| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L Quoted ₹10.1 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹10.5 L+₹35,889 (3.56%)Rejected-AOC CIVIL LINE MATATILA ROAD TALBEHAT DISTT LALITPUR U P | TALBEHAT | LALITPUR | U P | ₹10.5 L+₹35,889 (3.56%) | L2 | Rejected-AOC NOT LOWEST BIDDER |
| 3 | L3₹10.5 L+₹43,846 (4.34%)Rejected-AOC | ₹10.5 L+₹43,846 (4.34%) | L3 | Rejected-AOC NOT LOWEST BIDDER |
| 4 | L4₹10.7 L+₹58,354 (5.78%)Rejected-AOC 1442 1 NANADANPURA BABINA CANTT TEHSIL DISTT JHANSI UP | BABINA | JHANSI | UP | ₹10.7 L+₹58,354 (5.78%) | L4 | Rejected-AOC NOT LOWEST BIDDER |
| 5 | L5₹10.7 L+₹60,908 (6.04%)Rejected-AOC | ₹10.7 L+₹60,908 (6.04%) | L5 | Rejected-AOC NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/S SACHENDRA KUMAR JAIN L7 | M/S SHIVA TRADERS L4 | HARNAM SINGH ANIL SINGH L2 | M/S R.S.BUNDELA & SONS L5 | M/s Dinesh Kumar L8 | MS SHUBHAM SANTOSH JAIN L1 | PRATAP CONSTRUCTION L3 | M/S JAI BALAJI TRADERS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and getting out in soft/loose soil etc. including trimming bottom and sides of trenches, leveling/ grading and ramming bottom of excavation complete all as specified and directed. | 220 | Cum | 260 ₹57,200 | 254 ₹55,880 | 260 ₹57,200 | 270 ₹59,400 | 255 ₹56,100 | 250 ₹55,000 Lowest | 265 ₹58,300 | 258 ₹56,760 |
| 2.00 | M&L for Excavating over areas, n exc 1.5 m deep and getting out soft/loose soil complete all as specified and directed. | 12 | Cum | 235 ₹2,820 | 220 ₹2,640 Lowest | 270 ₹3,240 | 278 ₹3,336 | 255 ₹3,060 | 250 ₹3,000 | 275 ₹3,300 | 238 ₹2,856 |
| 3.00 | item no 2 above but each additional 1.5 m or part thereof in depth beyond the first 1.5 m getting out soft/loose soil complete all as specified and directed. | 5 | Cum | 235 ₹1,175 | 228 ₹1,140 | 230 ₹1,150 | 238 ₹1,190 | 229 ₹1,145 | 200 ₹1,000 Lowest | 235 ₹1,175 | 241 ₹1,205 |
| 4.00 | Demolition and breaking up 150 mm dia (Salt glazed ware ,AC / CI or reinforced concrete) set in cement mortor drain pipe, jointed set in cement mortor.incl pcc if any and taking out of trenches,floor & walls if required complete all as specified and directed. | 320 | RM | 45 ₹14,400 | 44 ₹14,080 Lowest | 51 ₹16,320 | 51 ₹16,320 | 48 ₹15,360 | 50 ₹16,000 | 49 ₹15,680 | 44 ₹14,080 Lowest |
| 5.00 | M&L for 150 mm bore SGSW drain pipe (Grade-A) laid in trenches and jointed in CM 1:1 and tested complete all as specified and directed. Make: | 320 | RM | 605 ₹1,93,600 | 598 ₹1,91,360 Lowest | 605 ₹1,93,600 | 605 ₹1,93,600 | 602 ₹1,92,640 | 600 ₹1,92,000 | 603 ₹1,92,960 | 603 ₹1,92,960 |
| 6.00 | M&L for concrete bed for 150 mm bore pipe in laid with PCC 1:4:8 type D-2 to drain pipes including packing under, haunching against the sides of pipes after they are laid and tested complete all as specified and directed. | 320 | RM | 105 ₹33,600 | 95 ₹30,400 Lowest | 102 ₹32,640 | 105 ₹33,600 | 99 ₹31,680 | 100 ₹32,000 | 99 ₹31,680 | 104 ₹33,280 |
| 7.00 | Returning, filing in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in soft/loose soil complete all as specified and directed. | 170 | Cum | 65 ₹11,050 | 64 ₹10,880 Lowest | 72 ₹12,240 | 76 ₹12,920 | 69 ₹11,730 | 70 ₹11,900 | 73 ₹12,410 | 68 ₹11,560 |
| 8.00 | Removing surplus excavated soil to a distance exc 250m but n/exc 500m and depositing where directed | 50 | Cum | 95 ₹4,750 | 98 ₹4,900 | 102 ₹5,100 | 105 ₹5,250 | 104 ₹5,200 | 100 ₹5,000 | 103 ₹5,150 | 92 ₹4,600 Lowest |
| 9.00 | M&L for PCC 1:4:8, type D-2 using 40mm graded stone aggregate as in foundations, fillings, mass concreting complete all as specified and directed. | 30 | Cum | 4,706 ₹1,41,180 | 4,750 ₹1,42,500 | 4,700 ₹1,41,000 Lowest | 4,705 ₹1,41,150 | 4,800 ₹1,44,000 | 4,800 ₹1,44,000 | 4,701 ₹1,41,030 | 4,702 ₹1,41,060 |
| 10.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed.
Note: All debris obtained from demolition shall be removed 1.5km to 2km complete all as specified and as directed. | 1 | Cum | 458 ₹458 | 455 ₹455 Lowest | 490 ₹490 | 479 ₹479 | 500 ₹500 | 550 ₹550 | 485 ₹485 | 455 ₹455 Lowest |
Tender Value
₹10.0 L
EMD Value
₹19,990
Closing Date
20 Jul 2026, 6:00 pmClosed
BRIJ BIHARI, AE (CIVIL), AGE (I) TALBEHAT
AGE (I) TALBEHAT, LAKEVIEW CAMP MIL STN TALBEHAT 284125
REPAIR/CLEANING OF SEWAGE LINE, SEPTIC TANK, MANHOLE AND OTHER MISC WORK FOR AREA I AND II AT TALBEHAT MIL STATION
2026_MES_762006_2
AGE(I)/TBT/TOK-06/2026-27
Open Tender
Civil Works
Item Rate
330 days
LAKEVIEW CAMP MIL STN TALBEHAT 284125
7 documents required · 7 mandatory
₹500
AGE (I) TALBEHAT
₹19,990
Yes
24 Aug 2026
11 Jul 2026
22 Jul 2026
11 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and getting out in soft/loose soil etc. including trimming bottom and sides of trenches, leveling/ grading and ramming bottom of excavation complete all as specified and directed. | 220 | Cum | - | - |
| 2 | M&L for Excavating over areas, n exc 1.5 m deep and getting out soft/loose soil complete all as specified and directed. | 12 | Cum | - | - |
| 3 | item no 2 above but each additional 1.5 m or part thereof in depth beyond the first 1.5 m getting out soft/loose soil complete all as specified and directed. | 5 | Cum | - | - |
| 4 | Demolition and breaking up 150 mm dia (Salt glazed ware ,AC / CI or reinforced concrete) set in cement mortor drain pipe, jointed set in cement mortor.incl pcc if any and taking out of trenches,floor & walls if required complete all as specified and directed. | 320 | RM | - | - |
| 5 | M&L for 150 mm bore SGSW drain pipe (Grade-A) laid in trenches and jointed in CM 1:1 and tested complete all as specified and directed. Make: | 320 | RM | - | - |
| 6 | M&L for concrete bed for 150 mm bore pipe in laid with PCC 1:4:8 type D-2 to drain pipes including packing under, haunching against the sides of pipes after they are laid and tested complete all as specified and directed. | 320 | RM | - | - |
| 7 | Returning, filing in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick in soft/loose soil complete all as specified and directed. | 170 | Cum | - | - |
| 8 | Removing surplus excavated soil to a distance exc 250m but n/exc 500m and depositing where directed | - | Cum | - | - |
| 9 | M&L for PCC 1:4:8, type D-2 using 40mm graded stone aggregate as in foundations, fillings, mass concreting complete all as specified and directed. | 30 | Cum | - | - |
| 10 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed.
Note: All debris obtained from demolition shall be removed 1.5km to 2km complete all as specified and as directed. | 1 | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TENDER.pdf
Tender Documents • 0.98 MB
BOQ_871415.xls
BOQ • 4.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .