| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.4 LAccepted-AOC | 1 | Accepted-AOC Accepted - Finance | |
| 2 | 2₹12.0 L+₹61,362.88 (5.38%)Rejected-Finance | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | B.BALAMURUGAN L1 | A DHANDAPANI L2 |
|---|---|---|---|---|---|
| 1.00Name of Work :Strengthening the road from Gandhinagar Mettuppalayam main road to Sivasakthi Rice mill (via) SRT Coach road H/o Konamoolai | |||||
| 2.00 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 490 | Sqm | 23.36 ₹11,446.4 Lowest | 26 ₹12,740 |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 19 | Cum | 581.07 ₹11,040.33 Lowest | 600 ₹11,400 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 147 | Cum | 2,446.13 ₹3,59,581.11 Lowest | 2,600 ₹3,82,200 |
| 5.00 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,470 | Sqm | 86.04 ₹1,26,478.8 Lowest | 90 ₹1,32,300 |
| 6.00 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,470 | Sqm | 20.07 ₹29,502.9 Lowest | 25 ₹36,750 |
| 7.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 36.75 | cum | 11,614.64 ₹4,26,838.02 Lowest | 12,000 ₹4,41,000 |
| 8.00 | Provision for Name board charges | 1 | No | 1,000 ₹1,000 Lowest | 1,500 ₹1,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,73,859.76 ₹1,73,859.76 Lowest | 1,83,220.2 ₹1,83,220.2 |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development Officer(V.P.), Sathyamangalam 63
Block Development Officer(V.P.), Sathyamangalam 638401
Strengthening the road from Gandhinagar Mettuppalayam main road to Sivasakthi Rice mill (via) SRT Coach road H/o Konamoolai
2026_RDTN_662114_7
Roc No.410/2026/B1 Dated.16.02.2026
Open Tender
Civil Works - Roads
Item Rate
90 days
Block Development Officer(V.P.), Sathyamangalam 63
Strengthening the road from Gandhinagar Mettuppalayam main road to Sivasakthi Rice mill (via) SRT Coach road H/o Konamoolai
2 documents required · 2 mandatory
₹0
₹23,000
Yes
4 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_794856.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_794856.xls
BOQ • 0.28 MB
techbidKonamoolai.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .