Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
13 Oct 2026, 2:00 pm
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM UNIT II Boiler pressure parts AOH 2026 Rectification of buck stay beam and supports renewal of worn out buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and Rectification of critical pipe line of CRH etc
2026_EB_709213_1
CE / MTPS-I / SE / M-I / BM /OT. 108 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹8,000
Yes
29 Sept 2026
29 Sept 2026
14 Oct 2026
29 Sept 2026
13 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Rectification of buck stay beams & supports by bringing to the original position, providing suitable locking pin and washer etc. and welding the scalloped bar, locking pin and washer and providing channels etc. Charges inclusive of cost of scaffolding | 12 | Nos. | - | - |
| 2 | Charges for fabrication of 900mm length x 600 mm width square shaped Buck stay corner cover plate using 3 mm MS sheet by cutting, bending and welding and painting with 1 coat of heat resisting Aluminium paint. | 8 | Nos. | - | - |
| 3 | Charges for cutting and replacing of defective/ buckled end plate in the rear side of LTSH upper bank area in boiler II pass which is provided to protect the end coil erosion by cutting the M.S. plate to required size and providing stiffener plates to equal distance | 1 | Time | - | - |
| 4 | Charges for providing new M.S. plates in the middle side of boiler headers such as rear side, left side and right side headers in Boiler II pass to protect header erosion | 1 | Time | - | - |
| 5 | Petty iron work for truss, straps etc., (wrought & fixed) labour only | 1,000 | Kg | - | - |
| 6 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 1 | Time | - | - |
| 7 | Rectification of broken out DVH hanger support in CRH right steam pipe line Release the load of CRH pipeline from the failed DVH type hanger support remove the hanger support from the location. | 5 | Nos. | - | - |
| 8 | Repair the failed hanger supporting hook by welding disassemble the hanger support clean and inspect the parts, replace the defective parts if any | 5 | Nos. | - | - |
| 9 | Assemble the hanger support and refit in the location | 5 | Nos. | - | - |
| 10 | load the hanger support to its specified load | 5 | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_852251.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .