes, studs, transformer oil, cable box, replacement of buchholtz relay if any etc will be measured and paid separately. (iii) After complete repair/ re-assembling the transformer, transpotation from contractor site to the site of transformer (GE (AF) Chabua) for re-installing checking, testing complete all as directed.
AAHANA ENTERPRISES
CARD HOUSE
D S ENGINEERING ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .