Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹10.3 L (10.1%)Admitted-Finance D NO 40 9 94 SAI NAGAR VENNELA HOSPITAL ROAD SAI NAGAR AREA KRISHNA ANDHRA PRADESH 520008 | NTR | ANDHRA PRADESH | 520008 | ₹1.1 Cr+₹10.3 L (10.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DEYS POWER SYSTEMS PVT LTD L1 | INDWELL CONSTRUCTIONS PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00Annual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS, Fire Detection & Protection System, DPPS | |||||
| 1.01 | Mandatory Part Annual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS, Fire Detection & Protection System, DPPS | 12 | Months | 8,22,800 ₹98,73,600 Lowest | 9,01,300 ₹1,08,15,600 |
| 2.00Optional Job: B | |||||
| 2.01 | Cable Laying upto 7-Core x1.5/2.5mm2 | 900 | Mtr | 22 ₹19,800 Lowest | 25 ₹22,500 |
| 2.02 | Cable Jointing upto 7-Core x1.5/2.5mm2 | 80 | Nos | 25 ₹2,000 Lowest | 30 ₹2,400 |
| 2.03 | Cable termination upto 7-Core x1.5/2.5mm2 | 90 | Nos | 25 ₹2,250 Lowest | 30 ₹2,700 |
| 2.04 | Cable Laying upto 8~19-Core x1.5/2.5mm2 | 900 | Mtr | 15 ₹13,500 Lowest | 20 ₹18,000 |
| 2.05 | Cable Jointing upto 8~19-Core x1.5/2.5mm2 | 90 | Nos | 25 ₹2,250 Lowest | 30 ₹2,700 |
| 2.06 | Cable termination upto 8~19-Core x1.5/2.5mm2 | 90 | Nos | 25 ₹2,250 Lowest | 30 ₹2,700 |
| 2.07 | Cable Laying above 19-Core x1.5/2.5mm2 | 200 | Mtr | 15 ₹3,000 Lowest | 20 ₹4,000 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
11 Aug 2021, 12:00 pmClosed
The GM O and M PP
Office of the GM O and M PP
Annual Maintenance Contract of Field Instruments of U7, U8 DPPS including U7 and U8 PWPS, Intake Raw Water System, FAHS, Fire Detection and Protection System, DPPS
2021_DPL_336437_1
WBDPL/PP/T/GM(PP) 95/2021/E/056
Open Tender
Miscellaneous Works
Item Rate
365 days
Office of the GM O and M PP
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
Office of the GM O and M PP
20 Sept 2021
14 Jul 2021
13 Aug 2021
14 Jul 2021
11 Aug 2021
17 Jul 2021
16 Jul 2021
Amount
Annual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS, Fire Detection & Protection System, DPPS
Mandatory Part Annual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS, Fire Detection & Protection System, DPPS
Optional Job: B
Cable Laying upto 7-Core x1.5/2.5mm2
Cable Jointing upto 7-Core x1.5/2.5mm2
Cable termination upto 7-Core x1.5/2.5mm2
Cable Laying upto 8~19-Core x1.5/2.5mm2
Cable Jointing upto 8~19-Core x1.5/2.5mm2
Cable termination upto 8~19-Core x1.5/2.5mm2
Cable Laying above 19-Core x1.5/2.5mm2
Cable Jointing above 19-Core x1.5/2.5mm2
Cable termination above 19-Core x1.5/2.5mm2
Laying of MI cable
Laying of compensating cable upto 4-Pair
Laying of compensating cable 4~ 10-Pair
Laying of compensating cable above 10-Pair
Optical Fibre laying
Optical Fibre Jointing
Optical Fibre Checking by OTDR
Laying of UTP cable
Termination of UTP cable
Crimping of co-axial cable
CS Impulse Pipe 14~21mm laying, painting with support
AS Impulse Pipe 14~21mm laying, painting with support
AS IBR Impulse Pipe 14~21mm laying, painting with support
Low pressure argon welding
IBR argon welding
Replacement of 10~25NB low pressure valve
Replacement of 10~25NB IBR valve
Replacement of IBR condensate pot
Structure work including fabrication & scrap cutting, painting
Installation of Junction Box upto 10-Way
Installation of Junction Box from 12 to 24 Way
Servicing of Control Valve upto Size 50 diaphragm
Refitting / Replacement of Control Valve upto Size-46 diaphragm
Servicing of Control Valve Size-47~60 diaphragm
Refitting / Replacement of Control Valve Size-47~60 diaphragm
Servicing of Control Valve Size-61~76 diaphragm
Refitting/Replacement of Control Valve Size-61~76 diaphragm
Servicing of Control Valve Size-60~65 diaphragm at DM Plant
Replacement of Control Valve Size-60~65 diaphragm at DM Plant
Servicing of double acting control valve
Refitting/Replacement of double acting control valve
Servicing of rotary actuator of bore 2”~4”
Refitting/Replacement of rotary actuator of bore 2”~4”
Servicing of rotary actuator of bore 4.1”~10”
Replacement of rotary actuator of bore 4.1”~10”
Servicing of power cylinder of bore below 4”
Replacement of power cylinder of bore below 4”
Servicing of power cylinder of bore 4”~10”
Replacement of power cylinder of bore 4”~10”
Servicing of power cylinder of bore above 10”
Replacement of power cylinder of bore above 10”
Servicing of electrical actuator
Replacement of electrical actuator
Adjustment/calibration of positioner
Adjustment/calibration of position feedback unit
Laying of 12~16mm SS tube with support
Laying of 28mm SS tube with support
Loop checking
Covering instrument by transparent polythene cover
FTU replacement at DCS
Fan/Filter cleaning at DCS/PLC/LVS
Igniter rod chokage cleaning
Unit Mill Area Instrument cleaning
Unit Coal Feeder Area cleaning
Unit Boiler Front Area (0~12M) cleaning
Unit Boiler Front Area (15~32M) cleaning
Unit Boiler Front Area (35~60M) cleaning
Unit DCS Room Panel (Control Room, Engineering Work Station, Equipment Room) cleaning
Unit PA/ID/FD/CST area Instrument cleaning
CPU (Control Room, Mixed Bed, Regeneration, Neutralising) Instrument cleaning
Unit SWAS cleaning
INDWELL CONSTRUCTIONS PVT LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .