| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L Quoted ₹9.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.4 LRejected-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | THIRUVALLUR | TAMIL NADU | 600019 | ₹9.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MOHAN AGENCIES L1 | KR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | MS. Plate 3.15mm thick, including loading, transportation & unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works) | 0.5 | Ton | 85,449 ₹42,724.50 | 87,965.85 ₹43,982.93 |
| 2.00 | Metallic expansion joints Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet. | 3 | Nos | 67,199 ₹2.0 L | 69,259.05 ₹2.1 L |
| 3.00 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP inlet area. Including consumables and T&P’s. | 80 | M2 | 225 ₹18,000 | 232.05 ₹18,564 |
| 4.00 | Charges for cutting and removal of heavily eroded duct plates (multilayer) in duct parent plate area,transporting & devoluting scrap to central stores/NCTPS-I. Including consumables and T&P’s. | 25 | M2 | 1,919 ₹47,975 | 1,985.55 ₹49,638.75 |
| 5.10 | Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet - 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 3 Nos x 20.65M = 61.92M.
Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding. Including cost of consumables and T&P's. | 61.92 | M | 1,819 ₹1.1 L | 1,898.4 ₹1.2 L |
| 5.20 | Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. | 61.92 | M | 5,500 ₹3.4 L | 5,689.95 ₹3.5 L |
| 6.00 | Labour charges for welding eroded initial welding joints in the flue gas duct portion and splitter plate area from ESP Inlet. Including cost of consumables and T&P's. | 70 | M2 | 297 ₹20,790 | 307.65 ₹21,535.50 |
| 7.00 | Transporting of 6mm MS / Checkered plates, cutting into required size, leading, lifting, positioning on the eroded top portionsof the duct wall after removal of wornout patch plates above 1.5-meter level and welding the same from flue gas duct portion and splitter plate area from ESP outlet. Including cost of consumables and T&Ps. | 35 | M2 | 3,539 ₹1.2 L | 3,654 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
7 Jan 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III ESP Outlet A B Pass Patch up welding work for damaged flue gas duct portion from ESP outlet to before ID fan inlet during annual overhaul for the year 2025 26
2026_EB_638870_1
CE SE MI NCTPS I 281 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,600
Yes
27 Feb 2026
3 Jan 2026
8 Jan 2026
3 Jan 2026
7 Jan 2026
3 Jan 2026
MS. Plate 3.15mm thick, including loading, transportation & unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works)
Metallic expansion joints Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet.
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from ESP inlet area. Including consumables and T&P’s.
Charges for cutting and removal of heavily eroded duct plates (multilayer) in duct parent plate area,transporting & devoluting scrap to central stores/NCTPS-I. Including consumables and T&P’s.
Renewal of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. Size- 2696 X 2467 X 272 mm, Style#02, Full size, Location-ESP inlet - 8Nos; (5.163 x 2 side x 2 No) = 20.65M required qty = 3 Nos x 20.65M = 61.92M. Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding. Including cost of consumables and T&P's.
Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and downstream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Labour charges for welding eroded initial welding joints in the flue gas duct portion and splitter plate area from ESP Inlet. Including cost of consumables and T&P's.
Transporting of 6mm MS / Checkered plates, cutting into required size, leading, lifting, positioning on the eroded top portionsof the duct wall after removal of wornout patch plates above 1.5-meter level and welding the same from flue gas duct portion and splitter plate area from ESP outlet. Including cost of consumables and T&Ps.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_764584.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid