Loading…
Loading…
Tender Value
₹30.3 L
EMD Value
₹60,560
Closing Date
13 Jul 2026, 11:00 am5d left
Nidhi bhardwaj
Horticulture Panchkula
Development of Green Belt along GT Road in Sec-5, Karnal (Providing and fixing of Grill Fencing on brick toe Wall , Main gate , wicket gate with three year mtc and defect liability period free of cost and all other works contingent thereto.)Pocket-II
2026_HBC_533922_1
20261149CD49 D4B0 4237 95FE E4F7AA79A0A5263HSV
Open Tender
Civil Works
120 days
Karnal
2 documents required · 2 mandatory
₹2,000
Yes
₹60,560
Yes
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.1]Cement Concrete 1:8:16 Flooring 1. Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. [Through Rate] | 42 | cum | 1,727 | ₹72,534 |
| 2 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate] | 1,050 | Sqm | 79 | ₹82,950 |
| 3 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 1,050 | Sqm | 138 | ₹1,44,900 |
| 4 | [11.63]Distempering with dry distemper of approved brand and manufacture (two or more coats) of required shade on new work, over and including water thinnable priming coat to give an even shade. [Through Rate] | 2,100 | Sqm | 29 | ₹60,900 |
| 5 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] | 680 | Sqm | 31 | ₹21,080 |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 10,500 | Kg. | 83 | ₹8,71,500 |
| 7 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum [Through rate] | 9 | Per day | 6,493 | ₹58,437 |
| 8 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 210 | cum | 78 | ₹16,380 |
| 9 | [6.14.2]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 9.94 | cum | 3,875 | ₹38,517.5 |
| 10 | [6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate] | 43.2 | Sqm | 261 | ₹11,275.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_613000.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid