| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L1 | Accepted-AOC APPROVED IN TENDER COMMITTEE |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
7 Mar 2024, 2:00 pmClosed
SUPERINTENDING ENGINEER
131 , 132, ETTAYAPURAM ROAD, TUTICORIN
Execution of works for replacement of all Gaskets in Top cover, OLTC, all inspection covers, Turret CTs and Radiators of 1X10 MVA, 110/33-11 KV (Adopted at 110/11 KV) Power Transformer in 110/33-11 KV Arumuganeri Grid SS in TEDC / Tuticorin
2024_EB_430863_1
SE/TEDC/TTN/OT-WC-006/2023-24 DT.24.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
TUTICORIN
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹4,000
Yes
8 Jan 2025
26 Feb 2024
8 Mar 2024
26 Feb 2024
7 Mar 2024
26 Feb 2024
26 Feb 2024 - 7 Mar 2024
Amount
Supply of Materials
Supply and Termination of Cable Core including the Cost of Strips etc., as per Drawing directed by the Fied Engineer, for Tank Wiring of 10 MVA Transformer at Arumuganeri SS
Supply and Glanding of all the Control Cable in transformer to DM Box, M.Box, etc., including removing of insulation of the Control Cable and providing suitabale removing ofiInsulation of the Control Cable and providing suitable holes in the pletes as directed by the Field Engineer.
25mm Cable gland
22mm Cable gland
19mm Cable gland
Supply of fasteners (Bolt, Nut, Washers) for Various Sizes, including all VAT, Taxes etc., as reqiured during erection
Supply & Renewal of View glass, Rubber feedings of Marshalling Box & D.M Box doors if necessary freight (Appx 2 Doors Per Transformer)
Labour
Labour Charges for loading, transporting, unloading of 40-45 Gallen Capacity of empty Barrels from the Store to the Site at Arumuganeri SS (14600/200=73 Nos.)
Labour Charges for draining of Transformer Oil from the Transformer into the Empty Barrels for attending the Repair works etc., at Arumuganeri SS =14600 Ltrs.
Labour Charges for dismantling of 10 MVA, Power Transformer HV, LV Bushings, Radiators, Conservator Tank and Other accessories including all Lead, Lift, T & Ps, Crane Charges etc., complete at Arumuganeri SS.
Labour Charges for dismatling and replacement of Top Cover Gaskets, OLTC gaskets, Radiator, Butterfly Valve Inner Gaskets and all other Gaskets (which are normally not covered under dismanling and re-erection) and refitting of top cover and OLTC Cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70 C grade and governed by IS 4253 to be supplied by Contractor at Arumuganeri SS 16 MVA Transformer
Labour Charges for overhauling of Power /Auto Transformer OLTC Mechanism including Cleaning and Replacing of defective Spares and Gaskets etc., as directed by the field Engineer complete at Arumuganeri SS.
Labour Charges erection of 10 MVA Power Transformer's HV, LV Bushings, Radiators, Conservator tank, Other accessories including Top Cover, Side Inspection Covers, Turrets and including minor welding works wherever necessary, minor transport of transformer accessories, tools etc., complete including the Cost of Sundry items such as soap, Cotton waste, enemel paint, Kerosene in all respect, all Lead, Lift, T&Ps, Crane Charges etc., complete after renewal of all Gaskets at Arumuganeri SS.
Labour Charges for applying Vacuum in the Power Transformer including Labour and Vacuum kit etc., at SS. Filling of Nitrogen up to required Pressure for transporting purpose as directed by the Field Engineer. (N2 Gas to be supplied by Contractor).
Labour Charges for filling of the transformer oil from Oil Barrel to Main tank of the transformer after dismantling all accessories from the transformer main tank at Arumuganeri SS =14600 Ltrs.
Labour Charges for renewal of Diaphram of Vent including Netted Metal Mesh including Cost of Materials at Arumuganeri SS.
Labour Charges for Hot Oil Circulation of transformer oil in the Tranformer and OLTC for 72 Hrs. or necessary to achive the required level and Circulation of Oil till statisfactory results are obtained before commissioning at Arumuganeri SS
Upto 5000 Ltrs.
Above 5000 Ltrs.
Labour Charges for Minor Fabrication, Welding, drilling, Cutting, renewal of earthing etc., at Site.
Labour Charges for Spray painting of Power Transformer and accessories including cost of enamel colour paint for Valve Marking waste, Kerosine, Soap etc., complete up to but including the Cost of Paint.
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .