| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹16,646.02 (0.05%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹3.1 Cr+₹16,646.02 (0.05%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹8.4 L (2.74%)Admitted-Finance | ₹3.1 Cr+₹8.4 L (2.74%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 Cr+₹13.4 L (4.38%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹3.2 Cr+₹13.4 L (4.38%) | L4 | Admitted-Finance |
| 5 | L5₹3.4 Cr+₹34.2 L (11.2%)Admitted-Finance NO 15A NETHAJI NAGAR 8TH STREET ENNORE HIGH ROAD CHENNAI 600057 | CHENNAI | CHENNAI | TAMIL NADU | 600057 | ₹3.4 Cr+₹34.2 L (11.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L4 | H.Venkateswaran L6 | GUHANSANJEEVI ENTERPRISES L3 | M s Kumaresan and co L2 | C.PERIYASAMY L1 | JD ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete. | 26 | Loc. | 2,000 ₹52,000 | 4,000 ₹1,04,000 | 1,500 ₹39,000 | 1,500 ₹39,000 | 1,000 ₹26,000 Lowest | 2,500 ₹65,000 |
| 2.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard gravelly soil | 2,074 | Cum | 300 ₹6,22,200 | 200 ₹4,14,800 | 110 ₹2,28,140 | 150 ₹3,11,100 | 100 ₹2,07,400 Lowest | 250 ₹5,18,500 |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In soft distengrated rock not requiring blasting | 296 | Cum | 300 ₹88,800 | 200 ₹59,200 | 140 ₹41,440 | 200 ₹59,200 | 100 ₹29,600 Lowest | 250 ₹74,000 |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In medium rock and dense medium rock not requiring blasting | 296 | Cum | 300 ₹88,800 | 200 ₹59,200 | 270 ₹79,920 | 50 ₹14,800 Lowest | 100 ₹29,600 | 250 ₹74,000 |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring blasting | 148 | Cum | 300 ₹44,400 | 1,500 ₹2,22,000 | 600 ₹88,800 | 50 ₹7,400 Lowest | 100 ₹14,800 | 250 ₹37,000 |
| 6.00 | Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation.
In Hard rock requiring Wedging and chesiling | 148 | Cum | 300 ₹44,400 | 200 ₹29,600 | 1,300 ₹1,92,400 | 1,000 ₹1,48,000 | 100 ₹14,800 Lowest | 1,000 ₹1,48,000 |
| 7.00 | Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 19 | Loc. | 8,000 ₹1,52,000 Lowest | 25,000 ₹4,75,000 | 22,000 ₹4,18,000 | 25,000 ₹4,75,000 | 9,500 ₹1,80,500 | 25,000 ₹4,75,000 |
| 8.00 | Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 7 | Loc. | 10,000 ₹70,000 Lowest | 35,000 ₹2,45,000 | 30,000 ₹2,10,000 | 35,000 ₹2,45,000 | 10,000 ₹70,000 Lowest | 35,000 ₹2,45,000 |
| 9.00 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete. | 118 | Hrs | 100 ₹11,800 | 300 ₹35,400 | 50 ₹5,900 | 10 ₹1,180 | 1 ₹118 Lowest | 10 ₹1,180 |
| 10.00 | Providing shoring and shuttering with CW Scantlings and planks including cost of all materials, labour etc., complete. | 860 | sqm | 10 ₹8,600 | 100 ₹86,000 | 100 ₹86,000 | 10 ₹8,600 | 1 ₹860 Lowest | 10 ₹8,600 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
15 Jul 2024, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Earth work excavation, stub setting, concreting, Supply, Transporting and Erection of DC tower with transport , Stringing of 3 Nos. Panther conductor , 1 No. of Earthwire and supply, fixing of Hardware fittings for erection of 110 KV SC line on DC
2024_EB_458693_1
TP1-08/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
KRISHNAGIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.2 L
Yes
15 Nov 2024
1 Jul 2024
16 Jul 2024
1 Jul 2024
15 Jul 2024
1 Jul 2024
Amount
Check surveying and pit marking of tower locations including cost of all labour, lead, lift, hire charges for T&P etc complete.
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In medium rock and dense medium rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring blasting
Earth work excavation in all type of soil with an initial lead of 10m and initial lift of 2m etc., complete.for foundation. In Hard rock requiring Wedging and chesiling
Fixing of templates, stub and cleat for HCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Fixing of templates, stub and cleat for KCR tower with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete.
Providing shoring and shuttering with CW Scantlings and planks including cost of all materials, labour etc., complete.
PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P,labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete.
PCC 1:2:4 using 20 mm HB Stone for tower foundation with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete,labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for Retaing wall raft without formwork including cost of all materials, labour lead, litf, curing, etc., complete. but excluding the cost of steel reinforcement.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for Retaing wall raft & Wall with formwork including cost of all materials, labour lead, litf, curing, etc., complete. but excluding the cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Back filling of tower pits after laying of stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete
Removal of excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Providing pipe type earthing including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete
Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts whereever necessary, patch painting, cutting of angles wherever necessary, minor fabrication workss, final checking, cost of T & P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials,adhering to the BOCW act 1996 and rules 2006 without any compromise all leads and lifts etc., complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of ST fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Supplying and fixing of name board of size 0.75 x 0.45m using 18 gauge MS Sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labour, lead, lift, etc., complete..
Painting with two coats of anticorrosive paint over tower leg at a height of 45 cm including all cost of materials,labour, lead lift etc complete
Providing well supported trussels up to 5m height for road crossing including cost of all materials labour lead and lift etc complete as directed by the Engineer at site.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead, lift etc complete
Tack welding of bolts & Nuts in the newly erected towers up to bottom cross arm level including of three tack weld for each bolts & Nuts hire charges of welding machine, cost of welding rods, transporting charges and painting with cold galvanizing and tightening of bolts wherever necessary including cost of all materials, labour, lead, lift,, transporting hire charges etc. complete.
Labour charges for transport of 6 Nos of Panther conductor, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For span
Labour charges for transport of 1 No. of Earthwire , Payingout, stringing and jubmering of earthwire with fittings etc complete.As directed by the Engineer at site. For span
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
Clearing light jungle including all cost of labour, lead, lift etc complete.
Providing Special type earthing arrangements for Teriminal tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Supply, transporting and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supply, transporting and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Supply, transport and fixing of Single Tension fittings for panther as per design drawing and specifications.
Supply, transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
Supply, transport and fixing of SB damber for panther as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Panther as per design drawing and specifications
Supply, transport and fixing of Repair sleeve for Panther as per design drawing and specifications
Supply, transport and fixing of 16 mm dia. U Bolt and Nuts/ Hanger rods as per design drawing and specifications
Supply, transport and fixing of Single Tension fittings for Earthwire as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Earthwire as per design drawing and specifications
Supply, transport and fixing of Aluminium earthbond as per design drawing and specifications
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M s Kumaresan and co (BID ID -1082031)
GUHANSANJEEVI ENTERPRISES (BID ID -1081871)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1076645)
JD ENTERPRISES (BID ID -1082692)
H.Venkateswaran (BID ID -1079697)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .