Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 QUOTED LESS THEN TENDER VALUE | |
| 2 | L2₹4.3 L+₹46,915.33 (12.1%)Rejected-AOC | L2 | Rejected-AOC L2 QUOTED GREATER THEN TENDER VALUE | |
| 3 | L3₹4.5 L+₹61,223.32 (15.8%)Rejected-AOC | L3 | Rejected-AOC L3 QUOTED GREATER THEN TENDER VALUE | |
| 4 | L4₹4.8 L+₹95,811.67 (24.7%)Rejected-AOC | L4 | Rejected-AOC L4 QUOTED GREATER THEN TENDER VALUE | |
| 5 | L5₹5.0 L+₹1.1 L (28.4%)Rejected-AOC | L5 | Rejected-AOC L5 QUOTED GREATER THEN TENDER VALUE |
| Sl No | Description | Qty | Unit | P.Raveendrakumar L4 | S GOKULALAKSHMI L5 | V Manoharan L3 | Ohm Muruga Constructions L2 | Kumar R L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Tirupathur District -Construction of CC Pavement Near Murugan Koil at Thottikuttai in Marimanikuppam panchayat. at Alangayam Block SFC (DP)-2026-27 | ||||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 11.16 | Cum | 118 ₹1,316.88 | 138 ₹1,540.08 | 150.9 ₹1,684.04 | 153.9 ₹1,717.52 | 100.9 ₹1,126.04 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 29.2 | Cum | 5,878 ₹1,71,637.6 | 5,930 ₹1,73,156 | 4,395.9 ₹1,28,360.28 | 4,295.9 ₹1,25,440.28 Lowest | 4,371.9 ₹1,27,659.48 |
| 4.00 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 85.56 | Sqm | 234 ₹20,021.04 | 284 ₹24,299.04 | 300.9 ₹25,745 | 210.9 ₹18,044.6 | 108 ₹9,240.48 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 30.77 | Cum | 7,045 ₹2,16,774.65 | 7,241 ₹2,22,805.57 | 7,300.9 ₹2,24,648.69 | 7,250.9 ₹2,23,110.19 | 6,192 ₹1,90,527.84 Lowest |
| 6.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount ( in Rupees) | 73,755.03 ₹73,755.03 | 75,924.12 ₹75,924.12 | 68,478.84 ₹68,478.84 | 66,296.27 ₹66,296.27 | 59,139.69 ₹59,139.69 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
15 Sept 2026, 3:00 pmClosed
The Block Development officer (BP) Alangayam
The Block Development officer (BP) Alangayam
Tirupathur District -Construction of CC Pavement Near Murugan Koil at Thottikuttai in Marimanikuppam panchayat at Alangayam Block SFC (DP)-2026-27- Package - 01
2026_RDTN_697299_1
A3/1779/2026
Open Tender
Civil Works
Item Rate
180 days
Alangayam Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
7 Oct 2026
24 Aug 2026
15 Sept 2026
24 Aug 2026
15 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Tirupathur District -Construction of CC Pavement Near Murugan Koil at Thottikuttai in Marimanikuppam panchayat. at Alangayam Block SFC (DP)-2026-27 | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 11.16 | Cum | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyence of all materials and labour charges etc. completed | 29.2 | Cum | - | - |
| 4 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 85.56 | Sqm | - | - |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 30.77 | Cum | - | - |
| 6 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount ( in Rupees) | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_838285.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .