| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.4 LAccepted-AOC | ₹66.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹87.4 LRejected-Finance H NO DG 644 WARD NO 15 ADARSH COLONY PALWAL 121102 | PALWAL | PALWAL | HARYANA | 121102 | ₹87.4 L | L2 | Rejected-Finance Reject due to higher rate quoted |
| 3 | L3₹95.6 LRejected-Finance NEAR BALA SCHOOL MOHALLA CHOUTHIYA KONDAL HATHIN DISTT PALWAL 121103 | HATHIN | PALWAL | HARYANA | 121103 | ₹95.6 L | L3 | Rejected-Finance Reject due to higher rate quoted |
| 4 | L4₹1.0 CrRejected-Finance | ₹1.0 Cr | L4 | Rejected-Finance Reject due to higher rate quoted |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-As per Notification 480-C-7-2025/4728 dated 27.06.2025 work upto One Crore is reserved for Cooperative Labour and Construction Societies. Therefore agency is not considered for Technical Evaluation |
| Sl No | Description | Qty | Unit | THE DAYA COOP L AND C SOCIETY LTD L2 | THE SACHIN COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L3 | THE BHUSHAN COOP L&C SOCIETY LTD L4 | THE PARI COOP L&C SOCIETY LTD L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage | 4,447.43 | cum | 650 ₹28.9 L | 800 ₹35.6 L | 900 ₹40.0 L | 390 ₹17.3 L |
Tender Value
₹71.2 L
EMD Value
₹1.4 L
Closing Date
22 Dec 2025, 11:00 amClosed
MANOJ KUMAR
Municipal Council Palwal
Construction fo boundary wall, track with earth filling and Park with earth filling of Deen Dayal Upadhyay Community Center Ward No.10 MC Palwal
2025_HRY_489380_1
2025B785D697 E1D9 4D1D BDB8 7316D11F9BCB294ULB
Open Tender
Civil Works
365 days
Palwal
2 documents required · 2 mandatory
₹5,000
₹1.4 L
Yes
20 Feb 2026
11 Dec 2025
22 Dec 2025
11 Dec 2025
22 Dec 2025
11 Dec 2025
EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[10.8]Providing and laying of conglomerate floor 40mm thick cement concrete topping 1:2:4 [Through Rate]
[11.8.2]12 mm cement plaster of mix : 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[11.9.2]15 mm cement plaster on rough side of single or half brick wall of mix: 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[11.94.1]Finishing walls with textured exterior paint of required shade : 1. New work (Two or more coats applied @ 3.28 litre/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[15.1.1.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m [Through Rate]
[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate]
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[26.10]Maintenance of fine grass lawn for one year including fertilizer application, DAP @ 20gm/sqm, urea 40gm/sqm, watering, weeding, top dressing with good earth and manure mixture 2:1 @ 0.01cum per sqm, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads. [Through Rate]
[26.2]Supplying and stacking of good quality top layer garden earth free from debris and weeds, at site including royalty and carriage/lead 5 km (good earth measured in stacks will be reduced by 20 % for payment) only for filling of pots and flower beds . 0.00 0.00 0.00 [Through Rate]
[26.34]Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth, mixed with farm-yard manure, supplied at the rate of 1.62 cum per 18 sqm, DAP 0.6kg, Chlorpyriphos 20%EC@ 0.20 litre per 18 sqm and supplying and planting hedge at 30 cm apart in two rows @ 202 no. well trimmed bushy ,multi-branched ,30 cm to 45 cm in height plants to be supplied in 15 cm x 15 cm poly bags per 18 sqm . [Through Rate]
[26.407]Providing and stacking of Phyllanthus emblica (Amla) of height 150-165 cm. in 30 cm HDPE Bag as per direction of the officer-in-charge. [Through Rate]
[26.5]Making lawns with rough grassing including uprooting rank vegetation and weeds by digging area to a depth of 30 cm , removing all weeds and other growth with roots by forking repeatedly, ploughing and dragging with ‘swagha’ breaking of clods, removal of rubbish, dressing and supplying doob grass roots, and planting at 15 cm apart, including supplying and spreading of farm-yard manure at the rate of 0.18 cum per 100 sqm fertilizers etc [Through Rate]
[26.524.12]`Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos. plants as per direction of the officer-in-charge.` 12. "Clarkia hybrid" [Through Rate]
[26.524.18]`Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos. plants as per direction of the officer-in-charge.` 18. "Gerbera hybrid double" [Through Rate]
[26.524.31]`Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos. plants as per direction of the officer-in-charge.` 31. "Verbena hybrid" [Through Rate]
[26.524.6]`Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos. plants as per direction of the officer-in-charge.` 6. "Carnation (double) Dutch" [Through Rate]
[26.524.7]`Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 100 Nos. plants as per direction of the officer-in-charge.` 7. "Carnation (double) Lilliput" [Through Rate]
[34.2.1]Cast in Situ Cement Concrete M 20 Kerb with Channel Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 1. Using Concrete Mixer [Through Rate]
[34.29.1]GI barbed wire fencing 1. G.I Barbed Wire Fencing 1.2 Metre High Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[6.8.2]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 2. 40mm thick [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_567568.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid